Back to bathroom remodel contractors
A W T Construction Group Inc
- Based in
- Benicia
- On San Francisco permits
- Mar 2016 to May 2023
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 236 days from filing to permit and 610 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2020 | Completed final sign-off Sep 2021 | 670 Brunswick St | revision to 201809059151, additon of new child toilet in bath area, increase size childrens sink to include 3 faucets, move e janitorial sink to adjacent gardening storage area and replace old sink with new mop sink, chang appliance type in brk rm, door leaves changed to flush panel for 2 doors.Details
revision to 201809059151, additon of new child toilet in bath area, increase size childrens sink to include 3 faucets, move e janitorial sink to adjacent gardening storage area and replace old sink with new mop sink, chang appliance type in brk rm, door leaves changed to flush panel for 2 doors. | $20,000 |
| Sep 5, 2018 | Completed final sign-off Sep 2021 | 670 Brunswick St | interior remodel of existing club house to a preschool, including remodel bathroom and teacher's loungeDetails
interior remodel of existing club house to a preschool, including remodel bathroom and teacher's lounge | $300,000 |