Back to kitchen remodel contractors
Albert Chow
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to Jan 2026
- Last 24 months
- 7 permits filed
82 permits since 2000: 67 completed, 2 in progress, 12 never finaled, 1 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 17 completed, 5 never finaled. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2023 | Completed final sign-off Feb 2024 | 355 15th Av | unit# 1 & 3: kitchen remodel, like for like, new cabinets, stove, sink and add additional outlets. same work, same floor plan.Details
unit# 1 & 3: kitchen remodel, like for like, new cabinets, stove, sink and add additional outlets. same work, same floor plan. | $7,000 |
| Mar 27, 2023 | Never finaled issued Mar 2023, no final | 1306 Guerrero St | replace kitchen in kind: replace cabinets, new appliances, update electrical.Details
replace kitchen in kind: replace cabinets, new appliances, update electrical. | $35,000 |
| Jan 17, 2022 | Completed final sign-off Feb 2023 | 629 09th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $70,000 |
| Jul 23, 2021 | Never finaled filed Jul 2021, never issued | 2779 37th Av | house remodel w/ rear addition: remodel living, dining and kitchen, add new bathroom, add new bedroom@ the rear on 2nd level. remodel existing bathroom, bedroom. construct new bedroom, bathroom, recreation room, laundry room on 1st floor.Details
house remodel w/ rear addition: remodel living, dining and kitchen, add new bathroom, add new bedroom@ the rear on 2nd level. remodel existing bathroom, bedroom. construct new bedroom, bathroom, recreation room, laundry room on 1st floor. | $400,000 |
| Dec 18, 2020 | Completed final sign-off May 2021 | 79 Molimo Dr | replace kitchen in kind. retain same walls. replace cabinets, appliances, flooring, and update electrical outletsDetails
replace kitchen in kind. retain same walls. replace cabinets, appliances, flooring, and update electrical outlets | $25,000 |
| Sep 30, 2020 | Completed final sign-off Mar 2022 | 2137 18th St | remodel kitchen and bathroom in-kind upstairs. remodel downstair existing half bathroom and laundry in-kind. add new outlet, replace 2 backyard facing windows downstair (non st visible).Details
remodel kitchen and bathroom in-kind upstairs. remodel downstair existing half bathroom and laundry in-kind. add new outlet, replace 2 backyard facing windows downstair (non st visible). | $75,000 |
| Jan 30, 2020 | Completed final sign-off Sep 2020 | 1212 16th Av | remodel kitchen and bathoom in kind at 2nd floor.Details
remodel kitchen and bathoom in kind at 2nd floor. | $40,000 |
| Oct 7, 2019 | Completed final sign-off Jan 2020 | 2277 15th Av | kitchen remodel in kind: replace kitchen cabinets, sinks and counter tops. update kitchne electrical outlets and new appliances. replace kitchen windows which is not visible from the street.Details
kitchen remodel in kind: replace kitchen cabinets, sinks and counter tops. update kitchne electrical outlets and new appliances. replace kitchen windows which is not visible from the street. | $38,000 |
| Apr 6, 2017 | Completed final sign-off Apr 2018 | 514 46th Av | unit #514 only-kitchen and bathroom remodel: kitchen-replace cabinets, sink, stove in kind, new led recessed lights and gfci outlets along counter. bathroom-cancel shower stall to make tub/shower unit, replace toilet, sink in kind, new led lighting and gfci outlets.Details
unit #514 only-kitchen and bathroom remodel: kitchen-replace cabinets, sink, stove in kind, new led recessed lights and gfci outlets along counter. bathroom-cancel shower stall to make tub/shower unit, replace toilet, sink in kind, new led lighting and gfci outlets. | $35,000 |
| Feb 13, 2017 | Never finaled issued Oct 2017, no final | 1543 07th Av | this project consists of converting basement to secondary dwelling unit. scope of consists of 1)wall, roof, and stair framing. 2) electrical and plumbing work. 3)new kitchen and bathrooms. 4)hvac work.Details
this project consists of converting basement to secondary dwelling unit. scope of consists of 1)wall, roof, and stair framing. 2) electrical and plumbing work. 3)new kitchen and bathrooms. 4)hvac work. | $120,000 |
| Sep 8, 2016 | Completed final sign-off Dec 2017 | 1209 Oak St | kitchen & bathroom remodel. install new high efficacy lighting.Details
kitchen & bathroom remodel. install new high efficacy lighting. | $30,000 |
| Apr 27, 2016 | Completed final sign-off Oct 2016 | 4533 Cabrillo St | remodel residential kitchen in-kind, relace cabinets, outlets, sink and d/w.Details
remodel residential kitchen in-kind, relace cabinets, outlets, sink and d/w. | $23,000 |
| Sep 14, 2015 | Completed final sign-off May 2016 | 355 15th Av | in apt. #3: remodel kitchen and bathroom by replacing cabinets and fixtures in kind. replace 3 windows with vinyl windows which do not face streetDetails
in apt. #3: remodel kitchen and bathroom by replacing cabinets and fixtures in kind. replace 3 windows with vinyl windows which do not face street | $35,000 |
| May 5, 2015 | Completed final sign-off Nov 2015 | 1724 Burrows St | replace bathroom in kind: new fixtures, new drywall, new floor. replace a kitchen in kind: new cabinets, new drywall, new floor. replace drywall in 2 bedrooms. (all remodel are within same original space.) kitchen lighting and control per cec 150(k)Details
replace bathroom in kind: new fixtures, new drywall, new floor. replace a kitchen in kind: new cabinets, new drywall, new floor. replace drywall in 2 bedrooms. (all remodel are within same original space.) kitchen lighting and control per cec 150(k) | $45,000 |
| Sep 17, 2014 | Completed final sign-off Sep 2015 | 2821 37th Av | revision to existing pa# 201407151331. drywall and tile floor for kitchen/dining area. kitchen shall be a free standing furniture kitchen.Details
revision to existing pa# 201407151331. drywall and tile floor for kitchen/dining area. kitchen shall be a free standing furniture kitchen. | $12,000 |
| Aug 30, 2013 | Completed final sign-off Feb 2014 | 1715 44th Av | kitchen remodel - remove sink to adjacent wall, replace cabinets, new drywall on walls and ceiling, new led recessed lighting, new circuit for outlets and appliances, new doorDetails
kitchen remodel - remove sink to adjacent wall, replace cabinets, new drywall on walls and ceiling, new led recessed lighting, new circuit for outlets and appliances, new door | $13,000 |
| Aug 12, 2013 | Never finaled issued Aug 2013, no final | 3779 San Bruno Av | replace water main supply line from meter into house, replace broken 2" kitchen drain line and install new gfci outlet in garage. no structural work.Details
replace water main supply line from meter into house, replace broken 2" kitchen drain line and install new gfci outlet in garage. no structural work. | $5,000 |
| Aug 12, 2013 | Never finaled issued Aug 2013, no final | 127 Retiro Wy | kitchen remodel: replace cabinets, center & appliances in-kind. replace (e) recessed lights with led recessed lights. replace two windows in kitchen with vinyl windows not visible from street. maximum u factor is 0.4 ac.Details
kitchen remodel: replace cabinets, center & appliances in-kind. replace (e) recessed lights with led recessed lights. replace two windows in kitchen with vinyl windows not visible from street. maximum u factor is 0.4 ac. | $30,000 |
| Nov 13, 2008 | Completed final sign-off Mar 2009 | 362 05th Av | remodel two kitchens, update electrical , floor plan is unattected, install new sink, stove, range hood. bathrooms (2) replace toilet and sink/faucet only. replace 12 windows facing rear & sides with none at front.Details
remodel two kitchens, update electrical , floor plan is unattected, install new sink, stove, range hood. bathrooms (2) replace toilet and sink/faucet only. replace 12 windows facing rear & sides with none at front. | $43,000 |
| Feb 27, 2008 | Completed final sign-off Jul 2008 | 754 29th Av | kitchen remodel: new cabinets, new sheetrock on walls, replace 2 windows, same same location not visible from street,, replace kitchen back door, connect plumbing for new fixtures & applicances, install fluorecent lighting. windows u-factor 0.67 max. r-13 wall insulation.Details
kitchen remodel: new cabinets, new sheetrock on walls, replace 2 windows, same same location not visible from street,, replace kitchen back door, connect plumbing for new fixtures & applicances, install fluorecent lighting. windows u-factor 0.67 max. r-13 wall insulation. | $26,500 |
| Feb 13, 2007 | Completed final sign-off Jun 2007 | 678 26th Av | remodel 1 kitchen & 2 bathroom. replace plaster with drywall, new cabinetry. tile flooring. update electrical & old galvanized incoming supply.Details
remodel 1 kitchen & 2 bathroom. replace plaster with drywall, new cabinetry. tile flooring. update electrical & old galvanized incoming supply. | $33,000 |
| Apr 27, 2005 | Completed final sign-off Jun 2005 | 651 35th Av | replace existing kitchen in kind with new cabinets, counter, sink, and lightingDetails
replace existing kitchen in kind with new cabinets, counter, sink, and lighting | $13,000 |