Back to kitchen remodel contractors
A+G Design+Build
- Based in
- San Francisco
- On San Francisco permits
- Jul 2023 to Aug 2026
- Last 24 months
- 10 permits filed
15 permits since 2000: 12 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 in progress. Typically 7 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 2126 24th St | remodel (e) kitchen, no structural changes, demolish selected non-structural partitions, new casework, appliances, plumbing fixtures,lighting,electrical and finishes.Details
remodel (e) kitchen, no structural changes, demolish selected non-structural partitions, new casework, appliances, plumbing fixtures,lighting,electrical and finishes. | $25,000 |
| Feb 27, 2026 | Completed final sign-off Sep 2026 | 1930 Grove St | unit 3- remodel (e) kitchen no sturcrtural changes demo selected non structural partitions, new casework, appliances plumbing fixtures and electrical fnishes and lightings.Details
unit 3- remodel (e) kitchen no sturcrtural changes demo selected non structural partitions, new casework, appliances plumbing fixtures and electrical fnishes and lightings. | $51,144 |
| Oct 3, 2025 | Completed final sign-off Jun 2026 | 723 46th Av | infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath.Details
infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath. | $109,391 |
| Jun 30, 2025 | Completed final sign-off Dec 2025 | 25 Holyoke St | revision to pa# 2025-0602-7662 to add /change in scope of work: demolish walls at kitchen/living room-patch ceiling and floor. close kitchen ceiling with new 5/8 drywall. reinforce attic rafters and ceiling joists. to comply with nov#202538270.Details
revision to pa# 2025-0602-7662 to add /change in scope of work: demolish walls at kitchen/living room-patch ceiling and floor. close kitchen ceiling with new 5/8 drywall. reinforce attic rafters and ceiling joists. to comply with nov#202538270. | $30,000 |
| Jun 2, 2025 | Completed final sign-off Dec 2025 | 25 Holyoke St | remodel bathroom and kitchen. new cabinets, fixtures, appliance. (n) gfi circuits. (n) sink. (n) smoke detector.Details
remodel bathroom and kitchen. new cabinets, fixtures, appliance. (n) gfi circuits. (n) sink. (n) smoke detector. | $32,000 |
| Mar 4, 2025 | Completed final sign-off Mar 2025 | 666 Morse St | show skylight location @ kitchen revision to pa#2024-0726-7375Details
show skylight location @ kitchen revision to pa#2024-0726-7375 | |
| Apr 10, 2024 | Completed final sign-off Jul 2024 | 2621 Bryant St | lower level demo kitchen finishes, fixture & appliances, install new of the same. no structural changes. new electrical & plumbingDetails
lower level demo kitchen finishes, fixture & appliances, install new of the same. no structural changes. new electrical & plumbing | $59,425 |