5 Elements Design
- Based in
- Berkeley
- On San Francisco permits
- Dec 2006 to Nov 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 7 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 98 days from filing to permit and 459 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2019 | Completed final sign-off Mar 2021 | 378 Cumberland St | replace perimeter fence. regrade back yard, add retaining wall, add ext fireplace, add stone stairs, wood platform rear yard, replace stone @ terrace refinish roof deck, repair (e) gate, planter @ roof deck, site lighting, site plantingDetails
replace perimeter fence. regrade back yard, add retaining wall, add ext fireplace, add stone stairs, wood platform rear yard, replace stone @ terrace refinish roof deck, repair (e) gate, planter @ roof deck, site lighting, site planting | $200,000 |