Back to kitchen remodel contractors
A - Mac Construction
- Based in
- San Mateo
- On San Francisco permits
- Sep 2000 to Aug 2014
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2014 | Completed final sign-off Aug 2014 | 2296 Fulton St | remodel (e) kitchen - new cabinets, countertop, and tile floor; bathroom remodel new tub, tub surround, toilet, vanity sink, tile floor; to comply with cec150k) 8 & 10. compliance with ordinance #155-13 not requiredDetails
remodel (e) kitchen - new cabinets, countertop, and tile floor; bathroom remodel new tub, tub surround, toilet, vanity sink, tile floor; to comply with cec150k) 8 & 10. compliance with ordinance #155-13 not required | $20,000 |