Back to bathroom remodel contractors
369 Construction
- Based in
- San Bruno
- On San Francisco permits
- Mar 2000 to Jun 2023
- Last 24 months
- 0 permits filed
84 permits since 2000: 70 completed, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 19 completed, 6 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2019 | Completed final sign-off Jan 2020 | 1877 28th Av | remodel 1 kitchen & 1 bath. no floor plan changeDetails
remodel 1 kitchen & 1 bath. no floor plan change | $20,000 |
| Jan 24, 2019 | Completed final sign-off Dec 2019 | 144 Anza St | 1/f: add one bedroom, one office & 1 bathroom per plans. relocate water heater & furnace in garage. 2/f: relocate kitchen area, add one bedroom & 1 bathroom. 3/f: add 1 new bedroom& new bathroom.Details
1/f: add one bedroom, one office & 1 bathroom per plans. relocate water heater & furnace in garage. 2/f: relocate kitchen area, add one bedroom & 1 bathroom. 3/f: add 1 new bedroom& new bathroom. | $80,000 |
| Aug 17, 2018 | Never finaled issued Aug 2018, no final | 132 Maddux Av | add one laundry room, one study room, one family room, and one bathroom on 1st fl per plan.Details
add one laundry room, one study room, one family room, and one bathroom on 1st fl per plan. | $8,000 |
| Jun 29, 2018 | Completed final sign-off Oct 2018 | 2101 31st Av | remodel kitchen and bathroom at 2nd floorDetails
remodel kitchen and bathroom at 2nd floor | $20,000 |
| Aug 28, 2017 | Completed final sign-off Mar 2018 | 2115 Mason St | remodel kitchen on 2/f, replace bath tub and sink on 2/f, replace toilet and sink at powder room.Details
remodel kitchen on 2/f, replace bath tub and sink on 2/f, replace toilet and sink at powder room. | $12,000 |
| Jul 10, 2017 | Completed final sign-off Aug 2017 | 1133 Silliman St | replace two bathrooms tiles on 2nd floorDetails
replace two bathrooms tiles on 2nd floor | $4,000 |
| Oct 5, 2016 | Never finaled issued Oct 2016, no final | 2431 Wawona St | replace 2 bathrooms, floor tile, replace kitchen floor tile & top cabinet & counter top. no walls to be altered.Details
replace 2 bathrooms, floor tile, replace kitchen floor tile & top cabinet & counter top. no walls to be altered. | $13,000 |
| Sep 15, 2015 | Completed final sign-off Dec 2017 | 541 21st Av | 1. kitchen remodel includ. replacing cabinet, counter and floor. 2. bath remodel to main bath replace fixtures and tile. 3. replace closet door to sliding door.Details
1. kitchen remodel includ. replacing cabinet, counter and floor. 2. bath remodel to main bath replace fixtures and tile. 3. replace closet door to sliding door. | $15,000 |
| May 28, 2015 | Completed final sign-off Sep 2015 | 668 21st Av | legalize two bedroom, two full bathroom. convert (e) family room into new bedroom. all work at ground floor.Details
legalize two bedroom, two full bathroom. convert (e) family room into new bedroom. all work at ground floor. | $42,000 |
| Jun 30, 2014 | Completed final sign-off May 2016 | 2486 Geary Bl | bpa for response to corrrection notice & notice dated 4/22/14 by inspector l. rafael for fire damage. project will restor interior in-kind prior to fire: 3 bedrooms, 1 bath, 1 kitchen, 1 hallway, 1 family room, incl 6 windows: 2 at front facade (wood), 4 at side and rear not visible from st, vinyl .Details
bpa for response to corrrection notice & notice dated 4/22/14 by inspector l. rafael for fire damage. project will restor interior in-kind prior to fire: 3 bedrooms, 1 bath, 1 kitchen, 1 hallway, 1 family room, incl 6 windows: 2 at front facade (wood), 4 at side and rear not visible from st, vinyl . | $120,000 |
| Dec 9, 2013 | Never finaled issued Dec 2013, no final | 1527 Clement St | revision to pa 2012/0330/7257 see clouded areas on plans. includes: alteration of 1st floor bathroom, alter 2nd floor bathroom and add 1-new bathroom, change kitchen layout. alter 3rd floor bathroom and add 1-new bathroom, change kitchen layout. misc wall and cabinets to be added or changed.Details
revision to pa 2012/0330/7257 see clouded areas on plans. includes: alteration of 1st floor bathroom, alter 2nd floor bathroom and add 1-new bathroom, change kitchen layout. alter 3rd floor bathroom and add 1-new bathroom, change kitchen layout. misc wall and cabinets to be added or changed. | $20,000 |
| Jun 14, 2013 | Completed final sign-off Oct 2013 | 1500 Silliman St | add 2 bedrooms, 1 new bath, 1 laundry room on gr floor. replace existing furnaceDetails
add 2 bedrooms, 1 new bath, 1 laundry room on gr floor. replace existing furnace | $35,000 |
| Jul 13, 2012 | Completed final sign-off Sep 2012 | 367 20th Av | replace (e) kitchen top cabinet, wall tile, and floor tile, repl (e) bathroom floor and wall tileDetails
replace (e) kitchen top cabinet, wall tile, and floor tile, repl (e) bathroom floor and wall tile | $4,200 |
| Mar 22, 2012 | Completed final sign-off Jul 2012 | 2375 43rd Av | replace 3 windows at rear side of bldg & 1 window at lightwell. replace upper cabinet & tile floor at kitchen. replace bathroom floor tile & wall tile. max u factor 0.40.Details
replace 3 windows at rear side of bldg & 1 window at lightwell. replace upper cabinet & tile floor at kitchen. replace bathroom floor tile & wall tile. max u factor 0.40. | $12,000 |
| Jan 3, 2012 | Never finaled issued Jan 2012, no final | 2634 Alemany Bl | replace cabinet and floor tile, replace bathroom, tile at 2nd flr, no tub or etc no new lightingDetails
replace cabinet and floor tile, replace bathroom, tile at 2nd flr, no tub or etc no new lighting | $6,000 |
| Aug 8, 2011 | Completed final sign-off Dec 2011 | 1150 Quintara St | at garage level. legalize (e) family, full bath and laundry and replace (e) garage door. at 2nd level, remove wall between (e) kitchen and dining and remodel (e) and bathroomDetails
at garage level. legalize (e) family, full bath and laundry and replace (e) garage door. at 2nd level, remove wall between (e) kitchen and dining and remodel (e) and bathroom | $35,000 |
| Mar 1, 2011 | Never finaled issued Mar 2011, no final | 1434 29th Av | remodel (e) kitchen and bathroom on 2nd flr: lighting to comply with 150(k) no change to wall and window, doorsDetails
remodel (e) kitchen and bathroom on 2nd flr: lighting to comply with 150(k) no change to wall and window, doors | $12,000 |
| Jan 14, 2011 | Expired or cancelled expired Oct 2014 | 119 Corona St | add new bathroom on 1st floor.no work on 2nd floor.Details
add new bathroom on 1st floor.no work on 2nd floor. | $10,000 |
| Dec 17, 2010 | Completed final sign-off May 2011 | 609 43rd Av | replace extg kitchen floor tiles and bathroom tiles, floor, and wall.Details
replace extg kitchen floor tiles and bathroom tiles, floor, and wall. | $5,000 |
| Jul 13, 2010 | Completed final sign-off Oct 2010 | 370 25th Av | replace e kitchen cabinets, tile, at 3rd fl. 2 bathrooms, wall and floor tile at 3rd fl. no structural or new lightingDetails
replace e kitchen cabinets, tile, at 3rd fl. 2 bathrooms, wall and floor tile at 3rd fl. no structural or new lighting | $13,000 |
| Feb 3, 2010 | Completed final sign-off Mar 2010 | 1706 40th Av | replace furnace & water heater @ garage. replace vanity, sink & ventilation fan in bathrooms on 2nd. floor. repair 6-lights & 6-switches in bathroom, bedroom & living rm. replace fire burn damaged wood in kind at hallway @ ceiling.Details
replace furnace & water heater @ garage. replace vanity, sink & ventilation fan in bathrooms on 2nd. floor. repair 6-lights & 6-switches in bathroom, bedroom & living rm. replace fire burn damaged wood in kind at hallway @ ceiling. | $30,000 |
| Dec 21, 2009 | Completed final sign-off May 2010 | 2333 Lawton St | kitchen remodel, replace counter top, cabinets, sink, floor & tiles. remodel 2 bathrooms, replace sinks, tub, toile, floor & tiles. new lighting.Details
kitchen remodel, replace counter top, cabinets, sink, floor & tiles. remodel 2 bathrooms, replace sinks, tub, toile, floor & tiles. new lighting. | $23,000 |
| Dec 11, 2007 | Completed final sign-off Feb 2008 | 622 33rd Av | revision to pa# 200708210443-new water and dryer, modify (e) bath on 1/f, legalize (e) bath layout/shelfDetails
revision to pa# 200708210443-new water and dryer, modify (e) bath on 1/f, legalize (e) bath layout/shelf | $15,000 |
| Aug 21, 2007 | Completed final sign-off Feb 2008 | 622 33rd Av | remodel (e) workshop & bath @ first floor, remodel (e) bath & kitchen w second floor (house#622) & add (n) bath @ second floor upgrade (e) water heater & furnanceDetails
remodel (e) workshop & bath @ first floor, remodel (e) bath & kitchen w second floor (house#622) & add (n) bath @ second floor upgrade (e) water heater & furnance | $10,000 |
| May 11, 2005 | Expired or cancelled expired Mar 2006 | 232 Broad St | replace exist kitchen and bathroom tile floor.Details
replace exist kitchen and bathroom tile floor. | $3,000 |
| Jul 24, 2002 | Never finaled issued Jul 2002, no final | 1249 19th Av | replace exiting kitchen tile & bathroom tile floor.Details
replace exiting kitchen tile & bathroom tile floor. | $5,000 |
| Jan 8, 2001 | Completed final sign-off Apr 2001 | 273 Ellington Av | rev. appl#200007145216 to add a family room & change toilet to a full bathDetails
rev. appl#200007145216 to add a family room & change toilet to a full bath | $5,000 |