Back to bathroom remodel contractors
4 And 5 Construction, Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2016
- Last 24 months
- 0 permits filed
64 permits since 2000: 49 completed, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 2 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 324 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2015 | Completed final sign-off Apr 2016 | 9 Idora Av | kitchen remodel - replacing cabinet, plumbing fixtures and light fixtures. bathroom emodeling - replacing plumbing fixtures tile, floor finishes, - no structural changesDetails
kitchen remodel - replacing cabinet, plumbing fixtures and light fixtures. bathroom emodeling - replacing plumbing fixtures tile, floor finishes, - no structural changes | $20,000 |
| Apr 1, 2014 | Completed final sign-off Apr 2015 | 650 03rd Av | rev. to pa#201402289619- 1/f: remodel kitchen & dining room, add powder room. 2/f: remodel/reconfigure master bedroom, bath & closet, add stair to attic. 3/f: add powder room & skylights to attic (unconditioned).Details
rev. to pa#201402289619- 1/f: remodel kitchen & dining room, add powder room. 2/f: remodel/reconfigure master bedroom, bath & closet, add stair to attic. 3/f: add powder room & skylights to attic (unconditioned). | $110,000 |
| Feb 28, 2014 | Completed final sign-off Apr 2015 | 650 03rd Av | kitchen and master bathroom remodel. no work visible from street. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodelling shall comply with cec 150(k)8 & 150(k)10.Details
kitchen and master bathroom remodel. no work visible from street. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodelling shall comply with cec 150(k)8 & 150(k)10. | $18,287 |
| Apr 19, 2012 | Completed final sign-off Mar 2013 | 1 Sherwood Ct | replace (e) aluminum windows with double glazed windows facing the street. replace kitchen tile counter top & sink with granite top. (no change to cabinets). replace (2) bathroom tiles and fixtures (no change to existing layouts). no change on walls and openings.Details
replace (e) aluminum windows with double glazed windows facing the street. replace kitchen tile counter top & sink with granite top. (no change to cabinets). replace (2) bathroom tiles and fixtures (no change to existing layouts). no change on walls and openings. | $25,000 |
| Jan 10, 2012 | Completed final sign-off Dec 2012 | 167 Beaumont Av | convert storage room and combine extg bedroom to one bedroom at ground floor. remodel extg bath room at garage floor.Details
convert storage room and combine extg bedroom to one bedroom at ground floor. remodel extg bath room at garage floor. | $25,000 |
| Jul 13, 2011 | Completed final sign-off Feb 2012 | 277 32nd Av | install new interior stairs. reconfigure 1st fl rooms into larger rooms, reconfigure 1st fl bath, rotate 1st fl furnace for hallway access, convert 2nd fl powder rm into pantry. convert 2nd fl bath into powder rm, remove part of 2nd floor non structural wallDetails
install new interior stairs. reconfigure 1st fl rooms into larger rooms, reconfigure 1st fl bath, rotate 1st fl furnace for hallway access, convert 2nd fl powder rm into pantry. convert 2nd fl bath into powder rm, remove part of 2nd floor non structural wall | $60,000 |
| Feb 15, 2011 | Completed final sign-off Nov 2011 | 4034 California St | rearrange & change floor plan from 2 bedrooms to 3 bedrooms, eliminate family room. relocate kitchen & kitchen remodeling, bathroom remodeling, change pantry to powder room.Details
rearrange & change floor plan from 2 bedrooms to 3 bedrooms, eliminate family room. relocate kitchen & kitchen remodeling, bathroom remodeling, change pantry to powder room. | $32,000 |
| Jun 22, 2010 | Never finaled issued Aug 2010, no final | 743 Arguello Bl | 24 sf interior addition behind garage, bedroom remodel, new powder room (half bath). all work at unit 1.Details
24 sf interior addition behind garage, bedroom remodel, new powder room (half bath). all work at unit 1. | $25,000 |
| May 28, 2010 | Completed final sign-off May 2011 | 279 29th St | 2 bathroom remodeling - refacing bathroom fixtures, wall & floor finish (no structural work)Details
2 bathroom remodeling - refacing bathroom fixtures, wall & floor finish (no structural work) | $26,537 |
| May 17, 2010 | Completed final sign-off Oct 2011 | 1739 Lake St | add wood deck @ apt 1 & 3. remove 2 partition walls @ apt 3, w/ kitchen remodeling. remove partition wall @ apt 4, add 1 full bath.Details
add wood deck @ apt 1 & 3. remove 2 partition walls @ apt 3, w/ kitchen remodeling. remove partition wall @ apt 4, add 1 full bath. | $15,000 |
| Jan 12, 2010 | Completed final sign-off May 2010 | 140 06th Av | 2nd fl: combine 2 bedrooms into master bedroom, a walkin closet. 1st fl: remove bearing wall br=tn family and diningh. kitchen and 1/2 bath remodeling. add 2 french doors to (e) rear deck.Details
2nd fl: combine 2 bedrooms into master bedroom, a walkin closet. 1st fl: remove bearing wall br=tn family and diningh. kitchen and 1/2 bath remodeling. add 2 french doors to (e) rear deck. | $50,000 |
| Feb 26, 2009 | Completed final sign-off Feb 2010 | 3850 Anza St | remodel (e) bathroom - removal of (e) partition walls & construct new partition walls to create a new master bathroom, replace (e) bathroom fixture & vanities, retile floors. update electrical & plumbing, new closets in (e) master bedroom.Details
remodel (e) bathroom - removal of (e) partition walls & construct new partition walls to create a new master bathroom, replace (e) bathroom fixture & vanities, retile floors. update electrical & plumbing, new closets in (e) master bedroom. | $10,000 |
| Jan 8, 2009 | Completed final sign-off Jan 2010 | 475 04th Av | 2nd floor: remodel extg full bath & kitchen. grnd flr: replace extg deteriate foundation and slab. rearrange room layout to include a family room. office and a toilet. remove n-w corner at rear to preserve oringinal patio. close 3 extg wndw at property line. replace extg wndw with dual glazing wndwDetails
2nd floor: remodel extg full bath & kitchen. grnd flr: replace extg deteriate foundation and slab. rearrange room layout to include a family room. office and a toilet. remove n-w corner at rear to preserve oringinal patio. close 3 extg wndw at property line. replace extg wndw with dual glazing wndw | $48,000 |
| Dec 21, 2007 | Never finaled issued Jan 2008, no final | 748 06th Av | relocate kitchen from rear to front, replace (e) bath with new, add powder room, expand new rear bedroom to be flush with back of bldg, install new furnace & water heater, remove top floor deck enclosure @ rear.Details
relocate kitchen from rear to front, replace (e) bath with new, add powder room, expand new rear bedroom to be flush with back of bldg, install new furnace & water heater, remove top floor deck enclosure @ rear. | $240,000 |
| Jul 9, 2007 | Completed final sign-off Mar 2008 | 263 28th Av | bathroom&kitchen remodel-no structural work. replace counter top,tilesand fixtures-cabinets to remain.install 2 new 24"x36" skylights between joist. 7' from pl.replace existing roofing material.kitchen lite to remain.bathroom lite to be flourescent.Details
bathroom&kitchen remodel-no structural work. replace counter top,tilesand fixtures-cabinets to remain.install 2 new 24"x36" skylights between joist. 7' from pl.replace existing roofing material.kitchen lite to remain.bathroom lite to be flourescent. | $30,000 |
| Feb 8, 2007 | Completed final sign-off Aug 2007 | 743 Arguello Bl | unit #1 - improvement to unit #1 (no structural changes) bathroom remodeling x2 - replacing fixtures & 2 walls. kitchen remodeling - replacing kitchen cabinets and fixture.Details
unit #1 - improvement to unit #1 (no structural changes) bathroom remodeling x2 - replacing fixtures & 2 walls. kitchen remodeling - replacing kitchen cabinets and fixture. | $41,800 |
| Sep 21, 2006 | Completed final sign-off Aug 2007 | 743 Arguello Bl | interior remodel of 1st floor unit in 4 unit building. relocate bathroom and kitchen within habitable spaeDetails
interior remodel of 1st floor unit in 4 unit building. relocate bathroom and kitchen within habitable spae | $32,000 |
| Dec 16, 2004 | Completed final sign-off Apr 2015 | 739 12th Av | 3-story addition into backyard & interior remodeling of (e) space, w/ (n) family rm, office & bath @ 1st fl. expand kitchen & deck @ 2nd fl. (n) master suite & bathrm. bedrm remodel @ 3rd fl.Details
3-story addition into backyard & interior remodeling of (e) space, w/ (n) family rm, office & bath @ 1st fl. expand kitchen & deck @ 2nd fl. (n) master suite & bathrm. bedrm remodel @ 3rd fl. | $500,000 |
| Mar 23, 2001 | Expired or cancelled expired Sep 2001 | 19 Los Palmos Dr | add a bathroom to the back of garage and replace fixtures in existing kitchen and bathroom without aDetails
add a bathroom to the back of garage and replace fixtures in existing kitchen and bathroom without a | $15,000 |