Back to bathroom remodel contractors
Alan Wong Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Oct 2002 to Feb 2026
- Last 24 months
- 5 permits filed
59 permits since 2000: 50 completed, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 28 completed, 1 never finaled, 2 expired or cancelled. Typically 2 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2025 | Completed final sign-off Aug 2025 | 1417 17th Av | remodel (e) bathroom 8ft x 5ft in kind. replace (e) shower pan in kind. add a electrical panel upgrade bedrooms outlets and wiring. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating and separation.Details
remodel (e) bathroom 8ft x 5ft in kind. replace (e) shower pan in kind. add a electrical panel upgrade bedrooms outlets and wiring. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating and separation. | $30,000 |
| Jun 5, 2025 | Completed final sign-off Jul 2025 | 2155 26th Av | remodel existing 5ft x 5ft bathroom install shower per 1st floor.Details
remodel existing 5ft x 5ft bathroom install shower per 1st floor. | $20,000 |
| Mar 27, 2025 | Completed final sign-off Oct 2025 | 29 Admiral Av | convert ground floor to living, with one bedroom, mini kitchen with 2 burners only and one bathroom. total of 583 sq ftDetails
convert ground floor to living, with one bedroom, mini kitchen with 2 burners only and one bathroom. total of 583 sq ft | $40,000 |
| Jan 16, 2025 | Completed final sign-off Jul 2026 | 1971 22nd Av | add a family room, a bedroom with a walk in closer, a full bathroom and a storage room at the garage level. replace furnace with heat pump type. replace water heaterDetails
add a family room, a bedroom with a walk in closer, a full bathroom and a storage room at the garage level. replace furnace with heat pump type. replace water heater | $80,000 |
| Aug 15, 2024 | Completed final sign-off Apr 2025 | 124 Whittier St | 2nd fl remodel - new bathroom. kitchen remodel to remove wall between kitchen and dining room. new kitchen cabinetsDetails
2nd fl remodel - new bathroom. kitchen remodel to remove wall between kitchen and dining room. new kitchen cabinets | $40,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2024 | 364 16th Av | remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylightsDetails
remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylights | $30,000 |
| Sep 27, 2021 | Completed final sign-off Jan 2022 | 2350 45th Av | remodel one 100 sf kitchen, one 40 sf bath. upgrade upstair electrical add sub panel. no wall changes. h.e. lighting and controlled per cec 150.0(k)Details
remodel one 100 sf kitchen, one 40 sf bath. upgrade upstair electrical add sub panel. no wall changes. h.e. lighting and controlled per cec 150.0(k) | $35,000 |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 1370 16th Av | unit 1: remodel one kitchen 110sf, one bathroom 40sf. h.e. lighting & controlled per cec 150.0(k)Details
unit 1: remodel one kitchen 110sf, one bathroom 40sf. h.e. lighting & controlled per cec 150.0(k) | $25,000 |
| Apr 20, 2021 | Completed final sign-off Apr 2022 | 693 02nd Av | interior remodel at 693 2nd ave: 1st floor remodel kitchen, convert living room to 2 bedrooms, add in new bath at kitchen area. 695 2nd ave 2nd floor: adding walk in closet and bathroom in master room.Details
interior remodel at 693 2nd ave: 1st floor remodel kitchen, convert living room to 2 bedrooms, add in new bath at kitchen area. 695 2nd ave 2nd floor: adding walk in closet and bathroom in master room. | $60,000 |
| Feb 1, 2021 | Completed final sign-off Feb 2023 | 35 Palos Pl | vert add above. new add to provide 2br, full bath, stairs to access the add from the hallway. replace asphalt shingle roofing material. stucco ext fin on n and w elev, patch and repair stucco. ext to be painted. remove stone veneer base on fr elev and replace w/ new stucco base.Details
vert add above. new add to provide 2br, full bath, stairs to access the add from the hallway. replace asphalt shingle roofing material. stucco ext fin on n and w elev, patch and repair stucco. ext to be painted. remove stone veneer base on fr elev and replace w/ new stucco base. | $105,000 |
| Sep 25, 2019 | Completed final sign-off Mar 2020 | 2691 35th Av | to add an exercise room, a guest bedroom, and a full bath in 1st fl.Details
to add an exercise room, a guest bedroom, and a full bath in 1st fl. | $50,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 29 Admiral Av | replace cabinets and counter top in 8 ft by 12 ft kitchen. remodel 2nd fl 8 ft by 6 feet bathDetails
replace cabinets and counter top in 8 ft by 12 ft kitchen. remodel 2nd fl 8 ft by 6 feet bath | $21,000 |
| Apr 8, 2019 | Completed final sign-off Oct 2019 | 29 Admiral Av | add new bathroom at 2nd floor and relocate one door.Details
add new bathroom at 2nd floor and relocate one door. | $5,000 |
| Mar 13, 2019 | Completed final sign-off Dec 2021 | 1921 Geneva Av | add adu unit per ord# 95-17 at ground flr incl 1 bedrooms & 2 bathrooms, 450 sq ft. comply w/ n.o.v 2018010117 enf.Details
add adu unit per ord# 95-17 at ground flr incl 1 bedrooms & 2 bathrooms, 450 sq ft. comply w/ n.o.v 2018010117 enf. | $30,000 |
| Feb 13, 2019 | Completed final sign-off Aug 2021 | 1967 22nd Av | 2nd flr:expand back to relocate kitchen,living,dining spaces w/ (n) deck over space below.(n)spiral stair from deck to grade. 1st flr:expand back & convert (e) space to living space. create adu unit w/ (n) kitchen, 2 dedrooms,2 baths,living & dining spaces per ord#95-17.new laundry.Details
2nd flr:expand back to relocate kitchen,living,dining spaces w/ (n) deck over space below.(n)spiral stair from deck to grade. 1st flr:expand back & convert (e) space to living space. create adu unit w/ (n) kitchen, 2 dedrooms,2 baths,living & dining spaces per ord#95-17.new laundry. | $360,000 |
| Nov 9, 2018 | Completed final sign-off Aug 2019 | 2134 33rd Av | add 2 master suite and mud room at ground floor. remodel extg kitchen, relocate extg bath and interior stair. add a bath and half bath with remove lightwell at 2nd floor.Details
add 2 master suite and mud room at ground floor. remodel extg kitchen, relocate extg bath and interior stair. add a bath and half bath with remove lightwell at 2nd floor. | $100,000 |
| Jul 17, 2018 | Expired or cancelled cancelled Oct 2018 | 230 Twin Peaks Bl | bathroom remodel in second floorDetails
bathroom remodel in second floor | $9,000 |
| Apr 3, 2017 | Completed final sign-off Jul 2017 | 710 Rivera St | remodel garage floor bathroom.Details
remodel garage floor bathroom. | $12,000 |
| Apr 22, 2016 | Completed final sign-off Nov 2016 | 6947 California St | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $20,000 |
| Apr 15, 2016 | Completed final sign-off Aug 2016 | 567 Anderson St | remodel 1st flr bedroom, bath and garage. remodel (e) living and bedroom space on 2nd flr. new stir from 1st to 2nd flr. new windows and doors on 1st and 2nd flr. plumbing & electrical work - under sep permit. add w/d in garageDetails
remodel 1st flr bedroom, bath and garage. remodel (e) living and bedroom space on 2nd flr. new stir from 1st to 2nd flr. new windows and doors on 1st and 2nd flr. plumbing & electrical work - under sep permit. add w/d in garage | $125,000 |
| Jun 30, 2014 | Completed final sign-off Nov 2014 | 819 31st Av | comply with nov #201481211 dated june 23, 2014. demolish illegal wall at side of lightwell. revert bact to original condition. add (n) half bath, remodel two full bath at 2nd flr and add full bath at penthouse level.Details
comply with nov #201481211 dated june 23, 2014. demolish illegal wall at side of lightwell. revert bact to original condition. add (n) half bath, remodel two full bath at 2nd flr and add full bath at penthouse level. | $5,000 |
| Apr 24, 2014 | Completed final sign-off Jun 2014 | 15 Van Buren St | remodel bathroom, replace lights, faucets, new tile and paint. 5 ft by 8 ft, no walls to be removedDetails
remodel bathroom, replace lights, faucets, new tile and paint. 5 ft by 8 ft, no walls to be removed | $8,000 |
| Jun 24, 2013 | Completed final sign-off Mar 2014 | 99 Saint Germain Av | remodel 3 bathrooms and kitchenDetails
remodel 3 bathrooms and kitchen | $50,000 |
| Mar 5, 2013 | Completed final sign-off Jul 2013 | 2630 31st Av | remodel upstair bathroom 8x8 lighting must comply with cec 150 kDetails
remodel upstair bathroom 8x8 lighting must comply with cec 150 k | $9,500 |
| Oct 10, 2012 | Expired or cancelled expired Oct 2015 | 27 Graystone Tr | apartment alteration. enclose rear interior entry, move entry door, move kitchen, add bathroom, move bedroom into crawlspace, create office in extg kitchen/rear interior entry.Details
apartment alteration. enclose rear interior entry, move entry door, move kitchen, add bathroom, move bedroom into crawlspace, create office in extg kitchen/rear interior entry. | $22,000 |
| Oct 1, 2012 | Completed final sign-off Jan 2013 | 2427 35th Av | develop habitable rooms on ground floor including one bathroom, install new furnace and water heater in garage per plans.Details
develop habitable rooms on ground floor including one bathroom, install new furnace and water heater in garage per plans. | $38,000 |
| Oct 13, 2011 | Completed final sign-off Mar 2012 | 2632 Cabrillo St | interior remodeling: add (n) playroom & bath at ground floor. relocate kitchen & bedroom, add study room & (n) bath at 2nd. floor as per plan.Details
interior remodeling: add (n) playroom & bath at ground floor. relocate kitchen & bedroom, add study room & (n) bath at 2nd. floor as per plan. | $45,000 |
| Dec 2, 2010 | Completed final sign-off Jan 2011 | 421 Congo St | legalize bathroom at gr floorDetails
legalize bathroom at gr floor | $5,000 |
| Apr 27, 2010 | Completed final sign-off Jun 2010 | 629 Grand View Av | remodel (e) 1st bathroom with shower pan, replace fixtures, tile, exhaust fan, provide exhaust fan to exteriorDetails
remodel (e) 1st bathroom with shower pan, replace fixtures, tile, exhaust fan, provide exhaust fan to exterior | $13,041 |
| Nov 25, 2008 | Completed final sign-off Mar 2009 | 2195 12th Av | retile floors & walls. replace light fixture, replace wall. paint walls, replace toilet, vanity & mirror (bathroom remodel).Details
retile floors & walls. replace light fixture, replace wall. paint walls, replace toilet, vanity & mirror (bathroom remodel). | $8,300 |
| Feb 26, 2007 | Completed final sign-off Sep 2007 | 608 Laguna Honda Bl | add family room, workshop, and full bath at groundfloor. reinforce portion of foundation.Details
add family room, workshop, and full bath at groundfloor. reinforce portion of foundation. | $30,000 |