Back to bathroom remodel contractors
A D K Construction
- Based in
- San Bruno
- On San Francisco permits
- Sep 2003 to Aug 2021
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2021 | Completed final sign-off Jul 2022 | 959 14th St | remodel (e) kitchen new cabinets, floor, electrical fixtures, plumbing insatll new bathroom with toilet, sink, shower/tub. installing (4) new windows @ exterior rearDetails
remodel (e) kitchen new cabinets, floor, electrical fixtures, plumbing insatll new bathroom with toilet, sink, shower/tub. installing (4) new windows @ exterior rear | $140,000 |
| Sep 18, 2018 | Completed final sign-off Jan 2019 | 374 Arkansas St | new shower, bathtub, showerpan, kitchen counters, 2 bathroom vanities, fixtures, toiles, re-tile bathroom floors, replace light fixtures as needed throughout remodel.Details
new shower, bathtub, showerpan, kitchen counters, 2 bathroom vanities, fixtures, toiles, re-tile bathroom floors, replace light fixtures as needed throughout remodel. | $70,000 |
| Oct 16, 2014 | Completed final sign-off Sep 2016 | 1034 Filbert St | remodel existing study, add a bathroom, replace existing property-line windows in lightwell.Details
remodel existing study, add a bathroom, replace existing property-line windows in lightwell. | $20,000 |
| Mar 19, 2013 | Completed final sign-off Jul 2013 | 1701 Broadway | remodel 2 bathrooms, new plumbing fixtures tile, floorsDetails
remodel 2 bathrooms, new plumbing fixtures tile, floors | $40,000 |
| Jun 21, 2012 | Completed final sign-off Dec 2012 | 2760 19th Av | remodel kitchen & 2 bathrooms. lighting must comply cec 150(1c). kitchen=90 sq ft, bathroom #1=54 sq ft, bathroom #2=60 sq ft.Details
remodel kitchen & 2 bathrooms. lighting must comply cec 150(1c). kitchen=90 sq ft, bathroom #1=54 sq ft, bathroom #2=60 sq ft. | $50,000 |
| May 12, 2008 | Completed final sign-off Dec 2008 | 28 Panorama Dr | conversion of an unfinished first floor (ground level) to add one bedroom & one bathroom, add a french door & three windows, relocate hot water heater, install a new 97% furnace (new location).Details
conversion of an unfinished first floor (ground level) to add one bedroom & one bathroom, add a french door & three windows, relocate hot water heater, install a new 97% furnace (new location). | $50,000 |
| May 16, 2006 | Completed final sign-off Aug 2006 | 28 Panorama Dr | bathroom remodel- replace all fixtures in place, replace enclosed walaled shower with glass shower surround, add 2 motion sensor switches, 1 timer switch, 3 gfi outlets, 3 recessed lights, 2 wall sconce lights, vent fanDetails
bathroom remodel- replace all fixtures in place, replace enclosed walaled shower with glass shower surround, add 2 motion sensor switches, 1 timer switch, 3 gfi outlets, 3 recessed lights, 2 wall sconce lights, vent fan | $30,000 |