Block 1427, lot 006
213 06th Ave
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 3
- Rooms
- 4 bathrooms
- Building
- 2,271 sq ft
- Lot
- 2,395 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 16, 2026 | In progress issued Apr 2026 | 213 06th Av | Reliable Construction Inc | revision to pa 202603167634 (repair front step <50%) replace (e) wood stair in-kind; repair (e) upper deck/landing in-kind new steel railing at deck stairDetails
revision to pa 202603167634 (repair front step <50%) replace (e) wood stair in-kind; repair (e) upper deck/landing in-kind new steel railing at deck stair | $3,000 |
| Mar 16, 2026 | In progress issued Mar 2026 | 213 06th Av | Reliable Construction Inc | repair front steps less than 50%Details
repair front steps less than 50% | $10,000 |
| May 26, 2020 | Completed final sign-off Aug 2020 | 213 06th Av | Bay Area Window Pros | replace (12) windows total .top floor replace (10) windows,front windows (5) to wood aluminum clad double hung. rear and lite well to be in vinyl frames. bottom floor (2) rear windows to be in vinyl frames. same size and location. u factor max. 0.30Details
replace (12) windows total .top floor replace (10) windows,front windows (5) to wood aluminum clad double hung. rear and lite well to be in vinyl frames. bottom floor (2) rear windows to be in vinyl frames. same size and location. u factor max. 0.30 | $10,500 |
| Mar 12, 2020 | Completed final sign-off Oct 2020 | 213 06th Av | Aaa Construction & Design | amend permit #2020 0211 4113. change from half bath to hallway bathroom new tub, new sink, new toilet, 65 sq ft.Details
amend permit #2020 0211 4113. change from half bath to hallway bathroom new tub, new sink, new toilet, 65 sq ft. | |
| Feb 11, 2020 | Completed final sign-off Oct 2020 | 213 06th Av | Aaa Construction & Design | unit b. remodel kitchen, master bath and half bath. new cabinets, appliances, sinks, shower pan, toilets, vanitiesDetails
unit b. remodel kitchen, master bath and half bath. new cabinets, appliances, sinks, shower pan, toilets, vanities | $50,000 |
| Nov 27, 2013 | Completed final sign-off Feb 2014 | 213 06th Av | area of work: rear building. replace foundaton on north side of rear building and dryrot workDetails
area of work: rear building. replace foundaton on north side of rear building and dryrot work | $10,000 | |
| Jan 3, 2012 | Completed final sign-off Jan 2012 | 213 06th Av | Protection Roofing Co, | reroofingDetails
reroofing | $7,500 |
| Jul 30, 2010 | Never finaled issued Jul 2010, no final | 213 06th Av | repair dryrot at hallway and unit b studio wall. no wall changes. less than 50%Details
repair dryrot at hallway and unit b studio wall. no wall changes. less than 50% | $400 | |
| Jul 3, 2009 | Expired or cancelled cancelled Jan 2026 | 213 06th Av | needs re-checkDetails
needs re-check | $400 | |
| Jun 13, 2007 | Never finaled issued Jun 2007, no final | 213 06th Av | repair front stairs less than 50%.Details
repair front stairs less than 50%. | $1,400 | |
| Jun 7, 2007 | Completed final sign-off Jun 2007 | 213 06th Av | nov# 200704041. repairs stairs & landing less than 50%.Details
nov# 200704041. repairs stairs & landing less than 50%. | $800 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.