Back to kitchen remodel contractors
Ademo Construction
- Based in
- San Jose
- On San Francisco permits
- Jul 2010 to May 2024
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 expired or cancelled. Typically 1 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2019 | Completed final sign-off Nov 2019 | 1882 Filbert St | kitchen remodel- 1882 filbert- new cabinets and flooring. some new appliances, no change to walls and openings layouts. maintain 1 hour separation between units.Details
kitchen remodel- 1882 filbert- new cabinets and flooring. some new appliances, no change to walls and openings layouts. maintain 1 hour separation between units. | $18,000 |
| Apr 2, 2019 | Completed final sign-off Jul 2019 | 1884 Filbert St | unit #1884a: replace extg kitchen cabinets. install new appliances. open up and add light. (not weight bearing)Details
unit #1884a: replace extg kitchen cabinets. install new appliances. open up and add light. (not weight bearing) | $18,000 |
| Jun 4, 2018 | Completed final sign-off Nov 2018 | 140 Mullen Av | remodel (e) kitchen in-kind, replace cabinets, counter top, kitchen sinkDetails
remodel (e) kitchen in-kind, replace cabinets, counter top, kitchen sink | $15,000 |
| Feb 27, 2018 | Expired or cancelled expired Jul 2025 | 730 Euclid Av | 2nd floor: rermodel kitchen. 3rd and 4th floor: remodel baths. total of 2 baths. all fixtures remain at same location. replace tiles, cabinets and fixtures. maher naDetails
2nd floor: rermodel kitchen. 3rd and 4th floor: remodel baths. total of 2 baths. all fixtures remain at same location. replace tiles, cabinets and fixtures. maher na | $25,000 |
| Feb 13, 2018 | Completed final sign-off May 2018 | 1880 Filbert St | remodel 1 kitchen with new cabinets and some new appliances. remove partition wall between kitchen and living room to open up space. replace lino floor in kitchen/laundry. work to be done on units 1880-1880a filbert street.Details
remodel 1 kitchen with new cabinets and some new appliances. remove partition wall between kitchen and living room to open up space. replace lino floor in kitchen/laundry. work to be done on units 1880-1880a filbert street. | $40,000 |
| Aug 25, 2017 | Completed final sign-off Jul 2018 | 230 Santa Clara Av | kitchen and bath remodel & add bay windowDetails
kitchen and bath remodel & add bay window | $80,000 |
| Jun 6, 2017 | Completed final sign-off Sep 2017 | 30 Santa Paula Av | kitchen remodel & new 200 amp service upgrade; demo cabinets & floor finishes, sink, replace w/ new & countertop, ; floor plan to remain the same.Details
kitchen remodel & new 200 amp service upgrade; demo cabinets & floor finishes, sink, replace w/ new & countertop, ; floor plan to remain the same. | $20,000 |