Back to bathroom remodel contractors
A C Contracting
- Based in
- San Francisco
- On San Francisco permits
- Mar 2022 to Jul 2026
- Last 24 months
- 10 permits filed
14 permits since 2000: 11 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 in progress. Typically 270 days from filing to permit and 476 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2025 | In progress issued Oct 2025 | 115 28th St | replace existing brick foundation with new concrete foundation and add 1 bathroom downstairs.Details
replace existing brick foundation with new concrete foundation and add 1 bathroom downstairs. | $85,000 |
| Mar 10, 2022 | Completed final sign-off Dec 2024 | 751 03rd Av | permit scope reduced: no adu. interior remodel at first floor to convert garage to habitable space. two visible windows facing 3rd avenue to be replaced from vinyl to wood. create habitable space from garage into living room, 1 bedroom, 1 bathroom.Details
permit scope reduced: no adu. interior remodel at first floor to convert garage to habitable space. two visible windows facing 3rd avenue to be replaced from vinyl to wood. create habitable space from garage into living room, 1 bedroom, 1 bathroom. | $40,000 |