Permit GraphShortlistSan Francisco building permits since 2000

5 Elements Design

Contractor license
868442
State license record
Based in
Berkeley
On San Francisco permits
Dec 2006 to Nov 2022
Last 24 months
0 permits filed

13 permits since 2000: 7 completed, 4 never finaled, 2 expired or cancelled.

Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllRoof deck 1Pergola or trellis 2Deck 2Stairs 1Kitchen remodel 1Bathroom remodel 1

1 kitchen remodel permit: 1 never finaled. Typically 0 days from filing to permit.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 18, 2021Never finaled
issued Aug 2021, no final
33 Clementina Stkitchen remodel, cabinets, fixtures. remodel 3 baths in kind. update elec and plumbing, change out shelving in closets and library. replace appliances. lighting h.e. & per cec 150.0(k)
Details
Permit
202108186633
Status
issued
Filed
Aug 18, 2021
Permit issued
Aug 18, 2021
Declared cost
$250,000
Address
33 Clementina St

kitchen remodel, cabinets, fixtures. remodel 3 baths in kind. update elec and plumbing, change out shelving in closets and library. replace appliances. lighting h.e. & per cec 150.0(k)

Open the permit page

$250,000