A M G Construction
- Based in
- San Anselmo
- On San Francisco permits
- May 2012 to Jul 2024
- Last 24 months
- 0 permits filed
57 permits since 2000: 51 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 10 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2021 | Completed final sign-off Jan 2024 | 4576 19th St | rev to pa 202105100059 (kitchen& bathroom remodel) & add 2 bathrs, remodel lower level, interior remodel. replace windows and utilty area in front yard, rear deck repair and add spirale stair.Details
rev to pa 202105100059 (kitchen& bathroom remodel) & add 2 bathrs, remodel lower level, interior remodel. replace windows and utilty area in front yard, rear deck repair and add spirale stair. | $149,744 |
| Apr 15, 2016 | Completed final sign-off Oct 2016 | 650 Delancey St | #414 - interior remodel, remove (e) guardrail & install new guardrail and handrail to (e) stairs. new bookcase wall to new walk-in closet, enclose laundry room. sprinkler work under separate permit (if required).Details
#414 - interior remodel, remove (e) guardrail & install new guardrail and handrail to (e) stairs. new bookcase wall to new walk-in closet, enclose laundry room. sprinkler work under separate permit (if required). | $40,000 |
| Feb 3, 2015 | Completed final sign-off Sep 2015 | 283 States St | remodel 2 bathrooms at 2nd floor. replace wood floors at 2nd floor. replace spiral stairs at 2nd fl to 1st floor. upgrade electrical at 2nd floor.Details
remodel 2 bathrooms at 2nd floor. replace wood floors at 2nd floor. replace spiral stairs at 2nd fl to 1st floor. upgrade electrical at 2nd floor. | $60,000 |
| Oct 17, 2013 | Completed final sign-off Jan 2014 | 3051 25th St | in kind lightwell stairs, 2nd means of egress. replace footingsDetails
in kind lightwell stairs, 2nd means of egress. replace footings | $10,000 |
| Jun 18, 2013 | Completed final sign-off Nov 2013 | 283 States St | kitchen remodel, add water closet, upgrade electrical, move some non structural walls. repalace spiral stairs with new one, lighting changes to comply with cec 150(k).Details
kitchen remodel, add water closet, upgrade electrical, move some non structural walls. repalace spiral stairs with new one, lighting changes to comply with cec 150(k). | $55,000 |
| Jun 11, 2013 | Completed final sign-off Oct 2022 | 780 Oak St | new stair access to existing attic at 3rd fl which will remain an unoccupied space to be used for storage. new skylights will be added at the sides and rear of existing pitched roof.skylight to be flat & non visible from public way.Details
new stair access to existing attic at 3rd fl which will remain an unoccupied space to be used for storage. new skylights will be added at the sides and rear of existing pitched roof.skylight to be flat & non visible from public way. | $30,000 |