Back to bathroom remodel contractors
38 Degress North Latitude Builders Inc.
- Based in
- San Rafael
- On San Francisco permits
- Jan 2005 to Aug 2026
- Last 24 months
- 4 permits filed
46 permits since 2000: 30 completed, 2 in progress, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 12 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Sep 2026 | 765 Market St | unit# ph2g: remodel of guest bathroom. demo tile, remove fixtures, locations to remain. replace with new. add recess lights. no structural work.Details
unit# ph2g: remodel of guest bathroom. demo tile, remove fixtures, locations to remain. replace with new. add recess lights. no structural work. | $45,000 |
| Feb 6, 2025 | Completed final sign-off May 2025 | 765 Market St | 40/fl (penthouse 3d): minor revision from original permit to switch toilet and bath and shower fixture locations. original pa#2024-1219-7167Details
40/fl (penthouse 3d): minor revision from original permit to switch toilet and bath and shower fixture locations. original pa#2024-1219-7167 | |
| Jun 4, 2024 | Completed final sign-off Jun 2024 | 765 Market St | revision to pa# 202401083580: reduction of scope - to remove (3) bathrooms from scope of work.Details
revision to pa# 202401083580: reduction of scope - to remove (3) bathrooms from scope of work. | |
| Jan 8, 2024 | Completed final sign-off Jun 2024 | 765 Market St | ph 3d: the work consist of an interior remodel of 3 extg bathrooms and the replacement of an elevator inside of the penthouse.Details
ph 3d: the work consist of an interior remodel of 3 extg bathrooms and the replacement of an elevator inside of the penthouse. | $70,000 |
| Nov 4, 2020 | Completed final sign-off Aug 2022 | 152 22nd Av | remodel kitchen & baths in kind. new finishes through out.Details
remodel kitchen & baths in kind. new finishes through out. | $20,000 |
| Feb 12, 2019 | Completed final sign-off Aug 2022 | 152 22nd Av | remodel basement, finish garage enclose, reconstruct stairs. 1st fl: renovate kitchen, add powder & rear addition. 2nd fl: renovate bath, add 1 1/2 bath, new bedroom. replace front windows in kind with performanceDetails
remodel basement, finish garage enclose, reconstruct stairs. 1st fl: renovate kitchen, add powder & rear addition. 2nd fl: renovate bath, add 1 1/2 bath, new bedroom. replace front windows in kind with performance | $250,000 |
| Oct 5, 2018 | Completed final sign-off Sep 2020 | 139 Welsh St | interior renovation. reconfigure kitchen in extg location. new fixtures and finishes at 3 extg bathrooms. new fixtures/finishes throughout unit.Details
interior renovation. reconfigure kitchen in extg location. new fixtures and finishes at 3 extg bathrooms. new fixtures/finishes throughout unit. | $70,000 |
| Dec 8, 2016 | Completed final sign-off Jun 2017 | 101 Lombard St | unit #706: kitchen, bathroom, living rm and bedroom remodel. new floor finishes , new casework, new bathr tubs and toilet in bathrooms. new light fixturesDetails
unit #706: kitchen, bathroom, living rm and bedroom remodel. new floor finishes , new casework, new bathr tubs and toilet in bathrooms. new light fixtures | $185,000 |
| Feb 24, 2012 | Completed final sign-off Oct 2012 | 765 Market St | unit 35g new interior remodel: new kitchen, new bathrooms, new floor finishes (carpet, hardwood & stone), new cabinetry, new framing, new dry wall, new plumbing & electrical, no load bearing walls will be effected or altered, no exterior work, new plaster. fire sprinkler plan to be separate permit.Details
unit 35g new interior remodel: new kitchen, new bathrooms, new floor finishes (carpet, hardwood & stone), new cabinetry, new framing, new dry wall, new plumbing & electrical, no load bearing walls will be effected or altered, no exterior work, new plaster. fire sprinkler plan to be separate permit. | $119,860 |
| Nov 1, 2011 | Expired or cancelled withdrawn Dec 2011 | 765 Market St | merger two condos, new kitche, master suite, new floor finishes bathrooms, non-bearing partitions, interior remodel, fire rated door. no exterior work will be done.Details
merger two condos, new kitche, master suite, new floor finishes bathrooms, non-bearing partitions, interior remodel, fire rated door. no exterior work will be done. | $400,000 |
| Apr 2, 2010 | Completed final sign-off Dec 2014 | 2140 Jefferson St | reconfig. of penthouse clg., reconfig. of penthouse bathroom, refinish of hardwood floors, (n) cabinetrym (n) laundry rm. location, (n) fireplace in living rm. demo (e) fireplace in dining rm. (n) 4" line voltage incandescent air tight cans. replacement of a self-enclosed 450 gal. hot tub on upper..Details
reconfig. of penthouse clg., reconfig. of penthouse bathroom, refinish of hardwood floors, (n) cabinetrym (n) laundry rm. location, (n) fireplace in living rm. demo (e) fireplace in dining rm. (n) 4" line voltage incandescent air tight cans. replacement of a self-enclosed 450 gal. hot tub on upper.. | $115,000 |
| Dec 7, 2009 | Expired or cancelled expired Nov 2013 | 765 Market St | merge unit 23a with 23b, kitchen in both units to remain. installation of 2 new rated doors in 1 hr partitions btw units. renovation of an (e) bathroom and wood floor installation in existing bedroom. work to take place on unit 23b only at 23rd floor.Details
merge unit 23a with 23b, kitchen in both units to remain. installation of 2 new rated doors in 1 hr partitions btw units. renovation of an (e) bathroom and wood floor installation in existing bedroom. work to take place on unit 23b only at 23rd floor. | $50,000 |
| Jun 17, 2009 | Completed final sign-off Feb 2010 | 765 Market St | unit 24d - new tile for master & guest bathrm, move elec.switch, add 2 leds,2 new cabs, (n) sink & vanity iin master bath,add wood to guest bath clg, 2 new toto toilets, new tempered glass shower, fur out (e) wall for new pocket dr. work in rm 24dDetails
unit 24d - new tile for master & guest bathrm, move elec.switch, add 2 leds,2 new cabs, (n) sink & vanity iin master bath,add wood to guest bath clg, 2 new toto toilets, new tempered glass shower, fur out (e) wall for new pocket dr. work in rm 24d | $25,000 |
| May 8, 2009 | Completed final sign-off Feb 2010 | 765 Market St | rnovation of kchn cabinetary, remove extg tile floor, removal of kchn counter tops, relocation of 1 partition wall,reconifigure of souther kchn wall. demo of guest bathroom, removal of soffit light at kchn hallway, areas of demo occure will not be "lived in".Details
rnovation of kchn cabinetary, remove extg tile floor, removal of kchn counter tops, relocation of 1 partition wall,reconifigure of souther kchn wall. demo of guest bathroom, removal of soffit light at kchn hallway, areas of demo occure will not be "lived in". | $8,500 |
| Feb 27, 2008 | Completed final sign-off Jan 2009 | 765 Market St | 23rd floor-demolition of (e) kitchen, entry and bath. install new framing, plumbing, electrical, insulation and drywall. install new kitchen cabinets, trim, counter tops as per plansDetails
23rd floor-demolition of (e) kitchen, entry and bath. install new framing, plumbing, electrical, insulation and drywall. install new kitchen cabinets, trim, counter tops as per plans | $450,000 |
| Dec 11, 2007 | Never finaled issued Dec 2007, no final | 765 Market St | unit #27a- interior upgrading, no structural changes, plumbing fixtures, lighting, flooring. remove (e) bathroom. relocate kitchen, add low voltage lighting, replcae plumbing fixutes. sprinklers under other permit.Details
unit #27a- interior upgrading, no structural changes, plumbing fixtures, lighting, flooring. remove (e) bathroom. relocate kitchen, add low voltage lighting, replcae plumbing fixutes. sprinklers under other permit. | $400,000 |