Back to kitchen remodel contractors
A Tamam Construction Inc.
- Based in
- Fremont
- On San Francisco permits
- Sep 2017 to Jun 2026
- Last 24 months
- 11 permits filed
30 permits since 2000: 19 completed, 7 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 2 completed, 3 in progress, 1 never finaled, 1 expired or cancelled. Typically 16 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2025 | In progress issued Nov 2025 | 255 Sanchez St | revision to pa #202506047908 for kitchen remodel project. add scope to enclose existing lightwell patio with skylights. remove hall at kitchen to patio.Details
revision to pa #202506047908 for kitchen remodel project. add scope to enclose existing lightwell patio with skylights. remove hall at kitchen to patio. | $15,000 |
| Jun 4, 2025 | In progress issued Jun 2025 | 255 Sanchez St | kitchen remodel. move e) lightwell wall. structural upgrade at kitchenDetails
kitchen remodel. move e) lightwell wall. structural upgrade at kitchen | $80,000 |
| Jan 30, 2024 | In progress issued Jan 2024 | 158 Stonecrest Dr | kitchen remodel-like for like; master bathroom remodel-demo walls, tub to shower, guest bathroom-remodeli like for like; replace 14 windows and 1 sliding door like for like, no structural changes.Details
kitchen remodel-like for like; master bathroom remodel-demo walls, tub to shower, guest bathroom-remodeli like for like; replace 14 windows and 1 sliding door like for like, no structural changes. | $60,000 |
| Nov 13, 2023 | Completed final sign-off Sep 2024 | 418 Marietta Dr | 1st flr: garage - install ev charger, install back-up battery. 2nd flr: kitchen remodel, new bathroom, replace front windows. remove fireplace, remvoe balcony, new stucco in the 2nd flr, electrical panel upgrade to 225amp.Details
1st flr: garage - install ev charger, install back-up battery. 2nd flr: kitchen remodel, new bathroom, replace front windows. remove fireplace, remvoe balcony, new stucco in the 2nd flr, electrical panel upgrade to 225amp. | $100,000 |
| Dec 15, 2021 | Completed final sign-off Mar 2022 | 1407 De Haro St | 150 sf partial remodel to kitchen with partial removal of non bearing wall between hallway and living room of kitchen. counter tops and appliances to remain in the same area.Details
150 sf partial remodel to kitchen with partial removal of non bearing wall between hallway and living room of kitchen. counter tops and appliances to remain in the same area. | $8,000 |
| Dec 16, 2020 | Never finaled issued Feb 2021, no final | 286 San Jose Av | remodel existing kitchen with calgreen compliant plumbing fixtures & energy efficient appliances. cap plumbing lines & gas lines temporary. reroute & reconnect to new appliances & plumbing fixtures.Details
remodel existing kitchen with calgreen compliant plumbing fixtures & energy efficient appliances. cap plumbing lines & gas lines temporary. reroute & reconnect to new appliances & plumbing fixtures. | $25,000 |
| Jun 26, 2019 | Expired or cancelled withdrawn Jul 2019 | 150 Josiah Av | interior upgrades: 1 kitchen & 2 bathroom remodel in kind, including (n) washer/dryer hook-ups. flooring surfaces & relocate electrical subpanel. (n) smoke/carbon monoxide detectors.Details
interior upgrades: 1 kitchen & 2 bathroom remodel in kind, including (n) washer/dryer hook-ups. flooring surfaces & relocate electrical subpanel. (n) smoke/carbon monoxide detectors. | $90,000 |