68 permits since 2000: 50 completed, 2 in progress, 15 never finaled, 1 expired or cancelled.
Of the 15 never-finaled permits, 1 is 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 8 completed, 1 in progress, 2 never finaled. Typically 4 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2025 | In progress issued Dec 2025 | 7 Edna St | conditioned space behind @ lower level: (1) new bathroom,family room. re-locate laundry room to lower level. new interior connecting stairs. new furnace. new windows and exterior door. new patio w/steps to grade structural scope per plans.Details
conditioned space behind @ lower level: (1) new bathroom,family room. re-locate laundry room to lower level. new interior connecting stairs. new furnace. new windows and exterior door. new patio w/steps to grade structural scope per plans. | $41,500 |
| May 15, 2018 | Completed final sign-off Mar 2021 | 74 Midcrest Wy | remodel kitchen and bath, 2 bedrooms and 2 baths by excavating lower levelDetails
remodel kitchen and bath, 2 bedrooms and 2 baths by excavating lower level | $500,000 |
| Jul 1, 2016 | Never finaled issued Jul 2016, no final | 730 Grand View Av | legalize (e) non-permitted storage room and bathroom on 1st floor of (e) 2 story sfd. maher naDetails
legalize (e) non-permitted storage room and bathroom on 1st floor of (e) 2 story sfd. maher na | $100 |
| Aug 28, 2015 | Completed final sign-off Oct 2016 | 1911 Vallejo St | interior remodel of sfd, including kitchen and master bathroom with one replacement window and 2 replacement doors. no addition.Details
interior remodel of sfd, including kitchen and master bathroom with one replacement window and 2 replacement doors. no addition. | $69,395 |
| Feb 4, 2015 | Completed final sign-off Nov 2015 | 3221 Washington St | replace exterior entry stair treads and risers, repair leak and install new guard handrail. interior alterations to 1st fl laundry and mech rooms, add window. replace fixtures and finises in existing 1st fl bath, infill window. new light fixtures in 1st fl playroom, laundry rm, and bathDetails
replace exterior entry stair treads and risers, repair leak and install new guard handrail. interior alterations to 1st fl laundry and mech rooms, add window. replace fixtures and finises in existing 1st fl bath, infill window. new light fixtures in 1st fl playroom, laundry rm, and bath | $40,180 |
| Jun 23, 2014 | Completed final sign-off Mar 2015 | 634 30th St | construct new foundation under master bath bay(extg was non existent) leave extg sliding glass door and window in master bedroom(elimate 4-panel sliding glass door from previous submittal). revision to app#201404042428.Details
construct new foundation under master bath bay(extg was non existent) leave extg sliding glass door and window in master bedroom(elimate 4-panel sliding glass door from previous submittal). revision to app#201404042428. | |
| Apr 4, 2014 | Completed final sign-off Mar 2015 | 634 30th St | interior remodel of s.f.r. including kitchen, master bathroom, master closet, interior stair, upper floor bedroom & bath. exterior work to replace portion of exterior siding & replacement of existing windows & doors. (no addition).Details
interior remodel of s.f.r. including kitchen, master bathroom, master closet, interior stair, upper floor bedroom & bath. exterior work to replace portion of exterior siding & replacement of existing windows & doors. (no addition). | $250,000 |
| Jan 7, 2013 | Completed final sign-off May 2013 | 1200 California St | repl flooring at kitchen & master bedrm, reface kitchen cabinets, repl appliances, repl counters, vanity, repl bath door, vanity @bath & master bath,remove vanity @dressing, repl master closet doors & organizers,install motorized shades, install recessed lighting throughout,repl radiator cover,Details
repl flooring at kitchen & master bedrm, reface kitchen cabinets, repl appliances, repl counters, vanity, repl bath door, vanity @bath & master bath,remove vanity @dressing, repl master closet doors & organizers,install motorized shades, install recessed lighting throughout,repl radiator cover, | $40,000 |
| Jul 20, 2010 | Never finaled issued Jul 2010, no final | 32 States St | revision to 201006104240. lateral additon of 1st floor underneath 2nd floor elements. 1st sloor work includes new playroowm, game room, new laundry and new bath.Details
revision to 201006104240. lateral additon of 1st floor underneath 2nd floor elements. 1st sloor work includes new playroowm, game room, new laundry and new bath. | $100,000 |
| Jan 22, 2010 | Completed final sign-off Aug 2012 | 2525 Webster St | new kitchen remodel bathrooms, new laundry room, enclose courtyard, replace window. remodel in all 4-floors.Details
new kitchen remodel bathrooms, new laundry room, enclose courtyard, replace window. remodel in all 4-floors. | $380,000 |
| Oct 30, 2003 | Completed final sign-off Sep 2004 | 1406 Diamond St | new drywall, interior partitions,windows,plumbing,elect.heating (new kitchen/bath) in (e)2-story resDetails
new drywall, interior partitions,windows,plumbing,elect.heating (new kitchen/bath) in (e)2-story res | $63,500 |