4 And 5 Construction, Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2016
- Last 24 months
- 0 permits filed
64 permits since 2000: 49 completed, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
12 deck permits: 9 completed, 1 never finaled, 2 expired or cancelled. Typically 11 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2014 | Completed final sign-off Apr 2015 | 650 03rd Av | convert existing 4th flr (storage) to occupied multi-use room & powder rm, install auto fire sprinkler & stair landing at 3rd flr per pre-ap meeting findgs. install 2 new deck mounted skylights at roof, insulate roof to r19 standard, relocate (e) 4th flr furnace, add 1-hr fire separation at garageDetails
convert existing 4th flr (storage) to occupied multi-use room & powder rm, install auto fire sprinkler & stair landing at 3rd flr per pre-ap meeting findgs. install 2 new deck mounted skylights at roof, insulate roof to r19 standard, relocate (e) 4th flr furnace, add 1-hr fire separation at garage | $60,000 |
| Aug 24, 2010 | Expired or cancelled expired Nov 2011 | 1346 Powell St | repair back stairs & deck as in kind (dryrot damage) less than 50%.Details
repair back stairs & deck as in kind (dryrot damage) less than 50%. | $18,000 |
| Aug 9, 2010 | Completed final sign-off Nov 2013 | 1350 05th Av | demolition of one story portion @ rear. addition of 2 story @ rear, minor interior remodel. addition includes deck over 1st floor roof. mep under separate permit.Details
demolition of one story portion @ rear. addition of 2 story @ rear, minor interior remodel. addition includes deck over 1st floor roof. mep under separate permit. | $125,000 |
| May 17, 2010 | Completed final sign-off Oct 2011 | 1739 Lake St | add wood deck @ apt 1 & 3. remove 2 partition walls @ apt 3, w/ kitchen remodeling. remove partition wall @ apt 4, add 1 full bath.Details
add wood deck @ apt 1 & 3. remove 2 partition walls @ apt 3, w/ kitchen remodeling. remove partition wall @ apt 4, add 1 full bath. | $15,000 |
| Jan 12, 2010 | Completed final sign-off May 2010 | 140 06th Av | 2nd fl: combine 2 bedrooms into master bedroom, a walkin closet. 1st fl: remove bearing wall br=tn family and diningh. kitchen and 1/2 bath remodeling. add 2 french doors to (e) rear deck.Details
2nd fl: combine 2 bedrooms into master bedroom, a walkin closet. 1st fl: remove bearing wall br=tn family and diningh. kitchen and 1/2 bath remodeling. add 2 french doors to (e) rear deck. | $50,000 |
| Jul 8, 2009 | Completed final sign-off Aug 2009 | 1379 18th Av | repair & replace treads/decking of back stairs damaged by dry rot in kind. less than 30%.Details
repair & replace treads/decking of back stairs damaged by dry rot in kind. less than 30%. | $3,000 |
| Apr 2, 2009 | Completed final sign-off Apr 2009 | 2100 Pine St | revision to permit 2009/0209/1695 (n) post for deck removed - not required & existing.Details
revision to permit 2009/0209/1695 (n) post for deck removed - not required & existing. | |
| Feb 9, 2009 | Completed final sign-off Apr 2009 | 2110 Pine St | deck remodeling/re-inforcingDetails
deck remodeling/re-inforcing | $5,000 |
| Dec 21, 2007 | Never finaled issued Jan 2008, no final | 748 06th Av | relocate kitchen from rear to front, replace (e) bath with new, add powder room, expand new rear bedroom to be flush with back of bldg, install new furnace & water heater, remove top floor deck enclosure @ rear.Details
relocate kitchen from rear to front, replace (e) bath with new, add powder room, expand new rear bedroom to be flush with back of bldg, install new furnace & water heater, remove top floor deck enclosure @ rear. | $240,000 |
| Dec 16, 2004 | Completed final sign-off Apr 2015 | 739 12th Av | 3-story addition into backyard & interior remodeling of (e) space, w/ (n) family rm, office & bath @ 1st fl. expand kitchen & deck @ 2nd fl. (n) master suite & bathrm. bedrm remodel @ 3rd fl.Details
3-story addition into backyard & interior remodeling of (e) space, w/ (n) family rm, office & bath @ 1st fl. expand kitchen & deck @ 2nd fl. (n) master suite & bathrm. bedrm remodel @ 3rd fl. | $500,000 |
| May 6, 2003 | Completed final sign-off Sep 2003 | 77 Lupine Av | exterior wood deck dry rot repairs(rear).less than 50% being replaced.Details
exterior wood deck dry rot repairs(rear).less than 50% being replaced. | $2,000 |
| Apr 14, 2000 | Expired or cancelled expired Oct 2000 | 74 Douglass St | demo interior fixtrues & deck, prepare for bld. extension & remodeling, plans submittedDetails
demo interior fixtrues & deck, prepare for bld. extension & remodeling, plans submitted | $10,000 |