Back to kitchen remodel contractors
Acri Ddc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Jun 2026
- Last 24 months
- 8 permits filed
51 permits since 2000: 32 completed, 2 in progress, 7 never finaled, 10 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2025 | Expired or cancelled cancelled Feb 2025 | 2814 Clay St | revise legalization pa# 202106182818. add 4 stop hydraulic elevator. add interior hallway @ basement. remove (e) exterior stairway. rebuild interior stair in kind from level 2 to 3 to meet code. remodel level 3 kitchen & bathroom. 90 sq reare addition @ level 3 within buildable area. reframe level 3Details
revise legalization pa# 202106182818. add 4 stop hydraulic elevator. add interior hallway @ basement. remove (e) exterior stairway. rebuild interior stair in kind from level 2 to 3 to meet code. remodel level 3 kitchen & bathroom. 90 sq reare addition @ level 3 within buildable area. reframe level 3 | $149,000 |
| Jan 21, 2020 | Completed final sign-off Oct 2020 | 835 Douglass St | remodel kitchen, living room (e) bathroom, construct (n) bathroom install beam at livng room, replace top floor windows at rearDetails
remodel kitchen, living room (e) bathroom, construct (n) bathroom install beam at livng room, replace top floor windows at rear | $50,000 |
| Dec 3, 2018 | Completed final sign-off Jan 2020 | 37 05th Av | interior renovation of a single family residence, alterations to include kitchen remodel, new master bedroom and bath new 2nd fl. bathroomm and laundry, alteration to fenestration, no change to overall glarzed area all window repair and replacements in kind alteraton to ceiling and ele.Details
interior renovation of a single family residence, alterations to include kitchen remodel, new master bedroom and bath new 2nd fl. bathroomm and laundry, alteration to fenestration, no change to overall glarzed area all window repair and replacements in kind alteraton to ceiling and ele. | $200,000 |
| Jun 9, 2017 | Completed final sign-off Nov 2018 | 1315 Waller St | create (2) bedrooms, full bathroom, and mud room on 1st fl. bathroom and kitchen remodel on 2nd fl. new rear yard deck. bathrooms remodel on 3rd fl. bathroom remodel/new half bath on 4th fl. new interior stairs to create access from 1st fl to 2nd fl.Details
create (2) bedrooms, full bathroom, and mud room on 1st fl. bathroom and kitchen remodel on 2nd fl. new rear yard deck. bathrooms remodel on 3rd fl. bathroom remodel/new half bath on 4th fl. new interior stairs to create access from 1st fl to 2nd fl. | $500,000 |
| Feb 1, 2013 | Completed final sign-off May 2013 | 1650 Jackson St | remodel extg kitchen. no structural work.Details
remodel extg kitchen. no structural work. | $10,000 |
| Mar 11, 2011 | Completed final sign-off Feb 2012 | 268 Lombard St | unit #2 - revision to appl #201010153153: reverse locations of m. closet & m. bath, create sauna, eliminate proposed closets @ bedroom #2 & 2nd door into bedroom #2, keep 2 existing windows, replace 1 existing windows, modify kitchen cabinet layout, additoin structural work @ m. bath.Details
unit #2 - revision to appl #201010153153: reverse locations of m. closet & m. bath, create sauna, eliminate proposed closets @ bedroom #2 & 2nd door into bedroom #2, keep 2 existing windows, replace 1 existing windows, modify kitchen cabinet layout, additoin structural work @ m. bath. | $8,000 |
| Oct 15, 2010 | Completed final sign-off Feb 2012 | 268 Lombard St | unit#2 on upper and lower floors. interior remodeling, replacement and new windows and doors on three sides. relocate (e) bathrooms on upper and lower floors. remodel kitchen.Details
unit#2 on upper and lower floors. interior remodeling, replacement and new windows and doors on three sides. relocate (e) bathrooms on upper and lower floors. remodel kitchen. | $150,000 |
| May 26, 2010 | Completed final sign-off Sep 2010 | 476 27th St | six (6) new skylights at back of building in kitchen, bathroom and living roomDetails
six (6) new skylights at back of building in kitchen, bathroom and living room | $5,000 |
| May 26, 2010 | Completed final sign-off Nov 2010 | 476 27th St | replace exterior dryrot window and door. kitchen alteration. move stove, new electric cans, replace tile in bath/new wall fixtures. not visible from streetDetails
replace exterior dryrot window and door. kitchen alteration. move stove, new electric cans, replace tile in bath/new wall fixtures. not visible from street | $25,000 |
| Sep 13, 2007 | Completed final sign-off Nov 2007 | 242 Avila St | replace kitchen counter top, tiles with wood floor, sink, garbage disposal and faucet. enlarge opening in the wall between the kitchen and the dinning room from 30" to 68 1/2" construct 4x8 header in new opening re-install drywallDetails
replace kitchen counter top, tiles with wood floor, sink, garbage disposal and faucet. enlarge opening in the wall between the kitchen and the dinning room from 30" to 68 1/2" construct 4x8 header in new opening re-install drywall | $11,000 |