Back to kitchen remodel contractors
Actually Design Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2016 to Oct 2026
- Last 24 months
- 36 permits filed
112 permits since 2000: 81 completed, 13 in progress, 11 never finaled, 7 expired or cancelled.
Of the 11 never-finaled permits, 7 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
27 kitchen remodel permits: 20 completed, 4 in progress, 2 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1723 35th Av | g/f: add 1 adu, 805sf adu 1-bed. remodel 2/f including 2 beds, 1 bath, 1 powder rm, kitchen and living area. add 3/f including laundry room, offie and master suite. add rear deck and spiral stair from 2/f to rear yard.project is subject to ab112 all-electric ordinance.Details
g/f: add 1 adu, 805sf adu 1-bed. remodel 2/f including 2 beds, 1 bath, 1 powder rm, kitchen and living area. add 3/f including laundry room, offie and master suite. add rear deck and spiral stair from 2/f to rear yard.project is subject to ab112 all-electric ordinance. | $525,000 |
| Jun 25, 2026 | In progress issued Jun 2026 | 27 Roanoke St | remodel kitchen, install new slider door at l2 rear, eliminate wall between kitchen and family room.Details
remodel kitchen, install new slider door at l2 rear, eliminate wall between kitchen and family room. | $70,000 |
| Mar 5, 2026 | In progress issued Apr 2026 | 265 Divisadero St | demo and rebuild laundry room and rear exterior staircase in-kind, replace 4 rear windows and 1 door each on l1,l2,l3. add 2 sky lights at l3 roof. demo and remodel kitchen and barhroom at l3.Details
demo and rebuild laundry room and rear exterior staircase in-kind, replace 4 rear windows and 1 door each on l1,l2,l3. add 2 sky lights at l3 roof. demo and remodel kitchen and barhroom at l3. | $150,000 |
| Jul 16, 2025 | In progress issued Jul 2025 | 159 Beaver St | replace damaged roof framing adn third floor framing. remodel 2 bathrooms and kitchen. add storage closet at laundry. new stucco at front. new windows at front and rear walls.Details
replace damaged roof framing adn third floor framing. remodel 2 bathrooms and kitchen. add storage closet at laundry. new stucco at front. new windows at front and rear walls. | $250,000 |
| May 28, 2025 | Completed final sign-off Mar 2026 | 422 Funston Av | unit# 422: remodel (e) bathroom and add powder room. unit# 424: remodel (e) kitchen, guest bathroon and primary bathroom. widen openings between kitchen/dining/living rooms. replace staircase to upper floor. replace rear windows and siding at both units.Details
unit# 422: remodel (e) bathroom and add powder room. unit# 424: remodel (e) kitchen, guest bathroon and primary bathroom. widen openings between kitchen/dining/living rooms. replace staircase to upper floor. replace rear windows and siding at both units. | $250,000 |
| May 9, 2025 | Completed final sign-off Jul 2025 | 1371 41st Av | kitchen remodel:new cabinets,plumbing fixtures and the backsplash.bathroom remodel:replace tile floor in shower floor and the tile walls. no structural work.Details
kitchen remodel:new cabinets,plumbing fixtures and the backsplash.bathroom remodel:replace tile floor in shower floor and the tile walls. no structural work. | $20,000 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 4035 20th St | level 2: kitchen and bathroom remodel. replace flooring throughout. replace tile at patio. level 3: primary bathroom remodel. replace flooring throughoutDetails
level 2: kitchen and bathroom remodel. replace flooring throughout. replace tile at patio. level 3: primary bathroom remodel. replace flooring throughout | $75,000 |
| Dec 23, 2024 | Completed final sign-off Sep 2025 | 700 05th Av | unit 700- remodel kitchen and bathroom . add sink in toilet room . relocate bedroom closet, replace 3 windows in kitchen/laundry . unit 702- remodel kitchen and bathroom. add sink in toilet room. relocate bedroom closet. replace 3 windows in kitchen/laundry . replace 11 windows at rear wall. replaceDetails
unit 700- remodel kitchen and bathroom . add sink in toilet room . relocate bedroom closet, replace 3 windows in kitchen/laundry . unit 702- remodel kitchen and bathroom. add sink in toilet room. relocate bedroom closet. replace 3 windows in kitchen/laundry . replace 11 windows at rear wall. replace | $95,000 |
| Dec 18, 2024 | Completed final sign-off Jul 2025 | 174 Santa Rosa Av | relocate/remodel kitchen,remove wall between dining and living room. remodel (e) bathroom. add sink in toilet room. all work on second floor. add (n) skylight located in hallway not visible from street.Details
relocate/remodel kitchen,remove wall between dining and living room. remodel (e) bathroom. add sink in toilet room. all work on second floor. add (n) skylight located in hallway not visible from street. | $70,000 |
| Jan 18, 2024 | Completed final sign-off Jul 2024 | 348 Magellan Av | demo kitchen cabinets and dividing wall between kitchen and dining room, install new cabinets, fixtures, appliances, add kitchen island, replace exterior dining room door and kitchen windows @ rear.Details
demo kitchen cabinets and dividing wall between kitchen and dining room, install new cabinets, fixtures, appliances, add kitchen island, replace exterior dining room door and kitchen windows @ rear. | $40,000 |
| Sep 29, 2023 | Completed final sign-off Jan 2024 | 771 Buena Vista West Av | kitchen remodel replace countertops, appliances, flooring, plumbing fixtures no structural workDetails
kitchen remodel replace countertops, appliances, flooring, plumbing fixtures no structural work | $25,000 |
| Jun 27, 2023 | Completed final sign-off Jun 2025 | 1643 44th Av | add bedroom, family room & bath @ grounf fl. relocate kitchen @ 2nd fl, remodel bathroom & add laundry room. add 3rd fl with three bedrooms & 2 baths. replacement of front windows and doors. infill lightwell on northside and new rear deck.Details
add bedroom, family room & bath @ grounf fl. relocate kitchen @ 2nd fl, remodel bathroom & add laundry room. add 3rd fl with three bedrooms & 2 baths. replacement of front windows and doors. infill lightwell on northside and new rear deck. | $300,000 |
| Apr 27, 2023 | Completed final sign-off Oct 2023 | 1870 47th Av | kitchen and bathroom remodel- demo west wall of kitchen, add peninsula, all new fixtures and finishes, bathroom- all new finishes and tile. reroof flat roof only. no structural work -reroofing onlyDetails
kitchen and bathroom remodel- demo west wall of kitchen, add peninsula, all new fixtures and finishes, bathroom- all new finishes and tile. reroof flat roof only. no structural work -reroofing only | $85,000 |
| Mar 6, 2023 | Completed final sign-off Jun 2023 | 2614 18th Av | remodel kitchen replace all finishes and appliances, remove skylight and patch roof relocate one interior door opening relocate one closet wall remodel (2) existing bath rooms all new finishesDetails
remodel kitchen replace all finishes and appliances, remove skylight and patch roof relocate one interior door opening relocate one closet wall remodel (2) existing bath rooms all new finishes | $70,000 |
| Nov 16, 2022 | Expired or cancelled cancelled May 2026 | 490 Pacific Av | renovate back of house kitchen and prep areas, addition of gelato clean room, new floor and wall finishes, new equipment, new lighting, code compliance upgrade of level one mens room and entry door.Details
renovate back of house kitchen and prep areas, addition of gelato clean room, new floor and wall finishes, new equipment, new lighting, code compliance upgrade of level one mens room and entry door. | $200,000 |
| Sep 27, 2021 | Completed final sign-off Mar 2022 | 1309 19th Av | units 1309 & 1311: remove wall between kitchen/mudroom, relocate door opening into kitchen, replace kitchen flooring, cabinetry, plumbing fixtures & tile. reinish wood flooring, replace aluminum windows w/wood double hung windows @ rear elevation (6) totalDetails
units 1309 & 1311: remove wall between kitchen/mudroom, relocate door opening into kitchen, replace kitchen flooring, cabinetry, plumbing fixtures & tile. reinish wood flooring, replace aluminum windows w/wood double hung windows @ rear elevation (6) total | $75,000 |
| Feb 4, 2021 | Never finaled issued Dec 2021, no final | 566 20th Av | rear extension of 3-story. add unit @ ground fl. reconfigure kitchen, dining & bath @ 2nd fl. roof deck @ rear of 2nd fl. add master suite including bedrm & bathrm, laundry & closets @ 3rd fl. remove wood trim @ front elevation (not original) & patch plaster as needed.Details
rear extension of 3-story. add unit @ ground fl. reconfigure kitchen, dining & bath @ 2nd fl. roof deck @ rear of 2nd fl. add master suite including bedrm & bathrm, laundry & closets @ 3rd fl. remove wood trim @ front elevation (not original) & patch plaster as needed. | $200,000 |
| Dec 8, 2020 | Completed final sign-off Sep 2023 | 1550 45th Av | reconfigure 1st fl: relocate kitchen, bathroom, add office & staircase to (n) 2nd fl. add 2nd story including (3) bedrooms & (2) baths. replace all doors & windows. (n) stucco & wood siding @ (n) addition. (n) roof. rear extension of footprint (53 sq ft)Details
reconfigure 1st fl: relocate kitchen, bathroom, add office & staircase to (n) 2nd fl. add 2nd story including (3) bedrooms & (2) baths. replace all doors & windows. (n) stucco & wood siding @ (n) addition. (n) roof. rear extension of footprint (53 sq ft) | $350,000 |
| Mar 7, 2019 | Completed final sign-off Jun 2019 | 439 11th Av | kitchen (10x15) and bath (5x8) remodel bring electrical up to code and replace finishes in kind.Details
kitchen (10x15) and bath (5x8) remodel bring electrical up to code and replace finishes in kind. | $30,000 |
| Sep 10, 2018 | Completed final sign-off Jan 2019 | 2119 41st Av | kitchen and bathroom remodel- replace appliances and finishes. replace cabinets and countertops. replace plumbing fixtures. no change to layout walls or openings.Details
kitchen and bathroom remodel- replace appliances and finishes. replace cabinets and countertops. replace plumbing fixtures. no change to layout walls or openings. | $25,000 |
| Aug 28, 2018 | Completed final sign-off Jan 2019 | 103 12th Av | (n) wall opening btwn. kitchen & fyr at 4th level. kitchen remodel under pa #201806192293.Details
(n) wall opening btwn. kitchen & fyr at 4th level. kitchen remodel under pa #201806192293. | $5,000 |
| Jun 19, 2018 | Completed final sign-off Jan 2019 | 103 12th Av | kitchen remodel in residentialDetails
kitchen remodel in residential | $20,000 |
| May 1, 2018 | Completed final sign-off Jan 2019 | 103 12th Av | replace kitchen finishes in kind.Details
replace kitchen finishes in kind. | $30,000 |
| Feb 16, 2018 | Completed final sign-off Jul 2018 | 439 11th Av | kitchen remodel, replace flooring, drywall, cabinets, countertop & backsplashDetails
kitchen remodel, replace flooring, drywall, cabinets, countertop & backsplash | $30,000 |
| Nov 14, 2017 | Completed final sign-off Aug 2018 | 832 Ortega St | new adu created @ 1st floor per ordinance# 95-17. kitchen added @ 1st floor in (e) space. ref pa# 2017/10/23/2006.Details
new adu created @ 1st floor per ordinance# 95-17. kitchen added @ 1st floor in (e) space. ref pa# 2017/10/23/2006. | $5,000 |
| Apr 25, 2017 | Never finaled issued Mar 2018, no final | 153 Santa Ynez Av | horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm.Details
horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm. | $160,000 |
| Jan 19, 2017 | Completed final sign-off Nov 2019 | 1894 48th Av | kitchen and bath remodel and dry rot repair, bath: shower pan replacement, replace dry rotted framing in-kind, kitchen: change cabinets, change sink locations, replace leay skylight. also to comply with complaint #201757621Details
kitchen and bath remodel and dry rot repair, bath: shower pan replacement, replace dry rotted framing in-kind, kitchen: change cabinets, change sink locations, replace leay skylight. also to comply with complaint #201757621 | $7,000 |