Back to kitchen remodel contractors
Aaa Construction & Design
- Based in
- Novato
- On San Francisco permits
- Jan 2014 to Apr 2023
- Last 24 months
- 0 permits filed
91 permits since 2000: 84 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
27 kitchen remodel permits: 26 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2023 | Expired or cancelled cancelled Jul 2023 | 999 Green St | 1 kitchen remodel like for like: new cabinets, new appliancesDetails
1 kitchen remodel like for like: new cabinets, new appliances | $25,000 |
| Dec 22, 2022 | Completed final sign-off Mar 2023 | 240 Richland Av | (1) kitchen remodel like for like; new cabinets, new appliances.Details
(1) kitchen remodel like for like; new cabinets, new appliances. | $25,000 |
| Jul 14, 2022 | Completed final sign-off Feb 2024 | 32 Peralta Av | 2/f: remodel bathroom, kitchen, dining & living room.enlarge rear window opening.Details
2/f: remodel bathroom, kitchen, dining & living room.enlarge rear window opening. | $38,600 |
| Apr 11, 2022 | Completed final sign-off Nov 2023 | 46 Douglass St | (1) kitchen remodel: new cabinets, new coutnertop, new appliances (1) bathroom remodel: new shower pan, new shower valve, new vanity new toiletDetails
(1) kitchen remodel: new cabinets, new coutnertop, new appliances (1) bathroom remodel: new shower pan, new shower valve, new vanity new toilet | $50,000 |
| Aug 30, 2021 | Completed final sign-off Jun 2022 | 425 01st St | unit #1708: kitchen remodel replacement in kind full bath remodel replacement in kind. lights per cenc 150.0 (k). no structural.Details
unit #1708: kitchen remodel replacement in kind full bath remodel replacement in kind. lights per cenc 150.0 (k). no structural. | $50,000 |
| Aug 30, 2021 | Completed final sign-off Mar 2022 | 1101 Green St | unit# 202: kitchen remodel is replacement in kind new sink, appliances, (garbage disposal) refridgerator, dishwasher, range, exhaust hood, high efficency, lights, cabinetry,Details
unit# 202: kitchen remodel is replacement in kind new sink, appliances, (garbage disposal) refridgerator, dishwasher, range, exhaust hood, high efficency, lights, cabinetry, | $40,000 |
| Jun 11, 2021 | Completed final sign-off Jan 2023 | 2843 Balboa St | one 87sf kitchen remodel like for like. one 35sf bath (full) remodel like for like with new shower over tub. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 and (k) 5.Details
one 87sf kitchen remodel like for like. one 35sf bath (full) remodel like for like with new shower over tub. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 and (k) 5. | $47,765 |
| Jan 28, 2021 | Completed final sign-off Feb 2022 | 1201 California St | (1) kitchen remodel. like for like - cabinets, appliances, recessed lights, gfci. (1) bathroom remodel: like for like, vanity, toilet, fan, gfci, faucet, light replacement, electrical panel.Details
(1) kitchen remodel. like for like - cabinets, appliances, recessed lights, gfci. (1) bathroom remodel: like for like, vanity, toilet, fan, gfci, faucet, light replacement, electrical panel. | $50,000 |
| Jan 28, 2021 | Completed final sign-off Feb 2023 | 863 Haight St | unit 3: (1) kitchen remodel. like for like. cabinet counters, appliance replacement, electrical upgrade and dedicated lines, gfci, new lighting.Details
unit 3: (1) kitchen remodel. like for like. cabinet counters, appliance replacement, electrical upgrade and dedicated lines, gfci, new lighting. | $35,000 |
| Aug 22, 2020 | Completed final sign-off Feb 2021 | 57 Theresa St | interior kitchen remodel. remove 2 non load-bearing interior partitions, replace ( e ) rear window w/ exterior french doors. remodel kitchen - cabinets, counters, appliances. electrical upgrade.Details
interior kitchen remodel. remove 2 non load-bearing interior partitions, replace ( e ) rear window w/ exterior french doors. remodel kitchen - cabinets, counters, appliances. electrical upgrade. | $30,000 |
| Apr 23, 2020 | Completed final sign-off Sep 2020 | 2255 Franklin St | comply w/ complaint #202027689, #202027880, #202028301: kitchen remodel like for like - new cabinets, new sink, new appliances, new faucet & garbage disposal. electrical outlets upgrade through out the house, sub-panel upgrade, new recess led lights 14 units, 4 ceiling lights.Details
comply w/ complaint #202027689, #202027880, #202028301: kitchen remodel like for like - new cabinets, new sink, new appliances, new faucet & garbage disposal. electrical outlets upgrade through out the house, sub-panel upgrade, new recess led lights 14 units, 4 ceiling lights. | $10,000 |
| Feb 11, 2020 | Completed final sign-off Oct 2020 | 213 06th Av | unit b. remodel kitchen, master bath and half bath. new cabinets, appliances, sinks, shower pan, toilets, vanitiesDetails
unit b. remodel kitchen, master bath and half bath. new cabinets, appliances, sinks, shower pan, toilets, vanities | $50,000 |
| Jun 28, 2019 | Completed final sign-off Oct 2019 | 1839 15th St | remodel kitchen & bathroom, like for like. install 24 new led reccessed lights, replace switches and outlets, and gfi.Details
remodel kitchen & bathroom, like for like. install 24 new led reccessed lights, replace switches and outlets, and gfi. | $49,950 |
| Nov 20, 2018 | Completed final sign-off Jul 2019 | 1255 California St | remodel kitchen like for like: new cabinets, counter tops, faucet, appliances, garbage disposal, 6 recessed lights, and 8 outlets.Details
remodel kitchen like for like: new cabinets, counter tops, faucet, appliances, garbage disposal, 6 recessed lights, and 8 outlets. | $12,000 |
| Jun 21, 2018 | Completed final sign-off Dec 2018 | 401 Peninsula Av | kitchen remodel, like for likeDetails
kitchen remodel, like for like | $30,000 |
| May 16, 2018 | Completed final sign-off Feb 2019 | 645 Haight St | ste 3b; 1 kitchen remodel like for like; new cabinets, new counter tops, new appliances. 1 guest bathroom remodel like for like; new tub, new tile, new faucet, new toilet, new vanity, 1 subpanel upgrade.Details
ste 3b; 1 kitchen remodel like for like; new cabinets, new counter tops, new appliances. 1 guest bathroom remodel like for like; new tub, new tile, new faucet, new toilet, new vanity, 1 subpanel upgrade. | $45,000 |
| Feb 27, 2018 | Completed final sign-off May 2018 | 2211 California St | unit 300 ,kitchen remodel like for like, new cabinets, new appliances, new sink, new faucetDetails
unit 300 ,kitchen remodel like for like, new cabinets, new appliances, new sink, new faucet | $21,900 |
| Feb 13, 2018 | Completed final sign-off Jul 2018 | 403 Main St | unit #215: (1) kitchen remodel like for like: new cabinet, new sink, new appliances. no rough framing. maher n/aDetails
unit #215: (1) kitchen remodel like for like: new cabinet, new sink, new appliances. no rough framing. maher n/a | $25,000 |
| Jan 10, 2018 | Completed final sign-off Feb 2019 | 920 Harrison St | unit 8: (1) kitchen remodel- new cabinets, new countertop, new appliances, new sink, new faucet, new garbage disposal. (1) master bathroom remodel- new vinity, new toilet, new shower pan, new faucet, new tiles.Details
unit 8: (1) kitchen remodel- new cabinets, new countertop, new appliances, new sink, new faucet, new garbage disposal. (1) master bathroom remodel- new vinity, new toilet, new shower pan, new faucet, new tiles. | $35,000 |
| Jun 19, 2017 | Completed final sign-off Jan 2018 | 2211 California St | unit 307: remove e non bearing wall to expand kitchen. replace cabinets and countertop new sink replace bath vanity, sink, tub, tile new sub panel, 12 can lights, upgrade kitchen, dining rm, new faucets, sub and shower valve, bath tub, tileDetails
unit 307: remove e non bearing wall to expand kitchen. replace cabinets and countertop new sink replace bath vanity, sink, tub, tile new sub panel, 12 can lights, upgrade kitchen, dining rm, new faucets, sub and shower valve, bath tub, tile | $35,000 |
| May 19, 2017 | Completed final sign-off Jan 2021 | 2926 Kirkham St | kitchen remodel, upgrade electrical system under separate permit, no structural work, no wall modification/removalDetails
kitchen remodel, upgrade electrical system under separate permit, no structural work, no wall modification/removal | $15,000 |
| May 9, 2017 | Completed final sign-off Sep 2017 | 601 Van Ness Av | remove (e) kitchen cabinets, faucet, countertops, sink, re-do plumbing. replace with new ones. replace (e) carpets and laminate floors with engineered hardwood floors. n/a for maher.Details
remove (e) kitchen cabinets, faucet, countertops, sink, re-do plumbing. replace with new ones. replace (e) carpets and laminate floors with engineered hardwood floors. n/a for maher. | $30,000 |
| Apr 27, 2017 | Completed final sign-off Jul 2017 | 2760 Sacramento St | 1 kitchen remodel like for like: new cabinets, new appliancess, new sink and faucet, new counter tops, new washer and dryer. upgrade electrical subpanel.Details
1 kitchen remodel like for like: new cabinets, new appliancess, new sink and faucet, new counter tops, new washer and dryer. upgrade electrical subpanel. | $25,750 |
| Apr 24, 2017 | Completed final sign-off Oct 2017 | 200 Whitney St | one kitchen remodel, like for like. new kitchen cabinets, new counter top, new sink and existing appliances.Details
one kitchen remodel, like for like. new kitchen cabinets, new counter top, new sink and existing appliances. | $15,500 |
| Jan 25, 2016 | Completed final sign-off Jul 2016 | 1259 18th Av | 2nd floor: kitchen renovation. like for like. all lighting to be led. install built-in shelves in living room. 3rd floor: 1.5 hall bath renovation. like for like. electrical panel upgrade in garage in garage. no walls removed or relocated.Details
2nd floor: kitchen renovation. like for like. all lighting to be led. install built-in shelves in living room. 3rd floor: 1.5 hall bath renovation. like for like. electrical panel upgrade in garage in garage. no walls removed or relocated. | $15,000 |
| Jul 30, 2015 | Completed final sign-off May 2017 | 2453 Chestnut St | interior remodel of 2 residences. 2453: addition of 2 bathrooms, relocate kitchen from 2nd floor to 1st floor. update extg bathroom & add nw bedroom on 2nd floor. add interior staircase connection 1st & 2nd fl. 2455: add 1 bathroom. add 1 bedroom. update bathroom & kitchen. ref app# 201507161701.Details
interior remodel of 2 residences. 2453: addition of 2 bathrooms, relocate kitchen from 2nd floor to 1st floor. update extg bathroom & add nw bedroom on 2nd floor. add interior staircase connection 1st & 2nd fl. 2455: add 1 bathroom. add 1 bedroom. update bathroom & kitchen. ref app# 201507161701. | $200,000 |
| Jul 16, 2015 | Completed final sign-off May 2017 | 2453 Chestnut St | xint. remodel of 1st fl. residence. excavtion @ 1st fl. to increase ceiling hght & patio. 1st flr: new living room, dinig, room, bedroom & bath. replace 30 windows in-kind. all new windows to be wd. clad casement. int stair, kitchen, 2nd & 3rd fl. work under separate permit. excavation <50 c.y.Details
xint. remodel of 1st fl. residence. excavtion @ 1st fl. to increase ceiling hght & patio. 1st flr: new living room, dinig, room, bedroom & bath. replace 30 windows in-kind. all new windows to be wd. clad casement. int stair, kitchen, 2nd & 3rd fl. work under separate permit. excavation <50 c.y. | $300,000 |