Back to kitchen remodel contractors
3 D Design & Construction Inc
- Based in
- San Anselmo
- On San Francisco permits
- Nov 2009 to May 2015
- Last 24 months
- 0 permits filed
28 permits since 2000: 27 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2015 | Completed final sign-off May 2015 | 154 Lombard St | remodel 2 bathrooms, replace plumbing and electrical fixtures, & 2 vent fans, create pass-thru at kitchen to diningroom wall. install new living room cabinetry, replace (1) sliding glass door & (1) window not visible from street; maher n/aDetails
remodel 2 bathrooms, replace plumbing and electrical fixtures, & 2 vent fans, create pass-thru at kitchen to diningroom wall. install new living room cabinetry, replace (1) sliding glass door & (1) window not visible from street; maher n/a | $54,350 |
| May 9, 2014 | Completed final sign-off Dec 2014 | 340 Post St | 3rd floor culinary center:scope includes new student work stations with new kitchen equipment in the extg culinary center and new dishwasher in the extg scullery with associated plumbing work.Details
3rd floor culinary center:scope includes new student work stations with new kitchen equipment in the extg culinary center and new dishwasher in the extg scullery with associated plumbing work. | $25,000 |
| Aug 5, 2013 | Completed final sign-off Dec 2013 | 150 Lombard St | unit 901j - remodel kitchen & 2 bathrooms; new hardwood flooring ; relocate elec. panel out of close per code reqt; install new light fixtures; new paint; all new lighting shall be "led" in the kitchen & bathrooms, exist bathroom exhaust fan to remain.Details
unit 901j - remodel kitchen & 2 bathrooms; new hardwood flooring ; relocate elec. panel out of close per code reqt; install new light fixtures; new paint; all new lighting shall be "led" in the kitchen & bathrooms, exist bathroom exhaust fan to remain. | $72,000 |
| Oct 16, 2012 | Completed final sign-off Feb 2013 | 3250 Van Ness Av | tenant improvement of accessory use of the space for test kitchen, new appliances, cabinetry, finishes & non structural partitionsDetails
tenant improvement of accessory use of the space for test kitchen, new appliances, cabinetry, finishes & non structural partitions | $425,000 |
| Sep 6, 2012 | Completed final sign-off Mar 2013 | 101 Lombard St | remodel bathroom, reface kitchen cabinets, install new lighting, new counter top, refinish floors, paint, install new built in cabinets.Details
remodel bathroom, reface kitchen cabinets, install new lighting, new counter top, refinish floors, paint, install new built in cabinets. | $80,000 |
| Feb 25, 2010 | Completed final sign-off May 2011 | 2132 Bryant St | remodel e dwelling. reconfigure interior halls, remodel kitchen and 1 bath, 1 new bath. partial n roof framing, replacment of windows and doors, replace interior stair, reconfigure interior lightwell/court, n gas furnaces, hot water and gas fireplace insertDetails
remodel e dwelling. reconfigure interior halls, remodel kitchen and 1 bath, 1 new bath. partial n roof framing, replacment of windows and doors, replace interior stair, reconfigure interior lightwell/court, n gas furnaces, hot water and gas fireplace insert | $85,000 |