Alder Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2021 to Aug 2026
- Last 24 months
- 13 permits filed
36 permits since 2000: 30 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 3 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2023 | Completed final sign-off Feb 2024 | 3148 Clay St | repair existing deck. no more than 50% in kind.Details
repair existing deck. no more than 50% in kind. | $5,000 |
| Mar 24, 2023 | Completed final sign-off Aug 2023 | 140 Taraval St | rev to pa# 2022-0629-7349: add fire walls on east and west side of deckDetails
rev to pa# 2022-0629-7349: add fire walls on east and west side of deck | $2,000 |
| Jun 29, 2022 | Completed final sign-off Aug 2023 | 140 Taraval St | create new in rear yard above e grade with new stair connec tion to lower portion of rear yard. creae new catwalk connecting new deck to e home. no alteration within e homeDetails
create new in rear yard above e grade with new stair connec tion to lower portion of rear yard. creae new catwalk connecting new deck to e home. no alteration within e home | $19,370 |
| Apr 1, 2022 | Completed final sign-off Sep 2022 | 264 16th Av | old rotting deck to be removed. new deck to be constructed, same dimensions as old.Details
old rotting deck to be removed. new deck to be constructed, same dimensions as old. | $50,000 |
| Oct 15, 2021 | Completed final sign-off Sep 2022 | 264 16th Av | repairing dry rot on an existing deck. approximately 40% of framing to be replaced.Details
repairing dry rot on an existing deck. approximately 40% of framing to be replaced. | $6,000 |