Back to bathroom remodel contractors
Acri Ddc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Jun 2026
- Last 24 months
- 8 permits filed
51 permits since 2000: 32 completed, 2 in progress, 7 never finaled, 10 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 14 completed, 3 expired or cancelled. Typically 1 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2025 | Completed final sign-off Jun 2026 | 618 48th Av | bathroom remodel (master 99sf & 2nd fl bath 88sf). replace plumbing fixtures, upgrade electrical, replace drywall of master bedroom due to flood.Details
bathroom remodel (master 99sf & 2nd fl bath 88sf). replace plumbing fixtures, upgrade electrical, replace drywall of master bedroom due to flood. | $45,000 |
| Feb 7, 2025 | Expired or cancelled cancelled Feb 2025 | 2814 Clay St | revise legalization pa# 202106182818. add 4 stop hydraulic elevator. add interior hallway @ basement. remove (e) exterior stairway. rebuild interior stair in kind from level 2 to 3 to meet code. remodel level 3 kitchen & bathroom. 90 sq reare addition @ level 3 within buildable area. reframe level 3Details
revise legalization pa# 202106182818. add 4 stop hydraulic elevator. add interior hallway @ basement. remove (e) exterior stairway. rebuild interior stair in kind from level 2 to 3 to meet code. remodel level 3 kitchen & bathroom. 90 sq reare addition @ level 3 within buildable area. reframe level 3 | $149,000 |
| Nov 12, 2021 | Completed final sign-off Feb 2024 | 611 El Camino Del Mar | revision to approved bpa#20181210/7898. minor reconfiguration on rooms on 1st f& bedrooms on 2nd fl. addition of two ensuite baths.Details
revision to approved bpa#20181210/7898. minor reconfiguration on rooms on 1st f& bedrooms on 2nd fl. addition of two ensuite baths. | |
| Jan 21, 2020 | Completed final sign-off Oct 2020 | 835 Douglass St | remodel kitchen, living room (e) bathroom, construct (n) bathroom install beam at livng room, replace top floor windows at rearDetails
remodel kitchen, living room (e) bathroom, construct (n) bathroom install beam at livng room, replace top floor windows at rear | $50,000 |
| Jan 16, 2020 | Completed final sign-off Apr 2020 | 833 Douglass St | remodeling e bath in kind at 1st flDetails
remodeling e bath in kind at 1st fl | $1,500 |
| Dec 3, 2018 | Completed final sign-off Jan 2020 | 37 05th Av | interior renovation of a single family residence, alterations to include kitchen remodel, new master bedroom and bath new 2nd fl. bathroomm and laundry, alteration to fenestration, no change to overall glarzed area all window repair and replacements in kind alteraton to ceiling and ele.Details
interior renovation of a single family residence, alterations to include kitchen remodel, new master bedroom and bath new 2nd fl. bathroomm and laundry, alteration to fenestration, no change to overall glarzed area all window repair and replacements in kind alteraton to ceiling and ele. | $200,000 |
| Jun 9, 2017 | Completed final sign-off Nov 2018 | 1315 Waller St | create (2) bedrooms, full bathroom, and mud room on 1st fl. bathroom and kitchen remodel on 2nd fl. new rear yard deck. bathrooms remodel on 3rd fl. bathroom remodel/new half bath on 4th fl. new interior stairs to create access from 1st fl to 2nd fl.Details
create (2) bedrooms, full bathroom, and mud room on 1st fl. bathroom and kitchen remodel on 2nd fl. new rear yard deck. bathrooms remodel on 3rd fl. bathroom remodel/new half bath on 4th fl. new interior stairs to create access from 1st fl to 2nd fl. | $500,000 |
| Jun 3, 2015 | Expired or cancelled expired Jan 2026 | 3751 20th St | new 3-story horizontal addition at rear. new living level below (e) structure. new below-grade garage at street level. new retaining walls at rear yard. replace existing gable window(alum) w/ new wood window. repair/replace existing wood window sashes where indicated.new living room,bedrooms,bath.Details
new 3-story horizontal addition at rear. new living level below (e) structure. new below-grade garage at street level. new retaining walls at rear yard. replace existing gable window(alum) w/ new wood window. repair/replace existing wood window sashes where indicated.new living room,bedrooms,bath. | $1,500,000 |
| Mar 11, 2011 | Completed final sign-off Feb 2012 | 268 Lombard St | unit #2 - revision to appl #201010153153: reverse locations of m. closet & m. bath, create sauna, eliminate proposed closets @ bedroom #2 & 2nd door into bedroom #2, keep 2 existing windows, replace 1 existing windows, modify kitchen cabinet layout, additoin structural work @ m. bath.Details
unit #2 - revision to appl #201010153153: reverse locations of m. closet & m. bath, create sauna, eliminate proposed closets @ bedroom #2 & 2nd door into bedroom #2, keep 2 existing windows, replace 1 existing windows, modify kitchen cabinet layout, additoin structural work @ m. bath. | $8,000 |
| Oct 15, 2010 | Completed final sign-off Feb 2012 | 268 Lombard St | unit#2 on upper and lower floors. interior remodeling, replacement and new windows and doors on three sides. relocate (e) bathrooms on upper and lower floors. remodel kitchen.Details
unit#2 on upper and lower floors. interior remodeling, replacement and new windows and doors on three sides. relocate (e) bathrooms on upper and lower floors. remodel kitchen. | $150,000 |
| May 26, 2010 | Completed final sign-off Sep 2010 | 476 27th St | six (6) new skylights at back of building in kitchen, bathroom and living roomDetails
six (6) new skylights at back of building in kitchen, bathroom and living room | $5,000 |
| May 26, 2010 | Completed final sign-off Nov 2010 | 476 27th St | replace exterior dryrot window and door. kitchen alteration. move stove, new electric cans, replace tile in bath/new wall fixtures. not visible from streetDetails
replace exterior dryrot window and door. kitchen alteration. move stove, new electric cans, replace tile in bath/new wall fixtures. not visible from street | $25,000 |
| Mar 31, 2010 | Completed final sign-off Oct 2010 | 1170 Green St | work in unit #1176. bathroom remodel w/no structural changes. alter closet by adding wall.Details
work in unit #1176. bathroom remodel w/no structural changes. alter closet by adding wall. | $25,000 |
| Jul 26, 2007 | Completed final sign-off Mar 2010 | 908 Ashbury St | remodel master bath add new guest bath. revision to app #200707066185. work limited to 2nd floor inside 1 unitDetails
remodel master bath add new guest bath. revision to app #200707066185. work limited to 2nd floor inside 1 unit | $38,500 |
| Jul 6, 2007 | Expired or cancelled expired Mar 2010 | 908 Ashbury St | remodel bathroom, install sink, new cabinetry on 3rd floor. remove one nonload bearing partition wall, add new non load bearing partition wall and door at 2nd floor. new lighting on both floors. replace both door with pocket door.Details
remodel bathroom, install sink, new cabinetry on 3rd floor. remove one nonload bearing partition wall, add new non load bearing partition wall and door at 2nd floor. new lighting on both floors. replace both door with pocket door. | $62,500 |
| Dec 5, 2006 | Completed final sign-off Mar 2007 | 2722 Baker St | bathroom remodel & reconfiguration. filling in of (e) light well with living space & 1hour fire rated wall. partition of bathroom to create powder room.Details
bathroom remodel & reconfiguration. filling in of (e) light well with living space & 1hour fire rated wall. partition of bathroom to create powder room. | $35,000 |
| Dec 5, 2006 | Completed final sign-off Mar 2007 | 2724 Baker St | bathroom remodel & reconfiguration. filling in of (e) light well with living space & 1 hour fire rated wall. conversion of coat closet to create laundry facility and powder room.Details
bathroom remodel & reconfiguration. filling in of (e) light well with living space & 1 hour fire rated wall. conversion of coat closet to create laundry facility and powder room. | $35,000 |