Back to kitchen remodel contractors
A C Y Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2019 to Jun 2026
- Last 24 months
- 2 permits filed
12 permits since 2000: 9 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 in progress. Typically 25 days from filing to permit and 275 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2025 | Completed final sign-off Dec 2025 | 2574 17th Av | remodel existing kitchen on 2nd floor. in-kindDetails
remodel existing kitchen on 2nd floor. in-kind | $26,000 |
| Sep 27, 2024 | In progress issued Dec 2024 | 2042 44th Av | 2nd fl: remodel (e) kitchen & bathroom. remove walls btwn kitchen & living room. (n) beam btwn living & kitchen. replace 2 windows in the front and rear of the building. upgrade electrical at 2nd fl. (n) insulationDetails
2nd fl: remodel (e) kitchen & bathroom. remove walls btwn kitchen & living room. (n) beam btwn living & kitchen. replace 2 windows in the front and rear of the building. upgrade electrical at 2nd fl. (n) insulation | $70,000 |
| Jul 28, 2023 | Completed final sign-off Nov 2024 | 723 38th Av | 1st fl. add master bedroom/bathroom, bedroom & family rm with bar sink, & two burner stoves, 2nd fl. relocate (e) kitchen & bedroom (n) stairway connect to 1st fl. remove lightwell stairway, infill (e) partial lightwell, 1st & 2nd fl. at left (south) side of building infll (e) lightwell, 2nd fl. atDetails
1st fl. add master bedroom/bathroom, bedroom & family rm with bar sink, & two burner stoves, 2nd fl. relocate (e) kitchen & bedroom (n) stairway connect to 1st fl. remove lightwell stairway, infill (e) partial lightwell, 1st & 2nd fl. at left (south) side of building infll (e) lightwell, 2nd fl. at | $160,000 |
| Dec 28, 2022 | Completed final sign-off Jun 2023 | 3835 Clement St | remodel living, dining, 2 bedrooms, and existing kitchen. no layout changes. remove and replace exist. lath and plaster with sheetroock associate with electrical work. full kitchen remodel to incl. new cabinets and counter.Details
remodel living, dining, 2 bedrooms, and existing kitchen. no layout changes. remove and replace exist. lath and plaster with sheetroock associate with electrical work. full kitchen remodel to incl. new cabinets and counter. | $70,000 |
| Apr 15, 2021 | Completed final sign-off Aug 2022 | 529 Lombard St | relocate (e) laundry area to expand & remodel (e) kitchen on both units. remodel (e) bath into full bath on both units. cosmetic upgrades to (e) w.c. on both units. relocate unit 321's furnace to the garage.Details
relocate (e) laundry area to expand & remodel (e) kitchen on both units. remodel (e) bath into full bath on both units. cosmetic upgrades to (e) w.c. on both units. relocate unit 321's furnace to the garage. | $15,000 |