Actually Design Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2016 to Oct 2026
- Last 24 months
- 36 permits filed
112 permits since 2000: 81 completed, 13 in progress, 11 never finaled, 7 expired or cancelled.
Of the 11 never-finaled permits, 7 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 never finaled. Typically 321 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2021 | Never finaled issued Dec 2021, no final | 566 20th Av | rear extension of 3-story. add unit @ ground fl. reconfigure kitchen, dining & bath @ 2nd fl. roof deck @ rear of 2nd fl. add master suite including bedrm & bathrm, laundry & closets @ 3rd fl. remove wood trim @ front elevation (not original) & patch plaster as needed.Details
rear extension of 3-story. add unit @ ground fl. reconfigure kitchen, dining & bath @ 2nd fl. roof deck @ rear of 2nd fl. add master suite including bedrm & bathrm, laundry & closets @ 3rd fl. remove wood trim @ front elevation (not original) & patch plaster as needed. | $200,000 |