Back to kitchen remodel contractors
38 Degress North Latitude Builders Inc.
- Based in
- San Rafael
- On San Francisco permits
- Jan 2005 to Aug 2026
- Last 24 months
- 4 permits filed
46 permits since 2000: 30 completed, 2 in progress, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 12 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2020 | Completed final sign-off Aug 2022 | 152 22nd Av | remodel kitchen & baths in kind. new finishes through out.Details
remodel kitchen & baths in kind. new finishes through out. | $20,000 |
| Feb 12, 2019 | Completed final sign-off Aug 2022 | 152 22nd Av | remodel basement, finish garage enclose, reconstruct stairs. 1st fl: renovate kitchen, add powder & rear addition. 2nd fl: renovate bath, add 1 1/2 bath, new bedroom. replace front windows in kind with performanceDetails
remodel basement, finish garage enclose, reconstruct stairs. 1st fl: renovate kitchen, add powder & rear addition. 2nd fl: renovate bath, add 1 1/2 bath, new bedroom. replace front windows in kind with performance | $250,000 |
| Oct 5, 2018 | Completed final sign-off Sep 2020 | 139 Welsh St | interior renovation. reconfigure kitchen in extg location. new fixtures and finishes at 3 extg bathrooms. new fixtures/finishes throughout unit.Details
interior renovation. reconfigure kitchen in extg location. new fixtures and finishes at 3 extg bathrooms. new fixtures/finishes throughout unit. | $70,000 |
| Mar 13, 2017 | Completed final sign-off Sep 2017 | 765 Market St | minor kitche remodel, demo one non structural wall and relocate fridge, refinish (e) hardwrrod and replace (e) kitche floor tiles. new casework doors in kitchen cabinetry, new island with new electric outlets, light fixtures and appliancesDetails
minor kitche remodel, demo one non structural wall and relocate fridge, refinish (e) hardwrrod and replace (e) kitche floor tiles. new casework doors in kitchen cabinetry, new island with new electric outlets, light fixtures and appliances | $100,000 |
| Dec 8, 2016 | Completed final sign-off Jun 2017 | 101 Lombard St | unit #706: kitchen, bathroom, living rm and bedroom remodel. new floor finishes , new casework, new bathr tubs and toilet in bathrooms. new light fixturesDetails
unit #706: kitchen, bathroom, living rm and bedroom remodel. new floor finishes , new casework, new bathr tubs and toilet in bathrooms. new light fixtures | $185,000 |
| Feb 24, 2012 | Completed final sign-off Oct 2012 | 765 Market St | unit 35g new interior remodel: new kitchen, new bathrooms, new floor finishes (carpet, hardwood & stone), new cabinetry, new framing, new dry wall, new plumbing & electrical, no load bearing walls will be effected or altered, no exterior work, new plaster. fire sprinkler plan to be separate permit.Details
unit 35g new interior remodel: new kitchen, new bathrooms, new floor finishes (carpet, hardwood & stone), new cabinetry, new framing, new dry wall, new plumbing & electrical, no load bearing walls will be effected or altered, no exterior work, new plaster. fire sprinkler plan to be separate permit. | $119,860 |
| Dec 8, 2011 | Completed final sign-off Aug 2016 | 765 Market St | work @ unit# 32d. (ref to pa 201111028119s). demolition of 1 kitchen & addition of fire rated door to allow access between two units. two units merging into one (block & lot 3706/208 & 3706/207).Details
work @ unit# 32d. (ref to pa 201111028119s). demolition of 1 kitchen & addition of fire rated door to allow access between two units. two units merging into one (block & lot 3706/208 & 3706/207). | $2,050 |
| Nov 2, 2011 | Completed final sign-off Aug 2016 | 765 Market St | work @ unit# 32c (ref pa #201112080307s). demolition of 1 kitchen & addition of fire rated door to allow access between units. two units merging into one.Details
work @ unit# 32c (ref pa #201112080307s). demolition of 1 kitchen & addition of fire rated door to allow access between units. two units merging into one. | $4,100 |
| Mar 12, 2010 | Completed final sign-off Nov 2010 | 765 Market St | merge unit #24c & 24d-remove 1 kitchen, tile powder rm, add new vanity,create new master suite,demo (e) interior walls, new interior walls/framing,electrical,plumbing,tile at master shower,millwork,cabinetry,carpet & paint. no exterior work, all interor walls are non load bearingDetails
merge unit #24c & 24d-remove 1 kitchen, tile powder rm, add new vanity,create new master suite,demo (e) interior walls, new interior walls/framing,electrical,plumbing,tile at master shower,millwork,cabinetry,carpet & paint. no exterior work, all interor walls are non load bearing | $200,000 |
| Dec 7, 2009 | Expired or cancelled expired Nov 2013 | 765 Market St | merge unit 23a with 23b, kitchen in both units to remain. installation of 2 new rated doors in 1 hr partitions btw units. renovation of an (e) bathroom and wood floor installation in existing bedroom. work to take place on unit 23b only at 23rd floor.Details
merge unit 23a with 23b, kitchen in both units to remain. installation of 2 new rated doors in 1 hr partitions btw units. renovation of an (e) bathroom and wood floor installation in existing bedroom. work to take place on unit 23b only at 23rd floor. | $50,000 |
| Aug 28, 2009 | Completed final sign-off Apr 2010 | 765 Market St | condo remodel unit 25g, 25th fl. remodel kitchen, restrooms, bedrooms. demo non bearing partitions, clgs, fixtures, cabs and finishes. new non bearing partitions. new flooring and transitions. outlets, switches and sprinkler head extension under separate permit. apply new paint and finishesDetails
condo remodel unit 25g, 25th fl. remodel kitchen, restrooms, bedrooms. demo non bearing partitions, clgs, fixtures, cabs and finishes. new non bearing partitions. new flooring and transitions. outlets, switches and sprinkler head extension under separate permit. apply new paint and finishes | $100,000 |
| Aug 20, 2009 | Completed final sign-off Feb 2010 | 765 Market St | unit #24d kitchen remodel, demolish & install non-bearing partitions,fixtures,cabinets,finishes; install new doors, install new flooring, provide new lighting fixtures,new outlets & switches; apply new paint,new fire head extension at ceiling (move 1 head/sidewall sprinkler). under separate permit.Details
unit #24d kitchen remodel, demolish & install non-bearing partitions,fixtures,cabinets,finishes; install new doors, install new flooring, provide new lighting fixtures,new outlets & switches; apply new paint,new fire head extension at ceiling (move 1 head/sidewall sprinkler). under separate permit. | $69,000 |
| Feb 27, 2008 | Completed final sign-off Jan 2009 | 765 Market St | 23rd floor-demolition of (e) kitchen, entry and bath. install new framing, plumbing, electrical, insulation and drywall. install new kitchen cabinets, trim, counter tops as per plansDetails
23rd floor-demolition of (e) kitchen, entry and bath. install new framing, plumbing, electrical, insulation and drywall. install new kitchen cabinets, trim, counter tops as per plans | $450,000 |
| Dec 11, 2007 | Never finaled issued Dec 2007, no final | 765 Market St | unit #27a- interior upgrading, no structural changes, plumbing fixtures, lighting, flooring. remove (e) bathroom. relocate kitchen, add low voltage lighting, replcae plumbing fixutes. sprinklers under other permit.Details
unit #27a- interior upgrading, no structural changes, plumbing fixtures, lighting, flooring. remove (e) bathroom. relocate kitchen, add low voltage lighting, replcae plumbing fixutes. sprinklers under other permit. | $400,000 |