Back to bathroom remodel contractors
A Tamam Construction Inc.
- Based in
- Fremont
- On San Francisco permits
- Sep 2017 to Jun 2026
- Last 24 months
- 11 permits filed
30 permits since 2000: 19 completed, 7 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 12 completed, 2 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2026 | Completed final sign-off Aug 2026 | 2694 Bush St | bathroom remodel like for like, convert shower to bathtub, replace toilet, vanity sink and fan all in same place, no structural changes.Details
bathroom remodel like for like, convert shower to bathtub, replace toilet, vanity sink and fan all in same place, no structural changes. | $26,000 |
| Apr 13, 2026 | In progress filed Apr 2026, not yet issued | 1012 Geneva Av | legalization of an existing 577 sq. ft. first-floor area located beneath the existing second-floor overhang, consisting of one bedroom, one bathroom, and one storage roomDetails
legalization of an existing 577 sq. ft. first-floor area located beneath the existing second-floor overhang, consisting of one bedroom, one bathroom, and one storage room | $35,000 |
| Feb 13, 2026 | Completed final sign-off May 2026 | 465 10th St | unit 304: two bathroom remodels, like for like, upstairs bathroom, replace tub, sink, vanity, toilet, fan upgrade. 48 sq ft. downstairs bathroom like for like 40 sq ft.Details
unit 304: two bathroom remodels, like for like, upstairs bathroom, replace tub, sink, vanity, toilet, fan upgrade. 48 sq ft. downstairs bathroom like for like 40 sq ft. | $22,000 |
| Feb 6, 2026 | Completed final sign-off Apr 2026 | 329 Chattanooga St | master bathroom remodel like for like, replace tub, shower, toilet, sink, vanity, fan, upgrade m.e.p. to code, 78 sq ftDetails
master bathroom remodel like for like, replace tub, shower, toilet, sink, vanity, fan, upgrade m.e.p. to code, 78 sq ft | $13,000 |
| Mar 5, 2025 | Completed final sign-off Oct 2025 | 573 Dolores St | no excavation, addition or exterior work to be done. (e) ground floor slab to be waterproofed per material described in the drawings. create a non structural door for the storage and garbage room. convert existing closet into a half bathroom (sink & toilet).Details
no excavation, addition or exterior work to be done. (e) ground floor slab to be waterproofed per material described in the drawings. create a non structural door for the storage and garbage room. convert existing closet into a half bathroom (sink & toilet). | $15,000 |
| Jan 30, 2024 | In progress issued Jan 2024 | 158 Stonecrest Dr | kitchen remodel-like for like; master bathroom remodel-demo walls, tub to shower, guest bathroom-remodeli like for like; replace 14 windows and 1 sliding door like for like, no structural changes.Details
kitchen remodel-like for like; master bathroom remodel-demo walls, tub to shower, guest bathroom-remodeli like for like; replace 14 windows and 1 sliding door like for like, no structural changes. | $60,000 |
| Nov 13, 2023 | Completed final sign-off Sep 2024 | 418 Marietta Dr | 1st flr: garage - install ev charger, install back-up battery. 2nd flr: kitchen remodel, new bathroom, replace front windows. remove fireplace, remvoe balcony, new stucco in the 2nd flr, electrical panel upgrade to 225amp.Details
1st flr: garage - install ev charger, install back-up battery. 2nd flr: kitchen remodel, new bathroom, replace front windows. remove fireplace, remvoe balcony, new stucco in the 2nd flr, electrical panel upgrade to 225amp. | $100,000 |
| Feb 1, 2023 | Completed final sign-off Apr 2023 | 155 Upland Dr | 1 bathroom remodel like for like, replace tub, and replace switches, update.Details
1 bathroom remodel like for like, replace tub, and replace switches, update. | $7,000 |
| Aug 17, 2020 | Completed final sign-off Mar 2021 | 933 Church St | bathroom remodeling. electric up to code upgrade. plumbing upgrade @ bathroom. upgrade sub panel. install ductless ac @ bedroom.Details
bathroom remodeling. electric up to code upgrade. plumbing upgrade @ bathroom. upgrade sub panel. install ductless ac @ bedroom. | $20,000 |
| Nov 19, 2019 | Completed final sign-off Jan 2020 | 257 Clinton Pk | remodel bathroom like for like. bldg, plmg, remove and replace, electrical remove and replace. add 1 recess light above the tub and add sink to the vanity.Details
remodel bathroom like for like. bldg, plmg, remove and replace, electrical remove and replace. add 1 recess light above the tub and add sink to the vanity. | $5,000 |
| Jun 26, 2019 | Expired or cancelled withdrawn Jul 2019 | 150 Josiah Av | interior upgrades: 1 kitchen & 2 bathroom remodel in kind, including (n) washer/dryer hook-ups. flooring surfaces & relocate electrical subpanel. (n) smoke/carbon monoxide detectors.Details
interior upgrades: 1 kitchen & 2 bathroom remodel in kind, including (n) washer/dryer hook-ups. flooring surfaces & relocate electrical subpanel. (n) smoke/carbon monoxide detectors. | $90,000 |
| Jan 29, 2019 | Completed final sign-off Apr 2019 | 1312 Larkin St | bathroom remodel. replacing lights, receptacles, new laundry sink at (e) laundry room. adding 1 recess light at walk-in closet. replacing outlets at living roomDetails
bathroom remodel. replacing lights, receptacles, new laundry sink at (e) laundry room. adding 1 recess light at walk-in closet. replacing outlets at living room | $33,500 |
| Dec 4, 2018 | Completed final sign-off Feb 2019 | 1418 48th Av | 2nd flr - convert storage rm to (n) half bath w/ laminate flooring, (n) fan, (n) lights-switches-receptacles. remove sink at 1st flr garage. replace furnace at garageDetails
2nd flr - convert storage rm to (n) half bath w/ laminate flooring, (n) fan, (n) lights-switches-receptacles. remove sink at 1st flr garage. replace furnace at garage | $10,000 |
| Nov 16, 2018 | Completed final sign-off Jul 2019 | 338 Spear St | remodel (e) bathroom, replace (e) toilet, sink & cabinet, add wall between shower & sink, replace (e) lightingDetails
remodel (e) bathroom, replace (e) toilet, sink & cabinet, add wall between shower & sink, replace (e) lighting | $8,000 |
| Sep 6, 2017 | Completed final sign-off Dec 2017 | 578 Cordova St | bathroom remodel: demo; new fixtures-sink, faucet, vanity, toilet, upgrade plumbing as needed. electrical upgradses, add fan combo with light, replace electrical fixtures.Details
bathroom remodel: demo; new fixtures-sink, faucet, vanity, toilet, upgrade plumbing as needed. electrical upgradses, add fan combo with light, replace electrical fixtures. | $10,000 |