Back to bathroom remodel contractors
Alde Construction
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2006 to Oct 2011
- Last 24 months
- 0 permits filed
18 permits since 2000: 17 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2009 | Completed final sign-off Mar 2010 | 2562 31st Av | revision to appl #200911100924 - relocate bathroom @ ground floor, rearrange and enlarge two (2) bathrooms @ 2nd floor.Details
revision to appl #200911100924 - relocate bathroom @ ground floor, rearrange and enlarge two (2) bathrooms @ 2nd floor. | |
| Nov 10, 2009 | Completed final sign-off Mar 2010 | 2562 31st Av | legalize existing family room & 1 bathroom, replace & enlarge 2 windows at garage floor. remodel existing kitchen & remodel existing bath. install 1 new bathroom at 2nd floor.Details
legalize existing family room & 1 bathroom, replace & enlarge 2 windows at garage floor. remodel existing kitchen & remodel existing bath. install 1 new bathroom at 2nd floor. | $28,000 |
| Apr 17, 2009 | Completed final sign-off Dec 2009 | 555 Francisco St | construction phase revisions to pa 2008.0423.0458 and pa 2008.1021.4675. reclassify floor 2 as accessory dwelling. redesign floor 2 bathroom as non-accessible (not required for dwelling).Details
construction phase revisions to pa 2008.0423.0458 and pa 2008.1021.4675. reclassify floor 2 as accessory dwelling. redesign floor 2 bathroom as non-accessible (not required for dwelling). | |
| Dec 15, 2008 | Completed final sign-off Mar 2009 | 191 Middlefield Dr | garage floor remodel, install 1 family room, 1 bath, 1 laundry room at garage floor. 1st and 2nd level: remodel e bathroom and kitchen, relocate stair to garageDetails
garage floor remodel, install 1 family room, 1 bath, 1 laundry room at garage floor. 1st and 2nd level: remodel e bathroom and kitchen, relocate stair to garage | $25,000 |
| Oct 24, 2008 | Completed final sign-off Dec 2008 | 30 Faxon Av | 1)remove extg bathroom, extg family room and extg kitchen in ground level.2) install 1 new bathroom and 1 storage room at garage floor. to be legalizedDetails
1)remove extg bathroom, extg family room and extg kitchen in ground level.2) install 1 new bathroom and 1 storage room at garage floor. to be legalized | $15,000 |
| Apr 5, 2007 | Completed final sign-off Aug 2007 | 645 Dartmouth St | garage floor and 2nd floor remodeling: instalal storage and laundry room & (1) bathroom at garage floor, convert (e) family room to (1) bedroom & (1) study room. install (1) bathroom at 2nd floor.Details
garage floor and 2nd floor remodeling: instalal storage and laundry room & (1) bathroom at garage floor, convert (e) family room to (1) bedroom & (1) study room. install (1) bathroom at 2nd floor. | $25,000 |