Back to bathroom remodel contractors
Aidan Mc Cracken Const Inc.
- Based in
- Pacifica
- On San Francisco permits
- Mar 2001 to Jan 2020
- Last 24 months
- 0 permits filed
95 permits since 2000: 84 completed, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 16 completed, 2 expired or cancelled. Typically 2 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2014 | Completed final sign-off May 2015 | 1424 Ulloa St | revision to app#201404304597. remove remaining finishes. remodel kitchen and bath. kitchen lighting-min 50% total wattage shall be high efficency. bathroom lighting: high efficacy unless controlled by manual occupancy sensor.Details
revision to app#201404304597. remove remaining finishes. remodel kitchen and bath. kitchen lighting-min 50% total wattage shall be high efficency. bathroom lighting: high efficacy unless controlled by manual occupancy sensor. | $75,000 |
| Jan 24, 2014 | Completed final sign-off Jul 2014 | 3814 Cesar Chavez St | kitchen and bathroom remodel at both units. construction of new deck at rear less than 30" above grade. post removal & voluntary seismic strengthening at garage.Details
kitchen and bathroom remodel at both units. construction of new deck at rear less than 30" above grade. post removal & voluntary seismic strengthening at garage. | $100,000 |
| May 14, 2013 | Completed final sign-off Aug 2013 | 4070 17th St | front bldg, top unit - kitchen remodel: new cabs, plumbing, electric & bathroom remodel - new tub,toilet, tile, plumbingDetails
front bldg, top unit - kitchen remodel: new cabs, plumbing, electric & bathroom remodel - new tub,toilet, tile, plumbing | $25,000 |
| Jan 10, 2013 | Expired or cancelled expired Jun 2016 | 3876 22nd St | remodel bathroom. update plumbing and electricalDetails
remodel bathroom. update plumbing and electrical | $12,000 |
| Jul 25, 2012 | Completed final sign-off Feb 2013 | 337 Clipper St | add bathroom to unit 337 at existing laundry room, enlarge opening at kitchen to living room. add new footings at garage to support new loadingDetails
add bathroom to unit 337 at existing laundry room, enlarge opening at kitchen to living room. add new footings at garage to support new loading | $15,000 |
| Feb 16, 2012 | Completed final sign-off Feb 2014 | 2425 Ocean Av | one story addition on west side of building. converting garage to office space, and adding ada bathroom.Details
one story addition on west side of building. converting garage to office space, and adding ada bathroom. | $95,000 |
| Jan 13, 2012 | Completed final sign-off Jun 2012 | 236 Elsie St | legalize of exiting rooms at gr level. bath and guest room, closet. convert existing storage to study. add shear wall and foundation at garage/laundry. reinstall window at studyDetails
legalize of exiting rooms at gr level. bath and guest room, closet. convert existing storage to study. add shear wall and foundation at garage/laundry. reinstall window at study | $20,000 |
| Jul 8, 2011 | Completed final sign-off Dec 2011 | 1395 Sanchez St | enlarge existing 1/2 bath to full bath at lower level room. add closet in same area.Details
enlarge existing 1/2 bath to full bath at lower level room. add closet in same area. | $15,000 |
| Dec 8, 2010 | Completed final sign-off Apr 2011 | 1395 Sanchez St | remodel exist kitchen and main bath, convert existing "nook" into master bath, retrofit lower level post/beam connections, add anchor bolts to fdn, relocate furnace in to crawlspaceDetails
remodel exist kitchen and main bath, convert existing "nook" into master bath, retrofit lower level post/beam connections, add anchor bolts to fdn, relocate furnace in to crawlspace | $5,000 |
| Oct 8, 2010 | Completed final sign-off Feb 2011 | 440 28th St | remodel kitchen & bath at main level (2nd floor), alter rear storage at main level, add new bath at upper (bedroom ) level. minor "cosmetic" upgrades to (e) ground floor bath.Details
remodel kitchen & bath at main level (2nd floor), alter rear storage at main level, add new bath at upper (bedroom ) level. minor "cosmetic" upgrades to (e) ground floor bath. | $35,500 |
| Aug 5, 2010 | Completed final sign-off Dec 2010 | 3912 23rd St | bathroom remodel; in-kind, non-structural. provide exhaust fan & high efficiency light on "manual on" occupancy sensor.Details
bathroom remodel; in-kind, non-structural. provide exhaust fan & high efficiency light on "manual on" occupancy sensor. | $8,000 |
| Jun 23, 2010 | Completed final sign-off Nov 2010 | 3744 22nd St | remodel e kitchen, enlarge opening between kitchen and dining rm. remodel e bath with addition of toilet. remodel e wc with addition of lavatory. replace w windows and 1 exterior door. add landing on e deckDetails
remodel e kitchen, enlarge opening between kitchen and dining rm. remodel e bath with addition of toilet. remodel e wc with addition of lavatory. replace w windows and 1 exterior door. add landing on e deck | $60,000 |
| Jun 26, 2009 | Completed final sign-off Aug 2009 | 3434 Broderick St | add toilet in main bathroom, add sink in powder room, add exhaust fansDetails
add toilet in main bathroom, add sink in powder room, add exhaust fans | $10,000 |
| May 4, 2009 | Completed final sign-off Jul 2009 | 4449 23rd St | remodel eixsting upstairs bathroom. (repair rot at entry stairs) less than 50%. no change to partition or windows.Details
remodel eixsting upstairs bathroom. (repair rot at entry stairs) less than 50%. no change to partition or windows. | $18,000 |
| Apr 22, 2009 | Completed final sign-off Apr 2010 | 33 Rossmoor Dr | horizontal addition on 2nd. floor of (e) single family home. site permit for (n) bedrooms/bath/study over (e) garage.Details
horizontal addition on 2nd. floor of (e) single family home. site permit for (n) bedrooms/bath/study over (e) garage. | $350,000 |
| Oct 25, 2007 | Completed final sign-off Jul 2008 | 1926 Pine St | r-3 bath and bedroom remodelDetails
r-3 bath and bedroom remodel | $100,000 |
| Sep 12, 2006 | Expired or cancelled expired Sep 2007 | 3749 22nd St | bathroom addition, convert part of 3rd floor bedroom into bath and remodel other bath in kind. no exterior workDetails
bathroom addition, convert part of 3rd floor bedroom into bath and remodel other bath in kind. no exterior work | $22,000 |
| Oct 18, 2002 | Completed final sign-off Feb 2003 | 746 Lyon St | add new bathroom 2nd occupied floor, move (e) attic knee walls, insulate roof raftersDetails
add new bathroom 2nd occupied floor, move (e) attic knee walls, insulate roof rafters | $60,000 |