Back to kitchen remodel contractors
Abacus Group Builders Inc
- Based in
- Corte Madera
- On San Francisco permits
- Sep 2003 to Apr 2026
- Last 24 months
- 2 permits filed
68 permits since 2000: 50 completed, 2 in progress, 15 never finaled, 1 expired or cancelled.
Of the 15 never-finaled permits, 1 is 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 8 completed, 2 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 386 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2024 | Completed final sign-off Feb 2025 | 3736 Jackson St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $50,000 |
| May 15, 2018 | Completed final sign-off Mar 2021 | 74 Midcrest Wy | remodel kitchen and bath, 2 bedrooms and 2 baths by excavating lower levelDetails
remodel kitchen and bath, 2 bedrooms and 2 baths by excavating lower level | $500,000 |
| Aug 28, 2015 | Completed final sign-off Oct 2016 | 1911 Vallejo St | interior remodel of sfd, including kitchen and master bathroom with one replacement window and 2 replacement doors. no addition.Details
interior remodel of sfd, including kitchen and master bathroom with one replacement window and 2 replacement doors. no addition. | $69,395 |
| Apr 4, 2014 | Completed final sign-off Mar 2015 | 634 30th St | interior remodel of s.f.r. including kitchen, master bathroom, master closet, interior stair, upper floor bedroom & bath. exterior work to replace portion of exterior siding & replacement of existing windows & doors. (no addition).Details
interior remodel of s.f.r. including kitchen, master bathroom, master closet, interior stair, upper floor bedroom & bath. exterior work to replace portion of exterior siding & replacement of existing windows & doors. (no addition). | $250,000 |
| Jan 16, 2014 | Completed final sign-off Aug 2016 | 70 Woodacre Dr | interior remodel & addition of 154.5 sq ft to the 2nd fl level, including kitchen on 1st level. replacement of 17 (e) windows & enclosure of front yard with a stucco garden wall & metal gate.Details
interior remodel & addition of 154.5 sq ft to the 2nd fl level, including kitchen on 1st level. replacement of 17 (e) windows & enclosure of front yard with a stucco garden wall & metal gate. | $52,500 |
| Mar 20, 2013 | Never finaled issued Mar 2013, no final | 572 Moultrie St | 1)demolish the 32 sq ft floor area to the north of the kitchen, 2) replace the back deck and stair with a new stair and slightly larger deck. 3)remove the siding and stucco stone from and restore stucco finish. rebuild front stair and landing in wood. 4)replace windows and add skylights.Details
1)demolish the 32 sq ft floor area to the north of the kitchen, 2) replace the back deck and stair with a new stair and slightly larger deck. 3)remove the siding and stucco stone from and restore stucco finish. rebuild front stair and landing in wood. 4)replace windows and add skylights. | $50,000 |
| Jan 7, 2013 | Completed final sign-off May 2013 | 1200 California St | repl flooring at kitchen & master bedrm, reface kitchen cabinets, repl appliances, repl counters, vanity, repl bath door, vanity @bath & master bath,remove vanity @dressing, repl master closet doors & organizers,install motorized shades, install recessed lighting throughout,repl radiator cover,Details
repl flooring at kitchen & master bedrm, reface kitchen cabinets, repl appliances, repl counters, vanity, repl bath door, vanity @bath & master bath,remove vanity @dressing, repl master closet doors & organizers,install motorized shades, install recessed lighting throughout,repl radiator cover, | $40,000 |
| Feb 28, 2012 | Expired or cancelled expired May 2013 | 2525 Webster St | revision to pa #2010.07.08.6203 - demolish stair from deck to rear yard. enlarge deck & reconfigure stairs from deck to rear yard. remove 2- kitchen windows & replace with one full width bi-folding window system.Details
revision to pa #2010.07.08.6203 - demolish stair from deck to rear yard. enlarge deck & reconfigure stairs from deck to rear yard. remove 2- kitchen windows & replace with one full width bi-folding window system. | $30,000 |
| Jan 22, 2010 | Completed final sign-off Aug 2012 | 2525 Webster St | new kitchen remodel bathrooms, new laundry room, enclose courtyard, replace window. remodel in all 4-floors.Details
new kitchen remodel bathrooms, new laundry room, enclose courtyard, replace window. remodel in all 4-floors. | $380,000 |
| Apr 3, 2009 | Never finaled issued Apr 2009, no final | 117 Lower Tr | alternations to lower level foyer, master bedroom & kitchen.Details
alternations to lower level foyer, master bedroom & kitchen. | $4,200 |
| Oct 30, 2003 | Completed final sign-off Sep 2004 | 1406 Diamond St | new drywall, interior partitions,windows,plumbing,elect.heating (new kitchen/bath) in (e)2-story resDetails
new drywall, interior partitions,windows,plumbing,elect.heating (new kitchen/bath) in (e)2-story res | $63,500 |