Aidan Mc Cracken Const Inc.
- Based in
- Pacifica
- On San Francisco permits
- Mar 2001 to Jan 2020
- Last 24 months
- 0 permits filed
95 permits since 2000: 84 completed, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 10 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 21 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2018 | Completed final sign-off Dec 2020 | 716 Cole St | remove (e) rear exterior stair serving (2) flrs. replace w/ (n) stairs serving (3) flrs. add rear decks on (3) levels. raise roof on top 4th flr rear bedroom to increase bedroom area within bldg footprint.Details
remove (e) rear exterior stair serving (2) flrs. replace w/ (n) stairs serving (3) flrs. add rear decks on (3) levels. raise roof on top 4th flr rear bedroom to increase bedroom area within bldg footprint. | $97,200 |
| Jul 8, 2016 | Completed final sign-off Sep 2016 | 3737 23rd St | rot repair lightwell stairs. less than 50%Details
rot repair lightwell stairs. less than 50% | $8,000 |
| Feb 11, 2016 | Completed final sign-off Mar 2016 | 1944 Leavenworth St | rear stairs repair less than 50% per diverse inspection service inc report #161616t. repair in-kind, same footprint.Details
rear stairs repair less than 50% per diverse inspection service inc report #161616t. repair in-kind, same footprint. | $12,000 |
| Jun 26, 2015 | Completed final sign-off Jul 2015 | 708 Masonic Av | repair front stairs less than 50%. repair side stairs less than 50%Details
repair front stairs less than 50%. repair side stairs less than 50% | $10,000 |
| Apr 8, 2015 | Completed final sign-off Apr 2015 | 1101 Lake St | stair repair at side of building less than 50%.Details
stair repair at side of building less than 50%. | $3,000 |
| Jan 12, 2012 | Completed final sign-off Feb 2012 | 1265 Union St | repair rear stairs repair in kind, less than 50%Details
repair rear stairs repair in kind, less than 50% | $9,000 |
| Feb 24, 2011 | Completed final sign-off Mar 2011 | 1248 Filbert St | in-kind repair wood stairs in breezeway, approx 25%Details
in-kind repair wood stairs in breezeway, approx 25% | $4,000 |
| May 4, 2009 | Completed final sign-off Jul 2009 | 4449 23rd St | remodel eixsting upstairs bathroom. (repair rot at entry stairs) less than 50%. no change to partition or windows.Details
remodel eixsting upstairs bathroom. (repair rot at entry stairs) less than 50%. no change to partition or windows. | $18,000 |
| Aug 15, 2006 | Expired or cancelled expired Mar 2007 | 2614 Diamond St | entry stairs, repair rot at treads + risers. total 17 steps, work less than 50% of stair. replace in kind.Details
entry stairs, repair rot at treads + risers. total 17 steps, work less than 50% of stair. replace in kind. | $5,000 |
| Dec 8, 2004 | Completed final sign-off Jan 2005 | 362 Waller St | patch dry wall at garage ceiling, add code handrail to rear stairs,Details
patch dry wall at garage ceiling, add code handrail to rear stairs, | $1,800 |
| Sep 10, 2002 | Completed final sign-off Oct 2002 | 628 30th St | repair entry stairs, replace treads and risers to original condition.Details
repair entry stairs, replace treads and risers to original condition. | $3,300 |