Back to kitchen remodel contractors
Alde Construction
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2006 to Oct 2011
- Last 24 months
- 0 permits filed
18 permits since 2000: 17 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2009 | Completed final sign-off Mar 2010 | 2562 31st Av | legalize existing family room & 1 bathroom, replace & enlarge 2 windows at garage floor. remodel existing kitchen & remodel existing bath. install 1 new bathroom at 2nd floor.Details
legalize existing family room & 1 bathroom, replace & enlarge 2 windows at garage floor. remodel existing kitchen & remodel existing bath. install 1 new bathroom at 2nd floor. | $28,000 |
| Dec 15, 2008 | Completed final sign-off Mar 2009 | 191 Middlefield Dr | garage floor remodel, install 1 family room, 1 bath, 1 laundry room at garage floor. 1st and 2nd level: remodel e bathroom and kitchen, relocate stair to garageDetails
garage floor remodel, install 1 family room, 1 bath, 1 laundry room at garage floor. 1st and 2nd level: remodel e bathroom and kitchen, relocate stair to garage | $25,000 |
| Oct 24, 2008 | Completed final sign-off Dec 2008 | 30 Faxon Av | 1)remove extg bathroom, extg family room and extg kitchen in ground level.2) install 1 new bathroom and 1 storage room at garage floor. to be legalizedDetails
1)remove extg bathroom, extg family room and extg kitchen in ground level.2) install 1 new bathroom and 1 storage room at garage floor. to be legalized | $15,000 |
| Oct 4, 2006 | Completed final sign-off Dec 2007 | 610 Tompkins Av | conversion/tenant. improvement at one (e) ground floor classrm to children's preschool room. includes children's restroom, kitchen storage and staff toilet. improvements for exterior path of travel for accessibility.Details
conversion/tenant. improvement at one (e) ground floor classrm to children's preschool room. includes children's restroom, kitchen storage and staff toilet. improvements for exterior path of travel for accessibility. | $115,000 |
| Mar 28, 2006 | Completed final sign-off Jun 2006 | 678 24th Av | remove and install (n) cabinet install (n) hardwood floor install gfi outlet granite counter top remodeling kitchen on second floorDetails
remove and install (n) cabinet install (n) hardwood floor install gfi outlet granite counter top remodeling kitchen on second floor | $7,300 |