Back to bathroom remodel contractors
Ademo Construction
- Based in
- San Jose
- On San Francisco permits
- Jul 2010 to May 2024
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 3 days from filing to permit and 323 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2024 | Completed final sign-off Sep 2024 | 56 Santa Paula Av | bathroom remodel. replace fixtures, 1 new toilet. remove tub and replace with (n) shower. construct new non bearing wallDetails
bathroom remodel. replace fixtures, 1 new toilet. remove tub and replace with (n) shower. construct new non bearing wall | $45,000 |
| Dec 20, 2019 | Completed final sign-off Dec 2021 | 230 Santa Clara Av | remodel 3 bathrooms, add lighting/recessed in office/sitting room. all on 2nd floor. no first floor work.Details
remodel 3 bathrooms, add lighting/recessed in office/sitting room. all on 2nd floor. no first floor work. | $110,000 |
| Feb 27, 2018 | Expired or cancelled expired Jul 2025 | 730 Euclid Av | 2nd floor: rermodel kitchen. 3rd and 4th floor: remodel baths. total of 2 baths. all fixtures remain at same location. replace tiles, cabinets and fixtures. maher naDetails
2nd floor: rermodel kitchen. 3rd and 4th floor: remodel baths. total of 2 baths. all fixtures remain at same location. replace tiles, cabinets and fixtures. maher na | $25,000 |
| Aug 25, 2017 | Completed final sign-off Jul 2018 | 230 Santa Clara Av | kitchen and bath remodel & add bay windowDetails
kitchen and bath remodel & add bay window | $80,000 |