Aero Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Sep 2017
- Last 24 months
- 0 permits filed
136 permits since 2000: 83 completed, 30 never finaled, 23 expired or cancelled.
Of the 30 never-finaled permits, 1 is 5 to 10 years old, 29 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 8 completed, 1 never finaled. Typically 139 days from filing to permit and 1022 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2016 | Never finaled issued Jun 2016, no final | 1921 Moraga St | legalize office, add playroom, full bath, laundry room, hallway 1st fl. enclose space under 2nd fl bedroom. construct rear deck off 2nd flDetails
legalize office, add playroom, full bath, laundry room, hallway 1st fl. enclose space under 2nd fl bedroom. construct rear deck off 2nd fl | $70,000 |
| Dec 30, 2015 | Completed final sign-off Apr 2018 | 900 Ingerson Av | 1st floor - remodel (e) bath, add light fixtures at storage, add 1 powder room; 2nd floor - reconfigure interior layout, relocate 2 (e) full baths, add deck at rear, kitchen remodel; 3rd floor - turn (e) storage to 2 bedrooms & 1 full bath, add dormer on leftDetails
1st floor - remodel (e) bath, add light fixtures at storage, add 1 powder room; 2nd floor - reconfigure interior layout, relocate 2 (e) full baths, add deck at rear, kitchen remodel; 3rd floor - turn (e) storage to 2 bedrooms & 1 full bath, add dormer on left | $60,000 |
| Nov 5, 2015 | Completed final sign-off Jul 2017 | 1230 Pacific Av | retail space @ 1st floor basement to be eliminated & space to be incorporated into (e) residential unit. provide media room @ basement, provide kitchen, dining, & living room @ 1st fl. 2nd fl: convert living room to master bedroom & kitchen into study. provide new master bathroom new deck @ roof.Details
retail space @ 1st floor basement to be eliminated & space to be incorporated into (e) residential unit. provide media room @ basement, provide kitchen, dining, & living room @ 1st fl. 2nd fl: convert living room to master bedroom & kitchen into study. provide new master bathroom new deck @ roof. | $250,000 |
| Oct 21, 2014 | Completed final sign-off Jun 2019 | 4174 26th St | enlarge existing kitchen and enlarge existing deck at second floor. enclose stair from second floor to first floor. create personal office of first floor. lower floor on existing master bedroom and replace existing bath and closet at master bedroom on first floorDetails
enlarge existing kitchen and enlarge existing deck at second floor. enclose stair from second floor to first floor. create personal office of first floor. lower floor on existing master bedroom and replace existing bath and closet at master bedroom on first floor | $124,000 |
| Aug 7, 2014 | Completed final sign-off Sep 2014 | 717 27th Av | revision to 2014-0221-8998. replace in kind. wood clad. east facing windows per plan. relocate stair for deck at rear per planDetails
revision to 2014-0221-8998. replace in kind. wood clad. east facing windows per plan. relocate stair for deck at rear per plan | $5,000 |
| Feb 21, 2014 | Completed final sign-off Sep 2014 | 717 27th Av | to comply w/nov #201339221 - revision to pa #201310038423: rearrange bathroom on 2nd & 3rd floor per plan. add recessed light on 1st, 2nd & 3rd floor, add deck at rear, add two new skylights & one window on 3rd floor , redirect stair on 1st & 2nd floor.Details
to comply w/nov #201339221 - revision to pa #201310038423: rearrange bathroom on 2nd & 3rd floor per plan. add recessed light on 1st, 2nd & 3rd floor, add deck at rear, add two new skylights & one window on 3rd floor , redirect stair on 1st & 2nd floor. | $5,000 |
| Jul 8, 2013 | Completed final sign-off Oct 2017 | 147 San Pablo Av | new legal stair to garage from main living level gutting & remodeling of main (1st flr) remodeling of 2nd flr with front & rear additions. new railing at garage roof/deck.Details
new legal stair to garage from main living level gutting & remodeling of main (1st flr) remodeling of 2nd flr with front & rear additions. new railing at garage roof/deck. | $380,000 |
| Sep 25, 2012 | Completed final sign-off Jan 2019 | 156 Landers St | vertical additn consist of (2)(n) bedroom, (1)(n)living space, (1) (n)deck @ 2nd fl, 1st fl consists of (2)(n)bedrms, (2)(n)baths, (1)(n)livng space, (1)(n) kitchen & (1)(n)rear patio w/ (n)foundatn also (n) exterior stairs @ front &rear, (n)windows & doors (n)siding & some (n)elect, plumb & heatingDetails
vertical additn consist of (2)(n) bedroom, (1)(n)living space, (1) (n)deck @ 2nd fl, 1st fl consists of (2)(n)bedrms, (2)(n)baths, (1)(n)livng space, (1)(n) kitchen & (1)(n)rear patio w/ (n)foundatn also (n) exterior stairs @ front &rear, (n)windows & doors (n)siding & some (n)elect, plumb & heating | $212,000 |
| Mar 19, 2012 | Completed final sign-off Mar 2020 | 2816 Clement St | 3rd floor addition & interior remodel. add rear stairs. add bathroom, bedroom & rear deck on ground floor. add master bedroom with bath & walkin closet on 3rd floor. add 3 bedroom & bathroom on 3rd floor.Details
3rd floor addition & interior remodel. add rear stairs. add bathroom, bedroom & rear deck on ground floor. add master bedroom with bath & walkin closet on 3rd floor. add 3 bedroom & bathroom on 3rd floor. | $175,000 |