Back to kitchen remodel contractors
Alan Wong Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Oct 2002 to Feb 2026
- Last 24 months
- 5 permits filed
59 permits since 2000: 50 completed, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 17 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 177 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2026 | Completed final sign-off May 2026 | 232 Kenwood Wy | remodel kitchen 9 ft by 15 ft in 2nd floor, no structural work, replace cabinets, counter top, in kind, appliance, faucet sink and lighting, all interior work. in kind remodelDetails
remodel kitchen 9 ft by 15 ft in 2nd floor, no structural work, replace cabinets, counter top, in kind, appliance, faucet sink and lighting, all interior work. in kind remodel | $33,000 |
| Mar 27, 2025 | Completed final sign-off Oct 2025 | 29 Admiral Av | convert ground floor to living, with one bedroom, mini kitchen with 2 burners only and one bathroom. total of 583 sq ftDetails
convert ground floor to living, with one bedroom, mini kitchen with 2 burners only and one bathroom. total of 583 sq ft | $40,000 |
| Aug 15, 2024 | Completed final sign-off Apr 2025 | 124 Whittier St | 2nd fl remodel - new bathroom. kitchen remodel to remove wall between kitchen and dining room. new kitchen cabinetsDetails
2nd fl remodel - new bathroom. kitchen remodel to remove wall between kitchen and dining room. new kitchen cabinets | $40,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2024 | 364 16th Av | remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylightsDetails
remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylights | $30,000 |
| Feb 2, 2023 | Completed final sign-off Mar 2023 | 623 Geneva Av | remodel 1 kitchen 160 sqft. no wall changes and upgrade subpanel.Details
remodel 1 kitchen 160 sqft. no wall changes and upgrade subpanel. | $20,000 |
| Sep 27, 2021 | Completed final sign-off Jan 2022 | 2350 45th Av | remodel one 100 sf kitchen, one 40 sf bath. upgrade upstair electrical add sub panel. no wall changes. h.e. lighting and controlled per cec 150.0(k)Details
remodel one 100 sf kitchen, one 40 sf bath. upgrade upstair electrical add sub panel. no wall changes. h.e. lighting and controlled per cec 150.0(k) | $35,000 |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 1370 16th Av | unit 1: remodel one kitchen 110sf, one bathroom 40sf. h.e. lighting & controlled per cec 150.0(k)Details
unit 1: remodel one kitchen 110sf, one bathroom 40sf. h.e. lighting & controlled per cec 150.0(k) | $25,000 |
| Sep 8, 2021 | Completed final sign-off Oct 2021 | 402 08th Av | replace kitchen cabinets, counter tops and floor at 10 ft by 12 ft kitchen in unit #307Details
replace kitchen cabinets, counter tops and floor at 10 ft by 12 ft kitchen in unit #307 | $18,000 |
| Apr 20, 2021 | Completed final sign-off Apr 2022 | 693 02nd Av | interior remodel at 693 2nd ave: 1st floor remodel kitchen, convert living room to 2 bedrooms, add in new bath at kitchen area. 695 2nd ave 2nd floor: adding walk in closet and bathroom in master room.Details
interior remodel at 693 2nd ave: 1st floor remodel kitchen, convert living room to 2 bedrooms, add in new bath at kitchen area. 695 2nd ave 2nd floor: adding walk in closet and bathroom in master room. | $60,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 29 Admiral Av | replace cabinets and counter top in 8 ft by 12 ft kitchen. remodel 2nd fl 8 ft by 6 feet bathDetails
replace cabinets and counter top in 8 ft by 12 ft kitchen. remodel 2nd fl 8 ft by 6 feet bath | $21,000 |
| Feb 13, 2019 | Completed final sign-off Aug 2021 | 1967 22nd Av | 2nd flr:expand back to relocate kitchen,living,dining spaces w/ (n) deck over space below.(n)spiral stair from deck to grade. 1st flr:expand back & convert (e) space to living space. create adu unit w/ (n) kitchen, 2 dedrooms,2 baths,living & dining spaces per ord#95-17.new laundry.Details
2nd flr:expand back to relocate kitchen,living,dining spaces w/ (n) deck over space below.(n)spiral stair from deck to grade. 1st flr:expand back & convert (e) space to living space. create adu unit w/ (n) kitchen, 2 dedrooms,2 baths,living & dining spaces per ord#95-17.new laundry. | $360,000 |
| Nov 9, 2018 | Completed final sign-off Aug 2019 | 2134 33rd Av | add 2 master suite and mud room at ground floor. remodel extg kitchen, relocate extg bath and interior stair. add a bath and half bath with remove lightwell at 2nd floor.Details
add 2 master suite and mud room at ground floor. remodel extg kitchen, relocate extg bath and interior stair. add a bath and half bath with remove lightwell at 2nd floor. | $100,000 |
| Nov 23, 2016 | Completed final sign-off Dec 2017 | 811 31st Av | kitchen remodel: change acbinte, stove, dishwasher install islandDetails
kitchen remodel: change acbinte, stove, dishwasher install island | $15,000 |
| Apr 22, 2016 | Completed final sign-off Nov 2016 | 6947 California St | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $20,000 |
| Feb 16, 2016 | Completed final sign-off Aug 2016 | 567 Anderson St | renovate kitchen, new cabinets, & new tile finishes.Details
renovate kitchen, new cabinets, & new tile finishes. | $1,000 |
| Jun 3, 2014 | Completed final sign-off Nov 2014 | 819 31st Av | remodel kitchen 8x10Details
remodel kitchen 8x10 | $12,000 |
| Jun 24, 2013 | Completed final sign-off Mar 2014 | 99 Saint Germain Av | remodel 3 bathrooms and kitchenDetails
remodel 3 bathrooms and kitchen | $50,000 |
| Oct 10, 2012 | Expired or cancelled expired Oct 2015 | 27 Graystone Tr | apartment alteration. enclose rear interior entry, move entry door, move kitchen, add bathroom, move bedroom into crawlspace, create office in extg kitchen/rear interior entry.Details
apartment alteration. enclose rear interior entry, move entry door, move kitchen, add bathroom, move bedroom into crawlspace, create office in extg kitchen/rear interior entry. | $22,000 |
| Sep 18, 2012 | Never finaled issued Sep 2012, no final | 75 Shore View Av | kitchen remodel , replace cabinets countertop appliances and lighting , no structual workDetails
kitchen remodel , replace cabinets countertop appliances and lighting , no structual work | $15,000 |
| Oct 13, 2011 | Completed final sign-off Mar 2012 | 2632 Cabrillo St | interior remodeling: add (n) playroom & bath at ground floor. relocate kitchen & bedroom, add study room & (n) bath at 2nd. floor as per plan.Details
interior remodeling: add (n) playroom & bath at ground floor. relocate kitchen & bedroom, add study room & (n) bath at 2nd. floor as per plan. | $45,000 |