Back to bathroom remodel contractors
Albert Chow
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to Jan 2026
- Last 24 months
- 7 permits filed
82 permits since 2000: 67 completed, 2 in progress, 12 never finaled, 1 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
39 bathroom remodel permits: 32 completed, 2 in progress, 5 never finaled. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 8, 2026 | Completed final sign-off Jun 2026 | 2467 28th Av | 2nd floor: bathroom remodel in kind. tub to shower conversion.Details
2nd floor: bathroom remodel in kind. tub to shower conversion. | $36,000 |
| Jan 30, 2025 | In progress issued Feb 2025 | 1821 Taraval St | comply with nov# 2024-27845. repair building after a fire damage in kind. no structural work. in retail - replace drywall at ceiling and walls in front 25' of store. install new electrical panels. in (e) retail bath - replace toilet and sink.Details
comply with nov# 2024-27845. repair building after a fire damage in kind. no structural work. in retail - replace drywall at ceiling and walls in front 25' of store. install new electrical panels. in (e) retail bath - replace toilet and sink. | $170,000 |
| Jun 11, 2024 | Completed final sign-off Sep 2024 | 2243 41st Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $20,000 |
| Jan 4, 2024 | In progress issued Dec 2024 | 1328 Vallejo St | common area: convert storage area in garage/basement into rec room w/ bath & bar.Details
common area: convert storage area in garage/basement into rec room w/ bath & bar. | $50,000 |
| Jul 25, 2023 | Completed final sign-off Nov 2023 | 2575 38th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $17,000 |
| May 24, 2023 | Completed final sign-off Aug 2023 | 537 Garfield St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $21,000 |
| May 6, 2022 | Completed final sign-off Oct 2022 | 2094 43rd Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $22,000 |
| Jan 17, 2022 | Completed final sign-off Feb 2023 | 629 09th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $70,000 |
| Jul 23, 2021 | Never finaled filed Jul 2021, never issued | 2779 37th Av | house remodel w/ rear addition: remodel living, dining and kitchen, add new bathroom, add new bedroom@ the rear on 2nd level. remodel existing bathroom, bedroom. construct new bedroom, bathroom, recreation room, laundry room on 1st floor.Details
house remodel w/ rear addition: remodel living, dining and kitchen, add new bathroom, add new bedroom@ the rear on 2nd level. remodel existing bathroom, bedroom. construct new bedroom, bathroom, recreation room, laundry room on 1st floor. | $400,000 |
| Mar 23, 2021 | Completed final sign-off Mar 2022 | 2137 18th St | addition to no-plan pa# 202009305537. expand scope of work to include a new master bath & closet on 2nd fl. new skylight over stairs. remodel (e) bedroom, half bath & laundry area on 1st fl.Details
addition to no-plan pa# 202009305537. expand scope of work to include a new master bath & closet on 2nd fl. new skylight over stairs. remodel (e) bedroom, half bath & laundry area on 1st fl. | $130,000 |
| Dec 11, 2020 | Never finaled issued Apr 2021, no final | 1561 34th Av | remodel existing half bath to full bathroom. remodel laundry on ground floor. replace 2 windows and door at rear.Details
remodel existing half bath to full bathroom. remodel laundry on ground floor. replace 2 windows and door at rear. | $18,500 |
| Sep 30, 2020 | Completed final sign-off Mar 2022 | 2137 18th St | remodel kitchen and bathroom in-kind upstairs. remodel downstair existing half bathroom and laundry in-kind. add new outlet, replace 2 backyard facing windows downstair (non st visible).Details
remodel kitchen and bathroom in-kind upstairs. remodel downstair existing half bathroom and laundry in-kind. add new outlet, replace 2 backyard facing windows downstair (non st visible). | $75,000 |
| Jun 15, 2020 | Completed final sign-off Nov 2020 | 2747 37th Av | remodel existing bathroom in kind: replace toilet, sink, medicine cabinet and shower stall.Details
remodel existing bathroom in kind: replace toilet, sink, medicine cabinet and shower stall. | $20,000 |
| Mar 19, 2019 | Never finaled issued Apr 2019, no final | 1719 Quintara St | build in downstairs: bedroom, office, and bathroom, replace 2 rear windows per drawings.Details
build in downstairs: bedroom, office, and bathroom, replace 2 rear windows per drawings. | $40,000 |
| Apr 30, 2018 | Completed final sign-off May 2019 | 6620 Geary Bl | unit #2 - convert (e) walk in closet into a bathroom. change location of bedroom door.Details
unit #2 - convert (e) walk in closet into a bathroom. change location of bedroom door. | $50,000 |
| Apr 6, 2017 | Completed final sign-off Apr 2018 | 514 46th Av | unit #514 only-kitchen and bathroom remodel: kitchen-replace cabinets, sink, stove in kind, new led recessed lights and gfci outlets along counter. bathroom-cancel shower stall to make tub/shower unit, replace toilet, sink in kind, new led lighting and gfci outlets.Details
unit #514 only-kitchen and bathroom remodel: kitchen-replace cabinets, sink, stove in kind, new led recessed lights and gfci outlets along counter. bathroom-cancel shower stall to make tub/shower unit, replace toilet, sink in kind, new led lighting and gfci outlets. | $35,000 |
| Mar 20, 2017 | Completed final sign-off Jun 2017 | 2530 39th Av | bathroom remodel: replace bath tub with pre-fab shower pan, new sink, new toilet, and exhaust fan, led vanity light and gfci outlet. no windowsDetails
bathroom remodel: replace bath tub with pre-fab shower pan, new sink, new toilet, and exhaust fan, led vanity light and gfci outlet. no windows | $13,000 |
| Feb 13, 2017 | Never finaled issued Oct 2017, no final | 1543 07th Av | this project consists of converting basement to secondary dwelling unit. scope of consists of 1)wall, roof, and stair framing. 2) electrical and plumbing work. 3)new kitchen and bathrooms. 4)hvac work.Details
this project consists of converting basement to secondary dwelling unit. scope of consists of 1)wall, roof, and stair framing. 2) electrical and plumbing work. 3)new kitchen and bathrooms. 4)hvac work. | $120,000 |
| Sep 8, 2016 | Completed final sign-off Dec 2017 | 1209 Oak St | kitchen & bathroom remodel. install new high efficacy lighting.Details
kitchen & bathroom remodel. install new high efficacy lighting. | $30,000 |
| Sep 14, 2015 | Completed final sign-off May 2016 | 355 15th Av | in apt. #3: remodel kitchen and bathroom by replacing cabinets and fixtures in kind. replace 3 windows with vinyl windows which do not face streetDetails
in apt. #3: remodel kitchen and bathroom by replacing cabinets and fixtures in kind. replace 3 windows with vinyl windows which do not face street | $35,000 |
| May 5, 2015 | Completed final sign-off Nov 2015 | 1724 Burrows St | replace bathroom in kind: new fixtures, new drywall, new floor. replace a kitchen in kind: new cabinets, new drywall, new floor. replace drywall in 2 bedrooms. (all remodel are within same original space.) kitchen lighting and control per cec 150(k)Details
replace bathroom in kind: new fixtures, new drywall, new floor. replace a kitchen in kind: new cabinets, new drywall, new floor. replace drywall in 2 bedrooms. (all remodel are within same original space.) kitchen lighting and control per cec 150(k) | $45,000 |
| Jan 20, 2015 | Completed final sign-off Apr 2015 | 121 Santa Rosa Av | remodel bathroom in kindDetails
remodel bathroom in kind | $16,000 |
| Jul 15, 2014 | Completed final sign-off Nov 2014 | 2920 Fulton St | unit 2922: replace rear windows in unit, 6 total, unit 2920: remodel bathroom and w.c. in-kind and replace rear windows, 6 total.Details
unit 2922: replace rear windows in unit, 6 total, unit 2920: remodel bathroom and w.c. in-kind and replace rear windows, 6 total. | $18,000 |
| Jul 15, 2014 | Completed final sign-off Sep 2015 | 2821 37th Av | replace drywall in all upstairs rooms, insulate walls and ceiling, add additional electrical outlets in all rooms. remodel bathroom in kind.Details
replace drywall in all upstairs rooms, insulate walls and ceiling, add additional electrical outlets in all rooms. remodel bathroom in kind. | $35,000 |
| May 28, 2014 | Completed final sign-off Aug 2014 | 2922 Fulton St | bathroom remodel- replace fixtures inkind as welll finish walls and floor; to comply with cec150k) 10 ; replace 8 windows at rear of house, with vinyl - none are street facing.Details
bathroom remodel- replace fixtures inkind as welll finish walls and floor; to comply with cec150k) 10 ; replace 8 windows at rear of house, with vinyl - none are street facing. | $18,000 |
| Apr 14, 2014 | Completed final sign-off Sep 2015 | 5830 Fulton St | 3/f: bathroom remodel, replace all fixtures & finishes in-kind & same location. no walls moved, removed or added.Details
3/f: bathroom remodel, replace all fixtures & finishes in-kind & same location. no walls moved, removed or added. | $32,000 |
| Jan 24, 2014 | Completed final sign-off Sep 2014 | 754 29th Av | bathroom remodel 3/f - replace all fixtures in kind. replace shower, tub, toilets and sink; install led lighting, exhaust fan, replace window with milgard fiberglass window not visbile from street; u-factor not > .32; to comply with cec150(k) 10Details
bathroom remodel 3/f - replace all fixtures in kind. replace shower, tub, toilets and sink; install led lighting, exhaust fan, replace window with milgard fiberglass window not visbile from street; u-factor not > .32; to comply with cec150(k) 10 | $15,000 |
| Apr 26, 2013 | Never finaled issued Apr 2013, no final | 1524 Irving St | ada access barrier removal: work in the restaurant space: lower raised floor of bathroom flush w/existing floor, install power handicap door, widen door to bathroom, eliminate some walls in bathroom, build a ramp to access rear of restaurant.Details
ada access barrier removal: work in the restaurant space: lower raised floor of bathroom flush w/existing floor, install power handicap door, widen door to bathroom, eliminate some walls in bathroom, build a ramp to access rear of restaurant. | $16,000 |
| Oct 1, 2012 | Completed final sign-off Jan 2013 | 1369 Vallejo St | 1369:replace bathroom, water closet and dining room windows with iwc brand 5500 series vinyle windows not facing street. front windows replace with insert wood windows in kind. 1371 replace bathrooms, water closet, dining and office windows same iwc vinyl windows.Details
1369:replace bathroom, water closet and dining room windows with iwc brand 5500 series vinyle windows not facing street. front windows replace with insert wood windows in kind. 1371 replace bathrooms, water closet, dining and office windows same iwc vinyl windows. | $9,500 |
| Aug 15, 2012 | Completed final sign-off Aug 2012 | 348 Point Lobos Av | provide proper ventilation to dryer, gfi electrical outlet to the top floor front bathroom to comply with housing nov #20125222. electical permit is required.Details
provide proper ventilation to dryer, gfi electrical outlet to the top floor front bathroom to comply with housing nov #20125222. electical permit is required. | $1,000 |
| May 2, 2012 | Completed final sign-off Jun 2014 | 2688 36th Av | upper level: remove extg bath; add 1/2 bath (powder room). lower level:complete/add bedroom; bath, family, laundry plus 74 sq ftDetails
upper level: remove extg bath; add 1/2 bath (powder room). lower level:complete/add bedroom; bath, family, laundry plus 74 sq ft | $85,000 |
| Feb 28, 2011 | Completed final sign-off Apr 2011 | 2277 15th Av | main level bathroom remodel: replace bath tub with fixture, toilet, sink with cabinet in kind. no structural changes. no new lighting.Details
main level bathroom remodel: replace bath tub with fixture, toilet, sink with cabinet in kind. no structural changes. no new lighting. | $10,000 |
| Oct 22, 2009 | Completed final sign-off Mar 2010 | 754 29th Av | bath remodel, remove existing toilet, sink, and tub, replace in kind. replace 2 windows in bathroom, not visible from street, in kind, new lighting, 0.67 max, r-13 walldrywall walls, ceiling, tile floor. no wall changes,Details
bath remodel, remove existing toilet, sink, and tub, replace in kind. replace 2 windows in bathroom, not visible from street, in kind, new lighting, 0.67 max, r-13 walldrywall walls, ceiling, tile floor. no wall changes, | $15,000 |
| May 11, 2009 | Completed final sign-off Jul 2009 | 190 Dorantes Av | replace (e) tub in master bath to whirlpool bath, adjust plumbing to new tub, run a dedicated circuit for tub. tile and drywall finishes.Details
replace (e) tub in master bath to whirlpool bath, adjust plumbing to new tub, run a dedicated circuit for tub. tile and drywall finishes. | $7,000 |
| Nov 13, 2008 | Completed final sign-off Mar 2009 | 362 05th Av | remodel two kitchens, update electrical , floor plan is unattected, install new sink, stove, range hood. bathrooms (2) replace toilet and sink/faucet only. replace 12 windows facing rear & sides with none at front.Details
remodel two kitchens, update electrical , floor plan is unattected, install new sink, stove, range hood. bathrooms (2) replace toilet and sink/faucet only. replace 12 windows facing rear & sides with none at front. | $43,000 |
| Aug 27, 2008 | Completed final sign-off Dec 2008 | 1370 21st Av | work @ unit# 1370 only. bathroom remodel. replace toilet, tub, sink & windows. windows to be vinyl and not facing street. install all new drywall. install new lights & gfi outlet. all fixtures to be in same location. no structural changes. lighting either fluorescent or occupant sensor.Details
work @ unit# 1370 only. bathroom remodel. replace toilet, tub, sink & windows. windows to be vinyl and not facing street. install all new drywall. install new lights & gfi outlet. all fixtures to be in same location. no structural changes. lighting either fluorescent or occupant sensor. | $12,000 |
| Jul 3, 2008 | Completed final sign-off Oct 2008 | 2234 25th Av | remodel upstair 1 bathroom in kind: new drywall, shower stall, all new plumbing fixtures, exhaust fan/fluorescent light, gfi outlet @ 2nd floor.Details
remodel upstair 1 bathroom in kind: new drywall, shower stall, all new plumbing fixtures, exhaust fan/fluorescent light, gfi outlet @ 2nd floor. | $13,000 |
| Feb 13, 2007 | Completed final sign-off Jun 2007 | 678 26th Av | remodel 1 kitchen & 2 bathroom. replace plaster with drywall, new cabinetry. tile flooring. update electrical & old galvanized incoming supply.Details
remodel 1 kitchen & 2 bathroom. replace plaster with drywall, new cabinetry. tile flooring. update electrical & old galvanized incoming supply. | $33,000 |
| Oct 31, 2006 | Completed final sign-off Nov 2006 | 121 Santa Rosa Av | replace 3 bedroom windows & 1 bath window in rear of house. from aluminum to vinyl windows.Details
replace 3 bedroom windows & 1 bath window in rear of house. from aluminum to vinyl windows. | $3,000 |