Back to bathroom remodel contractors
A S Anicete Construction
- Based in
- El Sobrante
- On San Francisco permits
- Jul 2007 to Feb 2024
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2024 | Completed final sign-off Aug 2024 | 226 Jules Av | 2/f: relocate (e) kitchen, convert living room to a bedroom. add 2 full bathrooms. remodel a bedroom. replace windows: 3 at rear and 4 at side. replace water heater and furnace. 3/f: remodel (e) bathroom in kind. all interior work on 2/f and 3/f.Details
2/f: relocate (e) kitchen, convert living room to a bedroom. add 2 full bathrooms. remodel a bedroom. replace windows: 3 at rear and 4 at side. replace water heater and furnace. 3/f: remodel (e) bathroom in kind. all interior work on 2/f and 3/f. | $100,000 |
| Sep 1, 2022 | Completed final sign-off Oct 2022 | 53 Hartford St | unit #c: remodel one bathroom in kind. replace bath tub, remove wall tiles and floor tiles. install new 2 led recess light install new tiles. install new plumbing fixtures & install new exhaust fanDetails
unit #c: remodel one bathroom in kind. replace bath tub, remove wall tiles and floor tiles. install new 2 led recess light install new tiles. install new plumbing fixtures & install new exhaust fan | $12,000 |
| Jul 14, 2022 | Completed final sign-off Sep 2022 | 53 Hartford St | unit #1: remodel 2 bathrooms in kind remove existing wall tiles, floor tiles, replace bath tub/shower pan, install new plumbing fixtures, install led recess lights, replace exaust fan, install new toilets and vanities.Details
unit #1: remodel 2 bathrooms in kind remove existing wall tiles, floor tiles, replace bath tub/shower pan, install new plumbing fixtures, install led recess lights, replace exaust fan, install new toilets and vanities. | $20,000 |