A W T Construction Group Inc
- Based in
- Benicia
- On San Francisco permits
- Mar 2016 to May 2023
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 40 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2016 | Completed final sign-off Apr 2016 | 471 Lansdale Av | repair existing exterior stairs. break out stucco above stairs, remove existing tile on treads and landing; water proof, install new tile and repair stucco. no change to framing and walls.Details
repair existing exterior stairs. break out stucco above stairs, remove existing tile on treads and landing; water proof, install new tile and repair stucco. no change to framing and walls. | $5,200 |