Back to bathroom remodel contractors
A C Y Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2019 to Jun 2026
- Last 24 months
- 2 permits filed
12 permits since 2000: 9 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 in progress. Typically 62 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2024 | In progress issued Dec 2024 | 2042 44th Av | 2nd fl: remodel (e) kitchen & bathroom. remove walls btwn kitchen & living room. (n) beam btwn living & kitchen. replace 2 windows in the front and rear of the building. upgrade electrical at 2nd fl. (n) insulationDetails
2nd fl: remodel (e) kitchen & bathroom. remove walls btwn kitchen & living room. (n) beam btwn living & kitchen. replace 2 windows in the front and rear of the building. upgrade electrical at 2nd fl. (n) insulation | $70,000 |
| Oct 5, 2023 | Completed final sign-off Feb 2024 | 156 Niagara Av | first floor-new bedroom, bathroom and family room. (490 sf)Details
first floor-new bedroom, bathroom and family room. (490 sf) | $50,000 |
| Jul 28, 2023 | Completed final sign-off Nov 2024 | 723 38th Av | 1st fl. add master bedroom/bathroom, bedroom & family rm with bar sink, & two burner stoves, 2nd fl. relocate (e) kitchen & bedroom (n) stairway connect to 1st fl. remove lightwell stairway, infill (e) partial lightwell, 1st & 2nd fl. at left (south) side of building infll (e) lightwell, 2nd fl. atDetails
1st fl. add master bedroom/bathroom, bedroom & family rm with bar sink, & two burner stoves, 2nd fl. relocate (e) kitchen & bedroom (n) stairway connect to 1st fl. remove lightwell stairway, infill (e) partial lightwell, 1st & 2nd fl. at left (south) side of building infll (e) lightwell, 2nd fl. at | $160,000 |
| Jul 1, 2022 | Completed final sign-off Dec 2022 | 2006 16th Av | remodel & enlarge (e) master bathroom on 2/f per plan. reconfigure (e) bedroom to create (n) guest room at 2/f per plan.Details
remodel & enlarge (e) master bathroom on 2/f per plan. reconfigure (e) bedroom to create (n) guest room at 2/f per plan. | $30,000 |
| May 27, 2022 | Completed final sign-off Oct 2022 | 176 Morningside Dr | remodel 1 (e) middle floor bathroom. no structural.Details
remodel 1 (e) middle floor bathroom. no structural. | $5,000 |
| Apr 15, 2021 | Completed final sign-off Aug 2022 | 529 Lombard St | relocate (e) laundry area to expand & remodel (e) kitchen on both units. remodel (e) bath into full bath on both units. cosmetic upgrades to (e) w.c. on both units. relocate unit 321's furnace to the garage.Details
relocate (e) laundry area to expand & remodel (e) kitchen on both units. remodel (e) bath into full bath on both units. cosmetic upgrades to (e) w.c. on both units. relocate unit 321's furnace to the garage. | $15,000 |
| Oct 27, 2020 | Completed final sign-off Oct 2021 | 1427 21st Av | revision to approved pa # 201912179735. on 1/f: delete replacement of (e) footing and slab, delete (n) bath, relocate master bedroom and bath, change bedroom to study rm. on 2/f: add a skylight, delete (n) front window works. keep most interior walls, delete (n) rear deck work.Details
revision to approved pa # 201912179735. on 1/f: delete replacement of (e) footing and slab, delete (n) bath, relocate master bedroom and bath, change bedroom to study rm. on 2/f: add a skylight, delete (n) front window works. keep most interior walls, delete (n) rear deck work. | |
| Dec 17, 2019 | Completed final sign-off Oct 2021 | 1427 21st Av | interior remodel 1st fl remodel garage space to have 2 bedrooms 2 full baths, laundry area . 2nd fl enclose lightwell, remodel litchen and bath, convert bedroom to family rm, add rear deckDetails
interior remodel 1st fl remodel garage space to have 2 bedrooms 2 full baths, laundry area . 2nd fl enclose lightwell, remodel litchen and bath, convert bedroom to family rm, add rear deck | $90,000 |