Back to bathroom remodel contractors
A And K Zhou Inc
- Based in
- Daly City
- On San Francisco permits
- Mar 2012 to Oct 2018
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 12 days from filing to permit and 295 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2018 | Completed final sign-off Jan 2020 | 203 09th Av | add on guest room and one bathroom on 1st floor per plan. interior alteration on extg 2nd floor and 3rd floor per plan. relocate extg staircase.Details
add on guest room and one bathroom on 1st floor per plan. interior alteration on extg 2nd floor and 3rd floor per plan. relocate extg staircase. | $8,000 |
| May 2, 2018 | Completed final sign-off Jan 2019 | 14 Calgary St | 1)propose new rear wooden deck at rear yard per plan. 2)add one guest room, one laundry room, one entertainment room and one bathroom at 1st floor plan.Details
1)propose new rear wooden deck at rear yard per plan. 2)add one guest room, one laundry room, one entertainment room and one bathroom at 1st floor plan. | $50,000 |
| Oct 10, 2014 | Completed final sign-off Feb 2015 | 1818 Mason St | first floor interior renovation: kitchen remodel, replace extg tub by shower. add a new bath, and replace wall heat by ceiling furnace.Details
first floor interior renovation: kitchen remodel, replace extg tub by shower. add a new bath, and replace wall heat by ceiling furnace. | $50,000 |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 179 Elmira St | convert existing storage room to family room, add one bedroom, one media room, one storage & two bathrooms on 1st floor per plan.Details
convert existing storage room to family room, add one bedroom, one media room, one storage & two bathrooms on 1st floor per plan. | $47,000 |
| May 20, 2013 | Completed final sign-off Jul 2013 | 724 Thornton Av | remodel 1st floor-add 2 bedrooms, 1 full bathroom & storage roomDetails
remodel 1st floor-add 2 bedrooms, 1 full bathroom & storage room | $43,000 |
| Apr 4, 2013 | Completed final sign-off Mar 2016 | 91 Mendosa Av | renovation & vertical addition of (e) 2 story house proposed to add 2 bedrms & 1 n/bath. will be 3 stories w/6 bedrms, 3 full baths & powder rm. int. renovation includes a n/kitch, dining rm, living rm, fam rm & laundry rm. (e) 2 car garage will remainDetails
renovation & vertical addition of (e) 2 story house proposed to add 2 bedrms & 1 n/bath. will be 3 stories w/6 bedrms, 3 full baths & powder rm. int. renovation includes a n/kitch, dining rm, living rm, fam rm & laundry rm. (e) 2 car garage will remain | $392,000 |
| Mar 28, 2012 | Completed final sign-off Jan 2013 | 1990 09th Av | remodel existing single family house consisting of revisions to interior layout, front entry, rear doors, rear patio. no kitchen or bath work.Details
remodel existing single family house consisting of revisions to interior layout, front entry, rear doors, rear patio. no kitchen or bath work. | $75,000 |
| Mar 8, 2012 | Completed final sign-off Jan 2013 | 1990 09th Av | remodel 5 bathrooms.no structural work.remodel kitchen,new light&comply with cec 150 (k).install 1/4" new sheet rock on top wall&ceiling.remove(e)alum & replace fibrrglass clad wood. interior both side&back side property. not visible from stree.200230752-bid&201299193-bid-no penalty-per p.oriordan.Details
remodel 5 bathrooms.no structural work.remodel kitchen,new light&comply with cec 150 (k).install 1/4" new sheet rock on top wall&ceiling.remove(e)alum & replace fibrrglass clad wood. interior both side&back side property. not visible from stree.200230752-bid&201299193-bid-no penalty-per p.oriordan. | $65,000 |