Back to kitchen remodel contractors
369 Construction
- Based in
- San Bruno
- On San Francisco permits
- Mar 2000 to Jun 2023
- Last 24 months
- 0 permits filed
84 permits since 2000: 70 completed, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
33 kitchen remodel permits: 27 completed, 4 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2022 | Completed final sign-off Sep 2023 | 201 Monticello St | remodel kitchen, in-kind like to like: new counter top, tiles, new kitchesn appliance & plumbing fixtures.Details
remodel kitchen, in-kind like to like: new counter top, tiles, new kitchesn appliance & plumbing fixtures. | $35,000 |
| Mar 10, 2022 | Completed final sign-off Aug 2022 | 1251 Gilman Av | kitchen remodel with new appliances & cabinets. upgrade main electrical panel from 50a to 100a.Details
kitchen remodel with new appliances & cabinets. upgrade main electrical panel from 50a to 100a. | $15,000 |
| Dec 27, 2019 | Completed final sign-off May 2020 | 115 Cordova St | kitchen remodelDetails
kitchen remodel | $15,000 |
| Sep 10, 2019 | Completed final sign-off Jan 2020 | 1877 28th Av | remodel 1 kitchen & 1 bath. no floor plan changeDetails
remodel 1 kitchen & 1 bath. no floor plan change | $20,000 |
| Jan 24, 2019 | Completed final sign-off Dec 2019 | 144 Anza St | 1/f: add one bedroom, one office & 1 bathroom per plans. relocate water heater & furnace in garage. 2/f: relocate kitchen area, add one bedroom & 1 bathroom. 3/f: add 1 new bedroom& new bathroom.Details
1/f: add one bedroom, one office & 1 bathroom per plans. relocate water heater & furnace in garage. 2/f: relocate kitchen area, add one bedroom & 1 bathroom. 3/f: add 1 new bedroom& new bathroom. | $80,000 |
| Nov 8, 2018 | Completed final sign-off Feb 2019 | 539 21st Av | kitchen remodel, 12'x10'Details
kitchen remodel, 12'x10' | $10,000 |
| Jun 29, 2018 | Completed final sign-off Oct 2018 | 2101 31st Av | remodel kitchen and bathroom at 2nd floorDetails
remodel kitchen and bathroom at 2nd floor | $20,000 |
| Aug 28, 2017 | Completed final sign-off Mar 2018 | 2115 Mason St | remodel kitchen on 2/f, replace bath tub and sink on 2/f, replace toilet and sink at powder room.Details
remodel kitchen on 2/f, replace bath tub and sink on 2/f, replace toilet and sink at powder room. | $12,000 |
| Mar 20, 2017 | Completed final sign-off Jan 2018 | 162 Bridgeview Dr | remodel e kitchen on 2nd fl. remove walls between kitchen and living rmDetails
remodel e kitchen on 2nd fl. remove walls between kitchen and living rm | $12,000 |
| Oct 5, 2016 | Never finaled issued Oct 2016, no final | 2431 Wawona St | replace 2 bathrooms, floor tile, replace kitchen floor tile & top cabinet & counter top. no walls to be altered.Details
replace 2 bathrooms, floor tile, replace kitchen floor tile & top cabinet & counter top. no walls to be altered. | $13,000 |
| Sep 15, 2015 | Completed final sign-off Dec 2017 | 541 21st Av | 1. kitchen remodel includ. replacing cabinet, counter and floor. 2. bath remodel to main bath replace fixtures and tile. 3. replace closet door to sliding door.Details
1. kitchen remodel includ. replacing cabinet, counter and floor. 2. bath remodel to main bath replace fixtures and tile. 3. replace closet door to sliding door. | $15,000 |
| Jul 31, 2014 | Completed final sign-off Oct 2014 | 580 Ramsell St | remodel (e) kitchen.Details
remodel (e) kitchen. | $12,000 |
| Jun 30, 2014 | Completed final sign-off May 2016 | 2486 Geary Bl | bpa for response to corrrection notice & notice dated 4/22/14 by inspector l. rafael for fire damage. project will restor interior in-kind prior to fire: 3 bedrooms, 1 bath, 1 kitchen, 1 hallway, 1 family room, incl 6 windows: 2 at front facade (wood), 4 at side and rear not visible from st, vinyl .Details
bpa for response to corrrection notice & notice dated 4/22/14 by inspector l. rafael for fire damage. project will restor interior in-kind prior to fire: 3 bedrooms, 1 bath, 1 kitchen, 1 hallway, 1 family room, incl 6 windows: 2 at front facade (wood), 4 at side and rear not visible from st, vinyl . | $120,000 |
| May 28, 2014 | Completed final sign-off Sep 2014 | 4482 Mission St | provide ada accessible toilet at commercial space and relocate counters. and equipment on ground floor. add new hand sink with side splash guards, food preparation sink with one drainboard. new tile at kitchen and prep area, for employee and frp panels at kitchen wall and prep area per health deptDetails
provide ada accessible toilet at commercial space and relocate counters. and equipment on ground floor. add new hand sink with side splash guards, food preparation sink with one drainboard. new tile at kitchen and prep area, for employee and frp panels at kitchen wall and prep area per health dept | $12,000 |
| Dec 9, 2013 | Never finaled issued Dec 2013, no final | 1527 Clement St | revision to pa 2012/0330/7257 see clouded areas on plans. includes: alteration of 1st floor bathroom, alter 2nd floor bathroom and add 1-new bathroom, change kitchen layout. alter 3rd floor bathroom and add 1-new bathroom, change kitchen layout. misc wall and cabinets to be added or changed.Details
revision to pa 2012/0330/7257 see clouded areas on plans. includes: alteration of 1st floor bathroom, alter 2nd floor bathroom and add 1-new bathroom, change kitchen layout. alter 3rd floor bathroom and add 1-new bathroom, change kitchen layout. misc wall and cabinets to be added or changed. | $20,000 |
| Jul 13, 2012 | Completed final sign-off Sep 2012 | 367 20th Av | replace (e) kitchen top cabinet, wall tile, and floor tile, repl (e) bathroom floor and wall tileDetails
replace (e) kitchen top cabinet, wall tile, and floor tile, repl (e) bathroom floor and wall tile | $4,200 |
| May 15, 2012 | Completed final sign-off Aug 2012 | 2379 43rd Av | replace upper cabinet & tile at kitchen, replace floor tile at kitchen on 2/fDetails
replace upper cabinet & tile at kitchen, replace floor tile at kitchen on 2/f | $6,000 |
| Mar 22, 2012 | Completed final sign-off Jul 2012 | 2375 43rd Av | replace 3 windows at rear side of bldg & 1 window at lightwell. replace upper cabinet & tile floor at kitchen. replace bathroom floor tile & wall tile. max u factor 0.40.Details
replace 3 windows at rear side of bldg & 1 window at lightwell. replace upper cabinet & tile floor at kitchen. replace bathroom floor tile & wall tile. max u factor 0.40. | $12,000 |
| Aug 23, 2011 | Completed final sign-off Aug 2012 | 1425 Eucalyptus Dr | repair rear wall stucco, approx 100 sq.ft. replace kitchen countertop only.Details
repair rear wall stucco, approx 100 sq.ft. replace kitchen countertop only. | $4,000 |
| Aug 8, 2011 | Completed final sign-off Dec 2011 | 1150 Quintara St | at garage level. legalize (e) family, full bath and laundry and replace (e) garage door. at 2nd level, remove wall between (e) kitchen and dining and remodel (e) and bathroomDetails
at garage level. legalize (e) family, full bath and laundry and replace (e) garage door. at 2nd level, remove wall between (e) kitchen and dining and remodel (e) and bathroom | $35,000 |
| Mar 1, 2011 | Never finaled issued Mar 2011, no final | 1434 29th Av | remodel (e) kitchen and bathroom on 2nd flr: lighting to comply with 150(k) no change to wall and window, doorsDetails
remodel (e) kitchen and bathroom on 2nd flr: lighting to comply with 150(k) no change to wall and window, doors | $12,000 |
| Dec 17, 2010 | Completed final sign-off May 2011 | 609 43rd Av | replace extg kitchen floor tiles and bathroom tiles, floor, and wall.Details
replace extg kitchen floor tiles and bathroom tiles, floor, and wall. | $5,000 |
| Aug 23, 2010 | Completed final sign-off Oct 2010 | 431 Burnett Av | remodel (e) kitchen on second flr. non-structural, in-kind. at least 50% high efficacy lighting (by wattage).Details
remodel (e) kitchen on second flr. non-structural, in-kind. at least 50% high efficacy lighting (by wattage). | $7,000 |
| Aug 11, 2010 | Expired or cancelled withdrawn Oct 2010 | 430 Burnett Av | remodel (e) kitchen on 2nd. flr. non-structural, in-kind.Details
remodel (e) kitchen on 2nd. flr. non-structural, in-kind. | $7,000 |
| Jul 13, 2010 | Completed final sign-off Oct 2010 | 370 25th Av | replace e kitchen cabinets, tile, at 3rd fl. 2 bathrooms, wall and floor tile at 3rd fl. no structural or new lightingDetails
replace e kitchen cabinets, tile, at 3rd fl. 2 bathrooms, wall and floor tile at 3rd fl. no structural or new lighting | $13,000 |
| May 6, 2010 | Completed final sign-off Jun 2010 | 2205 46th Av | kitchen floor tile only. no other workDetails
kitchen floor tile only. no other work | $3,800 |
| Dec 21, 2009 | Completed final sign-off May 2010 | 2333 Lawton St | kitchen remodel, replace counter top, cabinets, sink, floor & tiles. remodel 2 bathrooms, replace sinks, tub, toile, floor & tiles. new lighting.Details
kitchen remodel, replace counter top, cabinets, sink, floor & tiles. remodel 2 bathrooms, replace sinks, tub, toile, floor & tiles. new lighting. | $23,000 |
| Mar 3, 2009 | Completed final sign-off Jul 2009 | 1025 Stanyan St | alternations to unit #3 & #6, convert existing kitchen to 2nd bedroom, new kitchen in living room, occuring on the 2nd and 3rd floors. alter laundry on 1st floor. minor window repair at rear at 2nd and 3rd floors.Details
alternations to unit #3 & #6, convert existing kitchen to 2nd bedroom, new kitchen in living room, occuring on the 2nd and 3rd floors. alter laundry on 1st floor. minor window repair at rear at 2nd and 3rd floors. | $35,000 |
| Feb 26, 2009 | Completed final sign-off May 2009 | 518 Plymouth Av | new cabinet (kitchen), granit counter top (kitchen), floor tile (kitchen).Details
new cabinet (kitchen), granit counter top (kitchen), floor tile (kitchen). | $8,000 |
| Dec 5, 2008 | Completed final sign-off May 2009 | 1335 39th Av | new cabinet (kitchen) granit counter top, floor tile.Details
new cabinet (kitchen) granit counter top, floor tile. | $8,000 |
| Aug 21, 2007 | Completed final sign-off Feb 2008 | 622 33rd Av | remodel (e) workshop & bath @ first floor, remodel (e) bath & kitchen w second floor (house#622) & add (n) bath @ second floor upgrade (e) water heater & furnanceDetails
remodel (e) workshop & bath @ first floor, remodel (e) bath & kitchen w second floor (house#622) & add (n) bath @ second floor upgrade (e) water heater & furnance | $10,000 |
| May 11, 2005 | Expired or cancelled expired Mar 2006 | 232 Broad St | replace exist kitchen and bathroom tile floor.Details
replace exist kitchen and bathroom tile floor. | $3,000 |
| Jul 24, 2002 | Never finaled issued Jul 2002, no final | 1249 19th Av | replace exiting kitchen tile & bathroom tile floor.Details
replace exiting kitchen tile & bathroom tile floor. | $5,000 |