Permit GraphShortlistSan Francisco building permits since 2000

Able Window Inc.

Contractor license
739973
State license record
Based in
Pacifica
On San Francisco permits
Nov 2000 to Aug 2022
Last 24 months
0 permits filed

124 permits since 2000: 97 completed, 12 never finaled, 15 expired or cancelled.

Of the 12 never-finaled permits, 3 are 5 to 10 years old, 9 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Stairs permits

AllStairs 2Kitchen remodel 5Bathroom remodel 4

2 stairs permits: 2 completed. Typically 0 days from filing to permit and 66 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 21, 2018Completed
final sign-off Nov 2018
55 West Clay Stlike-for-like in size with block frames. -replace 6 double hung windows with 6 essence wood windows with vintage grids in top sash (3w 1h): stairs and hall. -replace 2 bedroom windows with 2 essence wood full casement windows (meets egress) with checkrail and 3w1h vintage grids in top half.
Details
Permit
201809211015
Permit issued
Sep 21, 2018
Final sign-off
Nov 7, 2018

like-for-like in size with block frames. -replace 6 double hung windows with 6 essence wood windows with vintage grids in top sash (3w 1h): stairs and hall. -replace 2 bedroom windows with 2 essence wood full casement windows (meets egress) with checkrail and 3w1h vintage grids in top half.

Open the permit page

$6,079
Jul 30, 2013Completed
final sign-off Oct 2013
368 Highland Avinstall 6 essence fiberglass/wood windows like for like, 1 at entry by stairs, 2 at master bedroom, 2 at girls room and 1 at baby's room. visible from street. u-factor 0.40 max.
Details
Permit
201307303165
Permit issued
Jul 30, 2013
Final sign-off
Oct 24, 2013

install 6 essence fiberglass/wood windows like for like, 1 at entry by stairs, 2 at master bedroom, 2 at girls room and 1 at baby's room. visible from street. u-factor 0.40 max.

Open the permit page

$7,488