Back to kitchen remodel contractors
A C Contracting
- Based in
- San Francisco
- On San Francisco permits
- Mar 2022 to Jul 2026
- Last 24 months
- 10 permits filed
14 permits since 2000: 11 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 15 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2023 | Completed final sign-off Feb 2024 | 770 Funston Av | remodel existing kitchen and remove a load bearing wall, add new posts and beams. close two windows and add two windows in the kitchen wall. not visible from the streetDetails
remodel existing kitchen and remove a load bearing wall, add new posts and beams. close two windows and add two windows in the kitchen wall. not visible from the street | $50,000 |