Back to bathroom remodel contractors
A M G Construction
- Based in
- San Anselmo
- On San Francisco permits
- May 2012 to Jul 2024
- Last 24 months
- 0 permits filed
57 permits since 2000: 51 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 14 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2024 | Completed final sign-off Nov 2024 | 2006 Sloat Bl | remodel bathroom, add new bathroom, remove wall, remodel kitchenDetails
remodel bathroom, add new bathroom, remove wall, remodel kitchen | $125,000 |
| Dec 12, 2022 | Never finaled issued Dec 2022, no final | 1177 California St | unit #1014: repair water damage leak from unit above dining room ceiing and walls replace 1 bathroom approx 60" x 104" replace all fixture and finishes in kindDetails
unit #1014: repair water damage leak from unit above dining room ceiing and walls replace 1 bathroom approx 60" x 104" replace all fixture and finishes in kind | $50,100 |
| Aug 24, 2021 | Completed final sign-off Jan 2024 | 4576 19th St | rev to pa 202105100059 (kitchen& bathroom remodel) & add 2 bathrs, remodel lower level, interior remodel. replace windows and utilty area in front yard, rear deck repair and add spirale stair.Details
rev to pa 202105100059 (kitchen& bathroom remodel) & add 2 bathrs, remodel lower level, interior remodel. replace windows and utilty area in front yard, rear deck repair and add spirale stair. | $149,744 |
| May 10, 2021 | Completed final sign-off Jan 2024 | 4576 19th St | remodel 1 kitchen and 1 bath in kind. no structural work - no framing modificationDetails
remodel 1 kitchen and 1 bath in kind. no structural work - no framing modification | $70,000 |
| May 27, 2020 | Completed final sign-off Oct 2020 | 164 San Carlos St | remodel 2 existing bathroom and 1 kitchen in kindDetails
remodel 2 existing bathroom and 1 kitchen in kind | $17,000 |
| Sep 13, 2019 | Completed final sign-off Dec 2019 | 298 Upper Tr | remodel (1) bathroom in-kind, same fixture count/locationDetails
remodel (1) bathroom in-kind, same fixture count/location | $30,000 |
| Mar 27, 2018 | Completed final sign-off Feb 2019 | 119 Culebra Tr | kitchen and bath remodel. remove wall at dining room on level 2Details
kitchen and bath remodel. remove wall at dining room on level 2 | $150,000 |
| Sep 8, 2017 | Completed final sign-off Jan 2018 | 530 Chestnut St | 302c: remodel extg kitchen in kind, remodel extg master bathroom in kind on 3rd floor of multi unit bldg. n/a for maherDetails
302c: remodel extg kitchen in kind, remodel extg master bathroom in kind on 3rd floor of multi unit bldg. n/a for maher | $25,000 |
| Mar 1, 2016 | Completed final sign-off Sep 2016 | 2303 Bryant St | correct complaint #201567162; #8,#10,#11,#12,#13. remodel 1 bathroom. replace kitchen sink and cabinets. repair cracks ceilings and walls.Details
correct complaint #201567162; #8,#10,#11,#12,#13. remodel 1 bathroom. replace kitchen sink and cabinets. repair cracks ceilings and walls. | $50,000 |
| Feb 3, 2015 | Completed final sign-off Sep 2015 | 283 States St | remodel 2 bathrooms at 2nd floor. replace wood floors at 2nd floor. replace spiral stairs at 2nd fl to 1st floor. upgrade electrical at 2nd floor.Details
remodel 2 bathrooms at 2nd floor. replace wood floors at 2nd floor. replace spiral stairs at 2nd fl to 1st floor. upgrade electrical at 2nd floor. | $60,000 |
| Oct 10, 2014 | Expired or cancelled expired Mar 2016 | 1925 Gough St | 4th flr, unit #41: renovate kitchen, master bath & bedroom, 2nd & 3rd baths & laundry roomDetails
4th flr, unit #41: renovate kitchen, master bath & bedroom, 2nd & 3rd baths & laundry room | $65,879 |
| Mar 18, 2014 | Completed final sign-off Aug 2014 | 901 Powell St | 2 bathrooms: replace all tile and fixtures. upgrade electrical as necessary observe title 24. add fans as necessary. replace 1 tub with shower. 35 sf and 49 sf.Details
2 bathrooms: replace all tile and fixtures. upgrade electrical as necessary observe title 24. add fans as necessary. replace 1 tub with shower. 35 sf and 49 sf. | $75,000 |
| Feb 13, 2014 | Completed final sign-off Sep 2014 | 2250 Hyde St | replace five (5) windows not visible to street & one (1) patio door in-kind (u=0.4 max), remodel kitchen (same locations), upgrade electrical, remodel 1 bath: tiles & fixtures, remodel 1 bath: replace tiles, fixtures, tub w/shower). install new wood floors. add gas for gas log at (e) fireplace.Details
replace five (5) windows not visible to street & one (1) patio door in-kind (u=0.4 max), remodel kitchen (same locations), upgrade electrical, remodel 1 bath: tiles & fixtures, remodel 1 bath: replace tiles, fixtures, tub w/shower). install new wood floors. add gas for gas log at (e) fireplace. | $140,000 |
| Mar 20, 2013 | Completed final sign-off Jul 2013 | 371 Laidley St | bathroom remodel replace tub with shouwer, move toilet upgreade electrical ,add fan replace 1 insert window at bath with new not visible from the street, bathroom size approx 7x7Details
bathroom remodel replace tub with shouwer, move toilet upgreade electrical ,add fan replace 1 insert window at bath with new not visible from the street, bathroom size approx 7x7 | $13,000 |
| Feb 13, 2013 | Completed final sign-off Apr 2013 | 1374 Hayes St | bathroom remodel replacment in kind ,upgrade electrical and plumbing as necessary 5x8 lighting must comply w/cec 150 kDetails
bathroom remodel replacment in kind ,upgrade electrical and plumbing as necessary 5x8 lighting must comply w/cec 150 k | $12,000 |
| Jul 2, 2012 | Completed final sign-off Mar 2013 | 1925 Gough St | general remodel of cono unit 53. 3 bathrooms and kitchen to be remodeled with wall changesDetails
general remodel of cono unit 53. 3 bathrooms and kitchen to be remodeled with wall changes | $110,000 |