Back to kitchen remodel contractors
A And K Zhou Inc
- Based in
- Daly City
- On San Francisco permits
- Mar 2012 to Oct 2018
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 5 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2017 | Completed final sign-off Jan 2018 | 379 Lakeshore Dr | remodel (e) kitchenand replace new wall mount fireplace at same location on 2nd flr. convert (e) closet to masterbath. r&r water damaged over head beam and add new under deck at rear on 2nd flr. add 1 family room, 1 laundry rm and 2 bedrooms on 1stDetails
remodel (e) kitchenand replace new wall mount fireplace at same location on 2nd flr. convert (e) closet to masterbath. r&r water damaged over head beam and add new under deck at rear on 2nd flr. add 1 family room, 1 laundry rm and 2 bedrooms on 1st | $40,000 |
| Oct 10, 2014 | Completed final sign-off Feb 2015 | 1818 Mason St | first floor interior renovation: kitchen remodel, replace extg tub by shower. add a new bath, and replace wall heat by ceiling furnace.Details
first floor interior renovation: kitchen remodel, replace extg tub by shower. add a new bath, and replace wall heat by ceiling furnace. | $50,000 |
| Mar 28, 2012 | Completed final sign-off Jan 2013 | 1990 09th Av | remodel existing single family house consisting of revisions to interior layout, front entry, rear doors, rear patio. no kitchen or bath work.Details
remodel existing single family house consisting of revisions to interior layout, front entry, rear doors, rear patio. no kitchen or bath work. | $75,000 |
| Mar 26, 2012 | Completed final sign-off Jun 2012 | 75 Junipero Serra Bl | remodel kitchen, remove & replace dryrock back side about 35 sq ft both kitchen area with roof deck.Details
remodel kitchen, remove & replace dryrock back side about 35 sq ft both kitchen area with roof deck. | $10,000 |
| Mar 8, 2012 | Completed final sign-off Jan 2013 | 1990 09th Av | remodel 5 bathrooms.no structural work.remodel kitchen,new light&comply with cec 150 (k).install 1/4" new sheet rock on top wall&ceiling.remove(e)alum & replace fibrrglass clad wood. interior both side&back side property. not visible from stree.200230752-bid&201299193-bid-no penalty-per p.oriordan.Details
remodel 5 bathrooms.no structural work.remodel kitchen,new light&comply with cec 150 (k).install 1/4" new sheet rock on top wall&ceiling.remove(e)alum & replace fibrrglass clad wood. interior both side&back side property. not visible from stree.200230752-bid&201299193-bid-no penalty-per p.oriordan. | $65,000 |