Back to bathroom remodel contractors
A+G Design+Build
- Based in
- San Francisco
- On San Francisco permits
- Jul 2023 to Aug 2026
- Last 24 months
- 10 permits filed
15 permits since 2000: 12 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 in progress. Typically 10 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | Completed final sign-off Sep 2026 | 600 Arkansas St | legalize (e) bathroom at ground floor as shown on sheet a-1, reference pa# 201911217857Details
legalize (e) bathroom at ground floor as shown on sheet a-1, reference pa# 201911217857 | $25,000 |
| Feb 27, 2026 | In progress issued Apr 2026 | 600 Arkansas St | partial bathroom renovation. (n) tub, patch and repair floor at (e) tub. relocate wd, new finishes. (e) lighting and wall outlets to remain. (n) nonstructural partition and cabinet.Details
partial bathroom renovation. (n) tub, patch and repair floor at (e) tub. relocate wd, new finishes. (e) lighting and wall outlets to remain. (n) nonstructural partition and cabinet. | $10,000 |
| Oct 3, 2025 | Completed final sign-off Jun 2026 | 723 46th Av | infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath.Details
infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath. | $109,391 |
| Jun 2, 2025 | Completed final sign-off Dec 2025 | 25 Holyoke St | remodel bathroom and kitchen. new cabinets, fixtures, appliance. (n) gfi circuits. (n) sink. (n) smoke detector.Details
remodel bathroom and kitchen. new cabinets, fixtures, appliance. (n) gfi circuits. (n) sink. (n) smoke detector. | $32,000 |
| Aug 15, 2024 | Completed final sign-off Sep 2024 | 2126 24th St | demolition existing bathroom and replace in kind with new finishes, plumbing fixtures, accessories, lighting, and electrical.Details
demolition existing bathroom and replace in kind with new finishes, plumbing fixtures, accessories, lighting, and electrical. | $20,552 |
| Jul 6, 2023 | Completed final sign-off Dec 2023 | 1930 Grove St | bathroom remodel: change (e) layout add fanDetails
bathroom remodel: change (e) layout add fan | $15,000 |