Back to kitchen remodel contractors
A S Anicete Construction
- Based in
- El Sobrante
- On San Francisco permits
- Jul 2007 to Feb 2024
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 6 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2024 | Completed final sign-off Aug 2024 | 226 Jules Av | 2/f: relocate (e) kitchen, convert living room to a bedroom. add 2 full bathrooms. remodel a bedroom. replace windows: 3 at rear and 4 at side. replace water heater and furnace. 3/f: remodel (e) bathroom in kind. all interior work on 2/f and 3/f.Details
2/f: relocate (e) kitchen, convert living room to a bedroom. add 2 full bathrooms. remodel a bedroom. replace windows: 3 at rear and 4 at side. replace water heater and furnace. 3/f: remodel (e) bathroom in kind. all interior work on 2/f and 3/f. | $100,000 |
| Sep 30, 2022 | Completed final sign-off Dec 2022 | 53 Hartford St | remodel kitchen in kind. remove exiting cabinets and counter top. install new cabinets and counter top install new led recess lights- new gas stove, new exhaust fan install new plumbing fixtures. replce subpanel need additinal space for gfci afci breakers. unit#aDetails
remodel kitchen in kind. remove exiting cabinets and counter top. install new cabinets and counter top install new led recess lights- new gas stove, new exhaust fan install new plumbing fixtures. replce subpanel need additinal space for gfci afci breakers. unit#a | $22,000 |