Back to bathroom remodel contractors
Aero Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Sep 2017
- Last 24 months
- 0 permits filed
136 permits since 2000: 83 completed, 30 never finaled, 23 expired or cancelled.
Of the 30 never-finaled permits, 1 is 5 to 10 years old, 29 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
42 bathroom remodel permits: 25 completed, 9 never finaled, 8 expired or cancelled. Typically 25 days from filing to permit and 449 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2017 | Completed final sign-off Nov 2018 | 240 26th Av | 2/f: add one laundry room and one bathroom per plans in (e) closets. kitchen alteration. relocate fixtures. relocate furnace.Details
2/f: add one laundry room and one bathroom per plans in (e) closets. kitchen alteration. relocate fixtures. relocate furnace. | $25,000 |
| Apr 25, 2017 | Completed final sign-off Apr 2018 | 320 18th Av | add one new master bathroom and one closet within extg sunroom on 3rd floor per plan.Details
add one new master bathroom and one closet within extg sunroom on 3rd floor per plan. | $20,000 |
| Jan 10, 2017 | Completed final sign-off Aug 2017 | 887 45th Av | renovation of lower unit of existing duplex at kitchen area. install beam for eremoving interior wall. add laundy closet at existing bathroom per planDetails
renovation of lower unit of existing duplex at kitchen area. install beam for eremoving interior wall. add laundy closet at existing bathroom per plan | $12,000 |
| Aug 18, 2016 | Completed final sign-off Sep 2019 | 207 06th Av | 1)add two bedrrroms, two bathrooms and one family room on attic floor per plan. 2) add three new skylight and two dormer at attic floor.Details
1)add two bedrrroms, two bathrooms and one family room on attic floor per plan. 2) add three new skylight and two dormer at attic floor. | $50,000 |
| Jun 30, 2016 | Completed final sign-off Aug 2017 | 61 Saturn St | interior kitchen renovation. new appliances, cabinets, and countertop. renovations of (e) bathroom. plumbing, electrical work as needed. see structural dwgs for structural scope. no exterior work. all work within (e) building envelope.Details
interior kitchen renovation. new appliances, cabinets, and countertop. renovations of (e) bathroom. plumbing, electrical work as needed. see structural dwgs for structural scope. no exterior work. all work within (e) building envelope. | $60,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2019 | 207 06th Av | add 1 new laundry room, one media room, one entertainment and one half bathroom on 1st floor per plan.Details
add 1 new laundry room, one media room, one entertainment and one half bathroom on 1st floor per plan. | $40,000 |
| Jun 9, 2016 | Expired or cancelled revoked May 2018 | 437 Ellsworth St | 1)kitchen remodel on second floor. 2)rearrange interior layout on second floor. 3)add one bathroom, one bedroom, office, storage on basement per plan. 4)add interior stair between basement and main floor per plan. to comply with complaint #201604011.Details
1)kitchen remodel on second floor. 2)rearrange interior layout on second floor. 3)add one bathroom, one bedroom, office, storage on basement per plan. 4)add interior stair between basement and main floor per plan. to comply with complaint #201604011. | $50,000 |
| May 31, 2016 | Expired or cancelled expired Mar 2018 | 3819 18th St | apt 3: kitchen & bathroom remodeling: kitchen: replace cabinets, countertops, install kitchen tiles. run new electrical for whole unit. replace vanity, sink, faucet, tub, fauct. lighting per cec 150k.Details
apt 3: kitchen & bathroom remodeling: kitchen: replace cabinets, countertops, install kitchen tiles. run new electrical for whole unit. replace vanity, sink, faucet, tub, fauct. lighting per cec 150k. | $12,000 |
| May 9, 2016 | Expired or cancelled expired Mar 2018 | 3819 18th St | apt 2: kitchen: replace cabinets, counter tops, install kitchen tiles. run new electrical for whole unit. bathroom: replce vanity, sink, faucets, tubf faucet.Details
apt 2: kitchen: replace cabinets, counter tops, install kitchen tiles. run new electrical for whole unit. bathroom: replce vanity, sink, faucets, tubf faucet. | $9,000 |
| May 5, 2016 | Completed final sign-off Jan 2017 | 156 Valley St | remodel kitchen in each unit. remodel bathrooms new electrical serviceDetails
remodel kitchen in each unit. remodel bathrooms new electrical service | $37,500 |
| Apr 26, 2016 | Never finaled issued Apr 2016, no final | 1010 Bush St | remodel replace tile, toilets, faucets in kind for existing baths. run new elec for existing bathsDetails
remodel replace tile, toilets, faucets in kind for existing baths. run new elec for existing baths | $10,000 |
| Apr 8, 2016 | Completed final sign-off Jun 2017 | 547 Campbell Av | comply with complaint #200853572 to legalized, as built rooms (media room, bathroom, storage) on 1/f per plan.Details
comply with complaint #200853572 to legalized, as built rooms (media room, bathroom, storage) on 1/f per plan. | $8,000 |
| Apr 7, 2016 | Expired or cancelled suspend Dec 2017 | 120 Brewster St | soft demo on 1st flr & 2nd flr, salvage all wood trim doors. no drywall or plaster removal. fixtures at bathrooms and doors only. interior work only, no exterior work, no change of use, no building expansion.Details
soft demo on 1st flr & 2nd flr, salvage all wood trim doors. no drywall or plaster removal. fixtures at bathrooms and doors only. interior work only, no exterior work, no change of use, no building expansion. | $5,000 |
| Feb 12, 2016 | Expired or cancelled cancelled Jan 2026 | 747 Natoma St | repair kitchen, move gas stove to new position, move sink, dishwasher to island, replace wood burning fireplace with gas fireplace, turn stairs 90 degress, replace bathroom fixtures. n/a ordinance #155-13Details
repair kitchen, move gas stove to new position, move sink, dishwasher to island, replace wood burning fireplace with gas fireplace, turn stairs 90 degress, replace bathroom fixtures. n/a ordinance #155-13 | $50,000 |
| Jan 27, 2016 | Completed final sign-off Feb 2016 | 250 King St | apt. #1516: 2 baths, 1 kitchen remodel. no change in walls, opening layout. replace kitchen countertops and kitchen cabinets, sink, no kitchen lighting change. replace bath vanity, tub, lav. either high efficacy lighting or controlled by manual sensor, with main bath light high eff.Details
apt. #1516: 2 baths, 1 kitchen remodel. no change in walls, opening layout. replace kitchen countertops and kitchen cabinets, sink, no kitchen lighting change. replace bath vanity, tub, lav. either high efficacy lighting or controlled by manual sensor, with main bath light high eff. | $7,000 |
| Jan 21, 2016 | Never finaled issued Jun 2016, no final | 1921 Moraga St | legalize office, add playroom, full bath, laundry room, hallway 1st fl. enclose space under 2nd fl bedroom. construct rear deck off 2nd flDetails
legalize office, add playroom, full bath, laundry room, hallway 1st fl. enclose space under 2nd fl bedroom. construct rear deck off 2nd fl | $70,000 |
| Dec 30, 2015 | Completed final sign-off Apr 2018 | 900 Ingerson Av | 1st floor - remodel (e) bath, add light fixtures at storage, add 1 powder room; 2nd floor - reconfigure interior layout, relocate 2 (e) full baths, add deck at rear, kitchen remodel; 3rd floor - turn (e) storage to 2 bedrooms & 1 full bath, add dormer on leftDetails
1st floor - remodel (e) bath, add light fixtures at storage, add 1 powder room; 2nd floor - reconfigure interior layout, relocate 2 (e) full baths, add deck at rear, kitchen remodel; 3rd floor - turn (e) storage to 2 bedrooms & 1 full bath, add dormer on left | $60,000 |
| Dec 30, 2015 | Completed final sign-off Aug 2018 | 778 34th Av | convert 1st floor to habitable living space. infill south lightwell at 1st & 2nd floor. int. remodel incl. kitchen & 5 baths. replace all extg window, add new window. include fire rated prop line windw & nw skylights. new retaining wall and landscaping in rear yard. struct/elec/plmg as req'd.Details
convert 1st floor to habitable living space. infill south lightwell at 1st & 2nd floor. int. remodel incl. kitchen & 5 baths. replace all extg window, add new window. include fire rated prop line windw & nw skylights. new retaining wall and landscaping in rear yard. struct/elec/plmg as req'd. | $270,000 |
| Nov 24, 2015 | Completed final sign-off Apr 2017 | 248 Mallorca Wy | proposed new entertainment ro0om, 1 nedroo, 1 bath, 1 media room, 1 laundry room, 1 powder room, closet 1st fl. relocate 2 heating furnace and 2 water heater to garage on 1st fl per plan. 2 new skylights on 3rd flDetails
proposed new entertainment ro0om, 1 nedroo, 1 bath, 1 media room, 1 laundry room, 1 powder room, closet 1st fl. relocate 2 heating furnace and 2 water heater to garage on 1st fl per plan. 2 new skylights on 3rd fl | $20,000 |
| Nov 5, 2015 | Completed final sign-off Jul 2017 | 1230 Pacific Av | retail space @ 1st floor basement to be eliminated & space to be incorporated into (e) residential unit. provide media room @ basement, provide kitchen, dining, & living room @ 1st fl. 2nd fl: convert living room to master bedroom & kitchen into study. provide new master bathroom new deck @ roof.Details
retail space @ 1st floor basement to be eliminated & space to be incorporated into (e) residential unit. provide media room @ basement, provide kitchen, dining, & living room @ 1st fl. 2nd fl: convert living room to master bedroom & kitchen into study. provide new master bathroom new deck @ roof. | $250,000 |
| Oct 21, 2015 | Never finaled issued Dec 2015, no final | 69 Saturn St | remodel of 2 unit residence to include new extg entry for lower unit, new bath and closets,new int. stair skylight and entry closet for upper unit. removal of walls to open up floor plan. associated elec, plmg, & structural workDetails
remodel of 2 unit residence to include new extg entry for lower unit, new bath and closets,new int. stair skylight and entry closet for upper unit. removal of walls to open up floor plan. associated elec, plmg, & structural work | $42,000 |
| Sep 16, 2015 | Never finaled issued Oct 2015, no final | 248 Mallorca Wy | revision to pa#201508103849, kitchen and bathroom remodel on both units per plan. n/a ordinance #155-13Details
revision to pa#201508103849, kitchen and bathroom remodel on both units per plan. n/a ordinance #155-13 | $8,000 |
| Aug 31, 2015 | Completed final sign-off May 2016 | 237 Brookdale Av | install 2 bedrooms, bathroom, and hall way at 1st floor.Details
install 2 bedrooms, bathroom, and hall way at 1st floor. | $38,000 |
| Jun 1, 2015 | Never finaled issued Jun 2015, no final | 196 Urbano Dr | 2nd floor remodel (e) master closet and bath. new skylights at master closet and bath. remdoel (e) bath no. 2, closet and study room. new 3 windows at master bath, bath #2 and master closet. window not visible from street.Details
2nd floor remodel (e) master closet and bath. new skylights at master closet and bath. remdoel (e) bath no. 2, closet and study room. new 3 windows at master bath, bath #2 and master closet. window not visible from street. | $48,000 |
| Oct 21, 2014 | Completed final sign-off Jun 2019 | 4174 26th St | enlarge existing kitchen and enlarge existing deck at second floor. enclose stair from second floor to first floor. create personal office of first floor. lower floor on existing master bedroom and replace existing bath and closet at master bedroom on first floorDetails
enlarge existing kitchen and enlarge existing deck at second floor. enclose stair from second floor to first floor. create personal office of first floor. lower floor on existing master bedroom and replace existing bath and closet at master bedroom on first floor | $124,000 |
| Oct 7, 2014 | Completed final sign-off Jun 2018 | 3550 Noriega St | kitchen remodel on middle floor. e bath remodel on upper level per planDetails
kitchen remodel on middle floor. e bath remodel on upper level per plan | $40,000 |
| May 14, 2014 | Expired or cancelled expired Dec 2018 | 847 29th Av | add one bathroom, family room, laundry room & storage on 1st floor. remodel three bedrooms, two bathrooms, kitchen on 2nd & 3rd floor. replace foundation per plan.Details
add one bathroom, family room, laundry room & storage on 1st floor. remodel three bedrooms, two bathrooms, kitchen on 2nd & 3rd floor. replace foundation per plan. | $178,000 |
| Feb 24, 2014 | Never finaled issued Mar 2014, no final | 6509 California St | one bathroom remodel on 2nd floor per plan.Details
one bathroom remodel on 2nd floor per plan. | $10,000 |
| Feb 24, 2014 | Completed final sign-off Jun 2016 | 411 Vallejo St | 1) extg kitchen and extg powder room remodel on 2nd floor per plan. 2)add new bathroom:enlarge extg bedroom and remodel extg bedroom and 2nd floor per plan. 3) add spiral stair case at rear.Details
1) extg kitchen and extg powder room remodel on 2nd floor per plan. 2)add new bathroom:enlarge extg bedroom and remodel extg bedroom and 2nd floor per plan. 3) add spiral stair case at rear. | $70,000 |
| Feb 21, 2014 | Completed final sign-off Sep 2014 | 717 27th Av | to comply w/nov #201339221 - revision to pa #201310038423: rearrange bathroom on 2nd & 3rd floor per plan. add recessed light on 1st, 2nd & 3rd floor, add deck at rear, add two new skylights & one window on 3rd floor , redirect stair on 1st & 2nd floor.Details
to comply w/nov #201339221 - revision to pa #201310038423: rearrange bathroom on 2nd & 3rd floor per plan. add recessed light on 1st, 2nd & 3rd floor, add deck at rear, add two new skylights & one window on 3rd floor , redirect stair on 1st & 2nd floor. | $5,000 |
| Feb 18, 2014 | Expired or cancelled expired Dec 2024 | 2211 14th Av | 1)add bedroom, bathroom and a family room on 1st floor. 2)interior renovation on 2nd and 3rd floor. 3)kitchen and bathroom remodel.Details
1)add bedroom, bathroom and a family room on 1st floor. 2)interior renovation on 2nd and 3rd floor. 3)kitchen and bathroom remodel. | $45,000 |
| Dec 6, 2013 | Expired or cancelled expired Jul 2018 | 1014 Diamond St | interior remodel on 2nd floor, add two bathrooms, remove kitchen on 2nd floor, add kitchen, dining room & family room on 1st floor per plan. no work on commercial space.Details
interior remodel on 2nd floor, add two bathrooms, remove kitchen on 2nd floor, add kitchen, dining room & family room on 1st floor per plan. no work on commercial space. | $10,000 |
| Oct 3, 2013 | Completed final sign-off Aug 2014 | 717 27th Av | add one bedroom, bath room, laundry room and mud room on 1st floor per plan. add one powder room, remodel kitchen on 2nd floor per plan. add one bathroom and remodel existing bathroom on 3rd floor per plan.Details
add one bedroom, bath room, laundry room and mud room on 1st floor per plan. add one powder room, remodel kitchen on 2nd floor per plan. add one bathroom and remodel existing bathroom on 3rd floor per plan. | $90,000 |
| Oct 3, 2013 | Never finaled issued Oct 2013, no final | 2034 29th Av | bathroom & kitchen remodel on 2nd floor per plans. repair dry rot at front per plansDetails
bathroom & kitchen remodel on 2nd floor per plans. repair dry rot at front per plans | $15,000 |
| Aug 2, 2013 | Never finaled issued Aug 2013, no final | 18 Walter St | bathroom remodel-not moving or adding wallsDetails
bathroom remodel-not moving or adding walls | $8,000 |
| Jul 18, 2013 | Never finaled issued Aug 2013, no final | 88 Forest Side Av | kitchen remodel & relocate powder room on 2nd floor. relocate bathroom on 3rd floor & remodel master bedroomDetails
kitchen remodel & relocate powder room on 2nd floor. relocate bathroom on 3rd floor & remodel master bedroom | $4,000 |
| Jun 7, 2013 | Completed final sign-off Sep 2014 | 806 27th Av | remodel of existing 2nd floor at existing residence: work include kitchen remodel, two new study rooms and two bathrooms. no remodel of garage level, except that as required per code.Details
remodel of existing 2nd floor at existing residence: work include kitchen remodel, two new study rooms and two bathrooms. no remodel of garage level, except that as required per code. | $75,500 |
| Apr 19, 2013 | Completed final sign-off Sep 2014 | 530 19th Av | add storage on 1st floor per plan, add 1 bathroom on 2nd fl, upgrade lighting fixtures at kitchen & living room on 2nd fl.; add closet & skylight on 2nd fl. add 2 bedrooms, 1 powder room at rear of 3rd fl. remodel (e) bathroom on 3rd fl. voluntary strengthening improvement on lowest level,Details
add storage on 1st floor per plan, add 1 bathroom on 2nd fl, upgrade lighting fixtures at kitchen & living room on 2nd fl.; add closet & skylight on 2nd fl. add 2 bedrooms, 1 powder room at rear of 3rd fl. remodel (e) bathroom on 3rd fl. voluntary strengthening improvement on lowest level, | $54,000 |
| Mar 1, 2013 | Completed final sign-off Dec 2013 | 47 Riverton Dr | 1)replace front entrance door in kind. 2)repair dryrot at front. 3)enlarge extg opening at dinning room. 4)remodel 2 bathrooms on 2nd floor. 5 )kitchen remodel per plan.Details
1)replace front entrance door in kind. 2)repair dryrot at front. 3)enlarge extg opening at dinning room. 4)remodel 2 bathrooms on 2nd floor. 5 )kitchen remodel per plan. | $28,000 |
| Sep 25, 2012 | Completed final sign-off Jan 2019 | 156 Landers St | vertical additn consist of (2)(n) bedroom, (1)(n)living space, (1) (n)deck @ 2nd fl, 1st fl consists of (2)(n)bedrms, (2)(n)baths, (1)(n)livng space, (1)(n) kitchen & (1)(n)rear patio w/ (n)foundatn also (n) exterior stairs @ front &rear, (n)windows & doors (n)siding & some (n)elect, plumb & heatingDetails
vertical additn consist of (2)(n) bedroom, (1)(n)living space, (1) (n)deck @ 2nd fl, 1st fl consists of (2)(n)bedrms, (2)(n)baths, (1)(n)livng space, (1)(n) kitchen & (1)(n)rear patio w/ (n)foundatn also (n) exterior stairs @ front &rear, (n)windows & doors (n)siding & some (n)elect, plumb & heating | $212,000 |
| Aug 10, 2012 | Completed final sign-off Mar 2014 | 290 Collingwood St | vertical addition of existing building. 3 bedrooms, 2 bathrooms on 2nd floor. remodel on 1st floor & garage level / basement.Details
vertical addition of existing building. 3 bedrooms, 2 bathrooms on 2nd floor. remodel on 1st floor & garage level / basement. | $180,000 |
| Mar 19, 2012 | Completed final sign-off Mar 2020 | 2816 Clement St | 3rd floor addition & interior remodel. add rear stairs. add bathroom, bedroom & rear deck on ground floor. add master bedroom with bath & walkin closet on 3rd floor. add 3 bedroom & bathroom on 3rd floor.Details
3rd floor addition & interior remodel. add rear stairs. add bathroom, bedroom & rear deck on ground floor. add master bedroom with bath & walkin closet on 3rd floor. add 3 bedroom & bathroom on 3rd floor. | $175,000 |