Back to kitchen remodel contractors
A D K Construction
- Based in
- San Bruno
- On San Francisco permits
- Sep 2003 to Aug 2021
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2021 | Completed final sign-off Jul 2022 | 959 14th St | remodel (e) kitchen new cabinets, floor, electrical fixtures, plumbing insatll new bathroom with toilet, sink, shower/tub. installing (4) new windows @ exterior rearDetails
remodel (e) kitchen new cabinets, floor, electrical fixtures, plumbing insatll new bathroom with toilet, sink, shower/tub. installing (4) new windows @ exterior rear | $140,000 |
| Sep 18, 2018 | Completed final sign-off Jan 2019 | 374 Arkansas St | new shower, bathtub, showerpan, kitchen counters, 2 bathroom vanities, fixtures, toiles, re-tile bathroom floors, replace light fixtures as needed throughout remodel.Details
new shower, bathtub, showerpan, kitchen counters, 2 bathroom vanities, fixtures, toiles, re-tile bathroom floors, replace light fixtures as needed throughout remodel. | $70,000 |
| Oct 9, 2012 | Completed final sign-off Feb 2013 | 28 Panorama Dr | kitchen remodel: install hood intead of microwave w/vent, remove wall between kitchen & dining area, move sink and dishwasher to right 3', replace cabinets, replace appliancesDetails
kitchen remodel: install hood intead of microwave w/vent, remove wall between kitchen & dining area, move sink and dishwasher to right 3', replace cabinets, replace appliances | $40,000 |
| Jun 21, 2012 | Completed final sign-off Dec 2012 | 2760 19th Av | remodel kitchen & 2 bathrooms. lighting must comply cec 150(1c). kitchen=90 sq ft, bathroom #1=54 sq ft, bathroom #2=60 sq ft.Details
remodel kitchen & 2 bathrooms. lighting must comply cec 150(1c). kitchen=90 sq ft, bathroom #1=54 sq ft, bathroom #2=60 sq ft. | $50,000 |